Install the Energy Management Control System – Phase II at Thule AB, Greenland
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DS22B0009
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- Place of performance
- Greenland
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks installation of Phase II of an Energy Management Control System at Thule Air Base in Greenland. The U.S. Army Corps of Engineers Engineering District New York will award a firm-fixed-price contract to install sensors, actuators, interface devices and fiber optic communications in 67 additional buildings. The upgraded system must be compatible with existing controls, support occupancy scheduling and temperature set points, and accommodate future utility changes. Bids are due by September 6, 2022 and award will be made to the lowest priced, responsive and responsible bidder.
This opportunity is restricted to Danish and Greenlandic firms only, with a projected value between 5 to 10 million Danish Kroners to be performed at Thule Air Base in Greenland. The upgraded controls will manage heating, lighting and utilities in 67 buildings over 570 days. Six bids were received ranging from 32.35 to 44.96 million Danish kroner in response to NAICS codes 237910 and 562910. No set-aside designation was used.
Notice text
5 versions
Update #5 · Latest ·
Note 1: As of 16 August 2022 Amendment 0001 has been posted.
Note 2: As of 18 August 2022 Amendment 0002 has been posted.
Note 3: As of 30 August 2022 Amendment 0003 has been posted.
Note 4: As of 08 September 2022 Bid Abstract has been posted.
This will be a competitive, Invitation for Bid (IFB) Solicitation to Install the Energy Management Control System – Phase II at Thule AB, Greenland.
Install Phase 2 of Energy Management and Control System (EMCS) in 67 buildings and above ground utility systems that were not included in the WWCX 03-1004A. The system will include sensors, actuators, and interface devices within buildings and limited fiber optic communications to interconnect buildings and will be compatible with existing the system installed by WWCX 03-1004A and with planned changes to central heating utility. Control action will be limited to facilities identified. System will control heating and lighting per occupancy schedules and limit the range of temperatures selectable by the user to prevent overheating areas or allowing areas to freeze.
This procurement is restricted to Danish and Greenlandic Firms only.
Update #4 ·
Note 1: As of 16 August 2022 Amendment 0001 has been posted.
Note 2: As of 18 August 2022 Amendment 0002 has been posted.
Note 3: As of 30 August 2022 Amendment 0003 has been posted.
This will be a competitive, Invitation for Bid (IFB) Solicitation to Install the Energy Management Control System – Phase II at Thule AB, Greenland.
Install Phase 2 of Energy Management and Control System (EMCS) in 67 buildings and above ground utility systems that were not included in the WWCX 03-1004A. The system will include sensors, actuators, and interface devices within buildings and limited fiber optic communications to interconnect buildings and will be compatible with existing the system installed by WWCX 03-1004A and with planned changes to central heating utility. Control action will be limited to facilities identified. System will control heating and lighting per occupancy schedules and limit the range of temperatures selectable by the user to prevent overheating areas or allowing areas to freeze.
This procurement is restricted to Danish and Greenlandic Firms only.
Update #3 ·
Note 1: As of 16 August 2022 Amendment 0001 has been posted.
Note 2: As of 18 August 2022 Amendment 0002 has been posted.
This will be a competitive, Invitation for Bid (IFB) Solicitation to Install the Energy Management Control System – Phase II at Thule AB, Greenland.
Install Phase 2 of Energy Management and Control System (EMCS) in 67 buildings and above ground utility systems that were not included in the WWCX 03-1004A. The system will include sensors, actuators, and interface devices within buildings and limited fiber optic communications to interconnect buildings and will be compatible with existing the system installed by WWCX 03-1004A and with planned changes to central heating utility. Control action will be limited to facilities identified. System will control heating and lighting per occupancy schedules and limit the range of temperatures selectable by the user to prevent overheating areas or allowing areas to freeze.
This procurement is restricted to Danish and Greenlandic Firms only.
Update #2 ·
Note: As of 16 August 2022 Amendment 0001 has been posted.
This will be a competitive, Invitation for Bid (IFB) Solicitation to Install the Energy Management Control System – Phase II at Thule AB, Greenland.
Install Phase 2 of Energy Management and Control System (EMCS) in 67 buildings and above ground utility systems that were not included in the WWCX 03-1004A. The system will include sensors, actuators, and interface devices within buildings and limited fiber optic communications to interconnect buildings and will be compatible with existing the system installed by WWCX 03-1004A and with planned changes to central heating utility. Control action will be limited to facilities identified. System will control heating and lighting per occupancy schedules and limit the range of temperatures selectable by the user to prevent overheating areas or allowing areas to freeze.
This procurement is restricted to Danish and Greenlandic Firms only.
Update #1 ·
This will be a competitive, Invitation for Bid (IFB) Solicitation to Install the Energy Management Control System – Phase II at Thule AB, Greenland.
Install Phase 2 of Energy Management and Control System (EMCS) in 67 buildings and above ground utility systems that were not included in the WWCX 03-1004A. The system will include sensors, actuators, and interface devices within buildings and limited fiber optic communications to interconnect buildings and will be compatible with existing the system installed by WWCX 03-1004A and with planned changes to central heating utility. Control action will be limited to facilities identified. System will control heating and lighting per occupancy schedules and limit the range of temperatures selectable by the user to prevent overheating areas or allowing areas to freeze.
This procurement is restricted to Danish and Greenlandic Firms only.
Files
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| Install the Energy Management Control System – Phase II at Thule AB, Greenland | Award Notice | |
| This notice | Solicitation | |
| Install the Energy Management Control System – Phase II at Thule AB, Greenland | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FTG247 Replace UPS at IDT1, Fort Greely, Alaska | ENDIST Alaska | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity