This document is a set of questions and answers related to a federal contract opportunity for the installation of fiber optic cabling from Hangar 3 to MCLIPS shelters at Joint Base Elmendorf-Richardson (JBER).
The key details are:
The contractor is requested to provide photos of the existing communication closet in Hangar 3 and the penetration location at the MCLIPS shelter to assist in the planning and installation. The contractor is also asked to confirm if the fiber strands need to be certified after termination, and to provide the type and length of any required patch cables. The fiber optic cabling installation must comply with the JBER Telecom Standards and Criteria, and the exterior fiber must be installed in rigid metal conduit. This 24-strand single mode fiber optic installation is part of Solicitation FA5000Q240051 for the Hangar 3 Fiber Optic Installation project, which is being managed by the Department of the Air Force Pacific Air Forces.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q1. ** **Communication Closet in Hangar 3:** If possible, could you please provide photos of the communication closet in Hangar 3? These images will help us better understand the existing setup and plan the installation accordingly.
Answer: See Attachment VII_MCLIPS Fiber Run Photos
Q2. **Penetration Location at the Shelter:** We would also appreciate detailed information and/or photos of the penetration location at the MCLIPS shelter. This will assist us in assessing the best approach for the conduit and fiber installation.
Answer: See Attachment VII MCLIPs photos attached in the PowerPoint above.
Q3. **Fiber Strands Certification:** Could you confirm if you require the fiber strands to be certified after termination? If so, please provide any specific testing or certification standards that we should follow.
Answer: See attachment IX_OSP JBER Telecom Standards 12 April 2023, para 4.2.2.
Q4. **Patch Cables:** Lastly, please advise if any patch cables are necessary for this installation. If required, could you specify the type and length needed?
Answer: The contractor should do an on-site survey to determine this. If patch cable are required the need to be LC Single mode cables.