Hanger 3 - Fiber Optic Installation
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA5000Q240051
- Agency
-
Pacific Air Forces
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Alaska 99506, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Pacific Air Forces is seeking to procure the installation of 24 strands of single-mode fiber optic communication cable from the first floor communication room (Room 102B) in Hangar 3 (Bldg. 10571) to the interior of the MCLIPS shelters on the north side of the hangar at Joint Base Elmendorf-Richardson, Alaska. The contractor will be required to engineer, furnish, install, and test the fiber optic cable, including providing and terminating approximately 300 feet of fiber into 24-port patch panels at both ends. The exterior fiber must be installed in rigid metal conduit approximately 250 feet and firmly affixed to the exterior of Hangar 3 and the MCLIPS shelter. The work must comply with JBER Telecom Standards and Criteria. Quotes are due by 1400 Alaska Standard Time on August 21, 2024, and the government intends to award a single firm-fixed price contract to the responsible offeror whose quote is most advantageous.
This is a 100% Small Business Set-Aside under NAICS code 238210 - Electrical Contractors and Other Wiring Installation Contractors. The place of performance is Anchorage, Alaska 99506. The contractor will have 15 days after award to complete the installation, which must be done within 1 month of contract award.
Notice text
7 versions
Update #7 · Latest ·
** 21 Aug 2024 ** Extended Response time/ offers due
- Extended date offers due to 27 August 2024 "2:00 PM AKDT"
_______________________________________________________________
** 19 Aug 2024 ** Corrected time zone offers due
- Extended date offers due to read "2:00 PM AKDT", 21 Aug 2024 and not "2:00 PM EST"
_______________________________________________________________
** 19 Aug 2024 **
- Updated “Hanger 3 Fiber Optic Installation Combo”
- Addenda to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)
- Addenda to FAR 52.212-1 previously read “2. Price - Submit one (1) copy of price schedule listed in Attachment 1.”
- Addenda to FAR 52.212-1 now reads “2. Price - Submit one (1) copy of price schedule on your company letterhead.”
- Extended date offers due until 2:00 PM AKDT, 21 Aug 2024
_______________________________________________________________
** 16 Aug 2024 ** - Added Attachment X_Questions _ Answers 0003
- Added Attachment VIII_JBER Telecom Criteria Requirements
- Added Attachment IX_OSP JBER Telecom Standards - 12 April 2023
_______________________________________________________________
** 14 Aug 2024 ** - Added Attachment V Questions _ Answers 0002
- Added Attachment VI_AK20240001_BH_07192024
- Added Attachment VII_SCA_WD_2015-5681_07222024
_______________________________________________________________
** 13 Aug 2024 ** - Added Attachment IV Questions _ Answers 0001
- Updated Attachment I - 55WG PWS para 3.0 to read "15 Days After Receipt of Order - JBER"
_______________________________________________________________
Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3.
Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter.
Update #6 ·
** 19 Aug 2024 ** Corrected time zone offers due
- Extended date offers due to read "2:00 PM AKDT", 21 Aug 2024 and not "2:00 PM EST"
_______________________________________________________________
** 19 Aug 2024 **
- Updated “Hanger 3 Fiber Optic Installation Combo”
- Addenda to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)
- Addenda to FAR 52.212-1 previously read “2. Price - Submit one (1) copy of price schedule listed in Attachment 1.”
- Addenda to FAR 52.212-1 now reads “2. Price - Submit one (1) copy of price schedule on your company letterhead.”
- Extended date offers due until 2:00 PM AKDT, 21 Aug 2024
_______________________________________________________________
** 16 Aug 2024 ** - Added Attachment X_Questions _ Answers 0003
- Added Attachment VIII_JBER Telecom Criteria Requirements
- Added Attachment IX_OSP JBER Telecom Standards - 12 April 2023
_______________________________________________________________
** 14 Aug 2024 ** - Added Attachment V Questions _ Answers 0002
- Added Attachment VI_AK20240001_BH_07192024
- Added Attachment VII_SCA_WD_2015-5681_07222024
_______________________________________________________________
** 13 Aug 2024 ** - Added Attachment IV Questions _ Answers 0001
- Updated Attachment I - 55WG PWS para 3.0 to read "15 Days After Receipt of Order - JBER"
_______________________________________________________________
Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3.
Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter.
Update #5 ·
** 19 Aug 2024 **
- Updated “Hanger 3 Fiber Optic Installation Combo”
- Addenda to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (SEP 2023)
- Addenda to FAR 52.212-1 previously read “2. Price - Submit one (1) copy of price schedule
listed in Attachment 1.”
- Addenda to FAR 52.212-1 now reads “2. Price - Submit one (1) copy of price schedule on your
company letterhead.”
- Extended date offers due until 2:00 PM Eastern Standard Time, 21 Aug 2024
_______________________________________________________________
** 16 Aug 2024 ** - Added Attachment X_Questions _ Answers 0003
- Added Attachment VIII_JBER Telecom Criteria Requirements
- Added Attachment IX_OSP JBER Telecom Standards - 12 April 2023
_______________________________________________________________
** 14 Aug 2024 ** - Added Attachment V Questions _ Answers 0002
- Added Attachment VI_AK20240001_BH_07192024
- Added Attachment VII_SCA_WD_2015-5681_07222024
_______________________________________________________________
** 13 Aug 2024 ** - Added Attachment IV Questions _ Answers 0001
- Updated Attachment I - 55WG PWS para 3.0 to read "15 Days After Receipt of Order - JBER"
_______________________________________________________________
Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3.
Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter.
Update #4 ·
** 16 Aug 2024 ** - Added Attachment X_Questions _ Answers 0003
- Added Attachment VIII_JBER Telecom Criteria Requirements
- Added Attachment IX_OSP JBER Telecom Standards - 12 April 2023
_______________________________________________________________
** 14 Aug 2024 ** - Added Attachment V Questions _ Answers 0002
- Added Attachment VI_AK20240001_BH_07192024
- Added Attachment VII_SCA_WD_2015-5681_07222024
_______________________________________________________________
** 13 Aug 2024 ** - Added Attachment IV Questions _ Answers 0001
- Updated Attachment I - 55WG PWS para 3.0 to read "15 Days After Receipt of Order - JBER"
_______________________________________________________________
Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3.
Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter.
Update #3 ·
** 14 Aug 2024 ** - Added Attachment V Questions _ Answers 0002
- Added Attachment VI_AK20240001_BH_07192024
- Added Attachment VII_SCA_WD_2015-5681_07222024
_______________________________________________________________
** 13 Aug 2024 ** - Added Attachment IV Questions _ Answers 0001
- Updated Attachment I - 55WG PWS para 3.0 to read "15 Days After Receipt of Order - JBER"
_______________________________________________________________
Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3.
Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter.
Update #2 ·
** 13 Aug 2024 ** - Added Attachment IV Questions _ Answers 0001
- Updated Attachment I - 55WG PWS para 3.0 to read "15 Days After Receipt of Order - JBER"
_______________________________________________________________________________________________
Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3.
Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter.
Update #1 ·
Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3.
Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter.
Files
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Hanger 3 - Fiber Optic Installation | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 56 CS FOC to Flightline and Wx Equipment, Luke AFB | Air Education and Training Command | Woman-Owned Small Business | |
| Fairbanks Command and Data Acquisition Station (FCDAS) for Operations and Maintenance Services | National Oceanic and Atmospheric Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity