This document contains an abstract of offers for a construction project and related federal contract opportunity. The U.S. Army Corps of Engineers, New York District is soliciting bids to install Phase 2 of an Energy Management and Control System at Thule Air Base in Greenland under solicitation number W912DS22B0009. Bids were due on September 6, 2022 and six bids were received ranging from 32.35 to 44.96 million Danish kroner. The project involves installing sensors, actuators and fiber optic communications in 67 additional buildings beyond those covered under a previous contract. The upgraded system will control heating and lighting according to occupancy schedules. The opportunity is restricted to Danish and Greenlandic firms.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGES
7A. ITEM
NO.
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
D. UNIT
PRICE
1 1 Job 26,214,956.00 kr.
2 1 Job 100,000.00 kr.
3 1 Job 808,395.00 kr.
4 1 Job 3,081,248.00 kr.
5 1 Job 2,456,550.00 kr.
6 1 Job 358,433.00 kr.
Base Total 26,314,956.00 kr.
Options Total
6,704,626.00 kr.
GRAND
TOTAL
33,019,582.00 kr.
2,493,708.00 kr.
487,334.00 kr.
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER
W912DS22B0009
2. DATE ISSUED
21 July 2022
3. DATE OPENED
06 September 2022
B. BID SECURITY (Type and amount)
4. ISSUING OFFICE
U.S. Army Corps of Engineers, New York District Contracting Division
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL: Adrian Stafford-Browne, Contract Specialist
SIGNATURE DATE SIGNED
06 September 2022
5. PROJECT TITLE
Install Phase 2 of Energy Management and Control System (EMCS) at Thule Air Base, Greenland
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
9. OFFERS
NO. 1 NO. 2
MT Hogaard Gronland ApS Per Aarsleff A/S
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount)
6. NUMBER OF AMENDMENTS ISSUED: 3 C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
7B. DESCRIPTION OF OFFERED ITEM E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
Phase 2 EMCS Upgrade Section 01 11 00 para 1.4 33,822,179.00 kr. 32,350,000.00 kr.
Phase 2 EMCS Upgrade Preparation of As-Build set of drawings.
100,000.00 kr. 117,600.00 kr.
7,731,964.00 kr.
Option 1 - Phase 2 EMCS Upgrade 01 11 00 paragraph 1.5 3,035,695.00 kr. 2,203,706.00 kr.
Option 2 - Phase 2 EMCS Upgrade 01 11 00 paragraph 1.5 2,203,077.00 kr. 2,547,216.00 kr.
Option 3 - Phase 2 EMCS Upgrade 01 11 00 paragraph 1.5
Option 4 - Phase 2 EMCS Upgrade 01 11 00 paragraph 1.5
33,922,179.00 kr. 32,467,600.00 kr.
8,281,933.00 kr.
2,044,372.00 kr.
998,789.00 kr.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
42,204,112.00 kr. 40,199,564.00 kr.
PAGES
D. UNIT PRICE D. UNIT
PRICE
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
1 1 Job 2 1 Job 3 1 Job 4 1 Job 5 1 Job 6 1 Job Base Total Options Total
GRAND
TOTAL
3,135,000.00 kr.
1,810,000.00 kr.
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER
W912DS22B0009
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
Install Phase 2 of Energy Management and Control System (EMCS) at Thule Air Base, Greenland
4. OFFERS (Continued)
NO.: 3 NO.: 4 NO.: 5 NO.: 6
Adserballe & Knudsen Greenland A/S
A. OFFEROR A. OFFEROR A. OFFEROR
Adirondack Construction
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A. ITEM
NO.
B. ESTIMATED
QUANTITY
C. UNIT
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT PRICE E. ESTIMATED
AMOUNT
32,898,000.00 kr.
100,000.00 kr.
3,350,000.00 kr.
3,665,000.00 kr.
32,998,000.00 kr.
11,960,000.00 kr.
44,958,000.00 kr.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
Bids Opened by: Adrian Stafford-Browne
Recorded by: Matthew Lubiak
Amendments: 3
| 2022-09-08T09:01:16-0400 | |
| LUBIAK.MATTHEW.E.1031379624 |
File details come from the government source that posted it. Updated .