Install the Energy Management Control System – Phase II at Thule AB, Greenland
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912DS22S0028
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- Place of performance
- Greenland
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District New York intends to issue a solicitation seeking a firm fixed price contract to install Phase II of an Energy Management and Control System at Thule Air Base in Greenland. The contractor will be required to commence design within five calendar days of receipt of the notice to proceed and begin construction in summer 2023. The system will include sensors, actuators and fiber optic communications to interconnect buildings and be compatible with existing systems. The work is estimated to cost between $4-8 million and the government intends to award the contract in June/July 2022.
There is no set-aside designation for this opportunity. The work will involve installing the EMCS in 67 buildings and above ground utility systems not covered under a previous contract. Liquidated damages of approximately $1,850 per calendar day will be assessed until all work is completed. This procurement is restricted to Danish and Greenlandic firms only. The estimated value ranges from $4-8 million to install the system by summer 2023 across 67 buildings at Thule Air Base in Greenland.
Notice text
The New York District of the U.S. Army Corps of Engineers (USACE) intends to issue a solicitation package seeking to award a Firm Fixed Price (FFP) contract to Install the Energy Management Control System – Phase II at Thule AB, Greenland.
This will be a competitive, Invitation for Bid (IFB) Solicitation. General Conditions at Thule Air Base: The location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May and/or October. Additionally, Thule's location demands that all supplies/personnel must be shipped /transported in/out via air/sealift. Thule Air Base is not a commercial air/seaport and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The region is glaciated, and the existing soil is generally permafrost, which exists from 1 to 6 feet below the surface to a measured depth of 1,600 feet. Winter temperatures average between 20 -30 degrees F below zero while average summer temperatures are between 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, on or about 1 July. There are two sealifts that leave from Copenhagen, Denmark to Thule AB, one in July & one in August. Airlifting any materials or equipment via military aircraft is very expensive and only normally allowed on an emergency-need basis.
Project Description:
Install Phase 2 of Energy Management and Control System (EMCS) in 67 buildings and above ground utility systems that were not included in the WWCX 03-1004A. The system will include sensors, actuators, and interface devices within buildings and limited fiber optic communications to interconnect buildings and will be compatible with existing the system installed by WWCX 03-1004A and with planned changes to central heating utility. Control action will be limited to facilities identified. System will control heating and lighting per occupancy schedules and limit the range of temperatures selectable by the user to prevent overheating areas or allowing areas to freeze.
Once the contract is awarded, the contractor will be required to commence design within five (5) calendar days after the date of receipt of the notice to proceed and construction will begin in the summer of 2023.
The work is estimated to cost between $4,000,000 and $8,000,000. It is the intention of the government to award in June/July 2022.
Liquidated Damages of approximately $1,850.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.
This procurement is restricted to Danish and Greenlandic Firms only.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Install the Energy Management Control System – Phase II at Thule AB, Greenland | Award Notice | |
| Install the Energy Management Control System – Phase II at Thule AB, Greenland | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FTG247 Replace UPS at IDT1, Fort Greely, Alaska | ENDIST Alaska | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity