This document is a Performance Work Statement (PWS) for a federal contract opportunity to install fiber optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters at Joint Base Elmendorf-Richardson (JBER). The contractor will engineer, furnish, install, and test 24 strands of single mode fiber optic communication cable from the first floor comm room (Room 102b) to the MCLIPS shelters on the north side of Hangar 3. The contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in the hangar 3 comm room 102b, with the distant end terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All connectors must be LC format. The exterior fiber must be installed within a rigid metal conduit approximately 250 ft and firmly affixed to the exterior of Hangar 3 and the MCLIPS shelter. The work must comply with JBER Telecom Standards and JBER Telecom Criteria. The project must be completed within 1 month of contract award.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07 Aug 2024

PERFORMANCE WORK STATEMENT (PWS)

Project: Hangar 3 Fiber Optic Cable Install

1.0 Purpose: Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters.

2.0 Scope or Mission: This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters.

3.0 Period and Place of Performance: End user requires this work to be completed by 01

Sept 2024

4.0 Background: This is needed to provide connectivity to MCLIPS shelters

5.0 Performance Objectives: Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3. Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter. Affixing to the MCLIP shelter cannot involve any drilling, welding or penetrations to the MCLIP shelter itself. Affixing to the MCLIP shelter can be accomplished with clamps or torsion devices that make no penetrations to the MCLIP shelter outer skin. The MCLIP shelter has built-in lifting points ideal for clamping the conduit for a secure end-point.

6.0 Deliverables / Schedule: Contractor will provide 24 strands of single mode fiber optic communications cable and associated parts/equipment to provide a usable communications link from comm room 102B in Hangar 3 to the exterior of the Hangar to the MCLIPS Shelters. Contractor will provide informal weekly progress reports to the 673 CS project manager. This project must be completed and turned over to the government within 1 months of award date.

Key Deliverables Item No.

Deliverable

Objective

Due

1 Fiber cabling Fully usable communication link Within 1 month of contract award

2 Progress reports Informal email to 673 CS on project status

Weekly until contract is complete

3 Test Results Provide test results that comply with testing parameters outlined in OSP JBER standards

Within 10 days of completion of installation

7.0 Operating Constraints: All work on this effort will happen during normal duty hours of 0730 to 1630 on JBER. Any work outside these hours must be approved by the 673 CS project manager. Contractor must ensure they comply with confined space requirements when/if working in manholes and hand holes. The contractor will ensure safety in accordance with applicable guidance including OSHA, AKOSH and Air Force standards.

Attachment:

JBER Telecom Criteria Requiremen

OSP JBER Telecom Standards - 12 April 2

File details come from the government source that posted it. Updated .