56 CS FOC to Flightline and Wx Equipment, Luke AFB

Open Solicitation Posted

Solicitation number
F3YCFA6173AC01
Agency
Responses due
Set-aside
Woman-Owned Small Business

Opportunity facts

Place of performance
Luke Air Force Base, Arizona 85309, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force, Air Education and Training Command, seeks Engineer, Furnish, Install, and Test services for new 12-strand single-mode fiber optic cable and related infrastructure at Luke Air Force Base, Arizona, with proposals due November 30, 2026 at 1300 Arizona time. The procurement is a Women-Owned Small Business set-aside under NAICS 335921, and eligibility is restricted to SBA-certified women-owned small businesses. Amendment FA488727Q00030002 replaced FAR 52.219-6 with FAR 52.219-30.

The 56th Contracting Squadron issues Request for Quote FA488727Q0003 on behalf of the 56th Communications Squadron, which administers the contract. The RFQ is a firm-fixed-price single line item (0001) for commercial products and services, with delivery required by July 1, 2027 to Building 123. Inspection and acceptance occur at the contractor's facility and at Tinker Air Force Base. Contracting Officer Rachel Tilley is the point of contact.

Work is performed at Luke AFB, Arizona, during normal duty hours of 7:30 a.m. to 4:30 p.m., Monday through Friday. Airfield work may occur outside flying hours of 0630 to 2230 Monday through Thursday and 0630 to 1830 Friday, requiring a temporary construction waiver and FAA Form 7460-1 submitted at least 45 days before construction start. Base access requires a REAL ID or government-issued passport. The SOW caps performance at 180 calendar days, but the Government sets the period of performance, award date, and notice to proceed after evaluation and may adjust performance based on material lead times.

Technical requirements include routing cable from Radar Approach Control (B979) to the Air Traffic Control Tower (B998) and other facilities, with 13 fiber optic distribution panels across the sites. Installation uses existing manhole and handhole ducts, with some direct-buried routes. Materials must be new, rust-proof, and corrosion-resistant. Testing covers optical attenuation and distance at 1310 nm and 1550 nm. The contractor obtains Blue Stake locates and AF Form 103 approval, with an estimated four-week lead time. Asbestos-containing floor tile exists at Building 979. Quantities are approximations, and contractors confirm distances during site survey. The Buy American Act applies.

Evaluation considers technical capability, including management and installation personnel qualifications under SOW Section 2.1.8.4, past performance based on the prime contractor's SPRS record (contractors without an SPRS score receive a neutral rating), and price. First-tier subcontractor personnel may satisfy staffing requirements. Proposals are limited to 25 pages in separate technical and pricing volumes, and the supply portion is subject to a 50-percent subcontracting limitation.

Notice text

6 versions

Update #6 · Latest ·

FINAL EXTENSION: Proposals are due no later than 30 November at 1300. NO ADDITIONAL EXTENSIONS WILL BE PROVIDED. Responses to Site Visit Q&A will be posted by 13 November 2026 at 1300 Arizona Time.

The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend.

Only SBA Certified Women Owned Small-Businesses are eligible for this requirement.

**THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED**

Attendance will be limited to 2 representatives for each contractor.

To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time.

Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN

To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport.

When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements.

**QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time**

***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026***

This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.

See attached Solicitation and supporting documents for additional information. 

Update #5 ·

An interim extension has been granted while the Government determines the appropriate time required after the site visit for proposals to be submitted. Finalized date will be added NO LATER THAN 11 November 2026.

The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend.

Only SBA Certified Women Owned Small-Businesses are eligible for this requirement.

**THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED**

Attendance will be limited to 2 representatives for each contractor.

To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time.

Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN

To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport.

When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements.

**QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time**

***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026***

This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.

See attached Solicitation and supporting documents for additional information. 

Update #4 ·

The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend.

Only SBA Certified Women Owned Small-Businesses are eligible for this requirement.

**THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED**

Attendance will be limited to 2 representatives for each contractor.

To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time.

Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN

To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport.

When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements.

**QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time**

***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026***

This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.

See attached Solicitation and supporting documents for additional information. 

Update #3 ·

**QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time**

***The Government is working to determine a date/time between 26 October 2026 and 6 November 2026 to schedule a site visit. There will only be one visit scheduled and no additional dates will be added.***

***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026***

 

This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.

See attached Solicitation and supporting documents for additional information. 

Update #2 ·

**QUESTIONS ARE DUE NO LATER THAN COB 19 OCTOBER**

Depending on interest a site visit can be scheduled and proposal due date MAY shift to accommodate.

This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.

See attached Solicitation and supporting documents for additional information. 

Update #1 ·

This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment.

See attached Solicitation and supporting documents for additional information. 

Files

Show all 11

Similar open opportunities

Opportunity Agency Set-aside Responses due
Fiber Optic Cables for Sheppard AFB Sheppard AFB, Texas 76311, United States · NAICS 335921 Air Education and Training Command Total Small Business
Womble Work Center Fiber Optic Installation Mount Ida, Arkansas 71957, United States · NAICS 238210 Region 8 - Southern Region Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors