This document contains the Questions & Answers related to a federal contract opportunity for the installation of fiber optic cabling from Hangar 3 (Building 10571) Communication Room to MCLIPS shelters at Joint Base Elmendorf-Richardson (JBER).
The key details are:
- The end user has requested the work to be completed by September 1, 2024, but this date is not mandatory. The awardee will have 15 days after award to complete the installation.
- The scope of work includes engineering, furnishing, installing, and testing 24 strands of single-mode fiber optic communication cable from the first floor comm room (Room 102B) to the interior of the MCLIPS shelters, approximately 300 ft. All connectors must be in LC format. The exterior fiber must be installed in rigid metal conduit, approximately 250 ft, and affixed to the exterior of Hangar 3 and the MCLIPS shelter.
- The contracting agency is the Department of the Air Force Pacific Air Forces.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question: “End user requires this work to be completed by 01 Sept 2024. Has this date changed? “
Answer: The end user has requested this date, we wish to be as close to that date as possible (due to impending inclement weather), a 1 Sept completion date is not a mandatory element.
- Awardee will have 15 days ARO to complete installation