This document contains questions and answers related to a federal contract opportunity for the installation of fiber optic cabling from the communication room in Hangar 3 to MCLIPS shelters on the north side of the hangar. The key details are:

The project does not require trenching or manholes, but instead will use a wall penetration and conduit mounted alongside the building with a 10-15 ft aerial run to the MCLIPS shelters. The contract is subject to Davis-Bacon and Service Contract Act wage requirements. The fiber optic installation must comply with industry standards outlined in the JBER Telecom Standards and JBER Telecom Criteria. Approximately 300 ft of fiber optic cable will be installed and terminated in a 24-port patch panel in the hangar communication room and the MCLIPS shelter. The exterior fiber must be installed in rigid metal conduit and affixed to the hangar and shelter exteriors.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. Does the project require trenching and manholes for the conduit between comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3?

Answer: Negative…no trenching or manholes required. From the comm room out a wall penetration, conduit mounted alongside the bldg. with a 10-15 ft aerial run from the bldg. to the MCLIPs Shelters.

Q2: Does this project have Davis Bacon wages?

Answer: Requirement is advertised as a service by the United States Government, applicable statutes apply by profession. Davis Bacon and SCA is attached.