Gila National Forest Vault Toilet Decommissioning
Closed Solicitation Posted
- Solicitation number
- 127EAX27Q0007
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- Place of performance
- Silver City, New Mexico, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service seeks commercial construction services to demolish five vault toilets, decommission and relocate three CXT vault toilets, and optionally install one new CXT toilet on the Gila National Forest, with sealed quotes due November 17, 2026 at 12:00 PM Mountain Time. The procurement is a Total Small Business set-aside under RFQ 127EAX27Q0007, issued by CSA Southwest 7 in Albuquerque, New Mexico, and questions were due October 29, 2026.
Amendment 001, posted November 5, 2026, adds Davis-Bacon wage determinations for Grant (NM20260019), Catron (NM20260010), and Sierra (NM20260012) counties and attaches RFI questions and responses. All other terms remain unchanged.
Place of performance covers sites in Grant, Catron, and Sierra counties, New Mexico, with the Contracting Officer's Representative based in Silver City, NM 88061. Option delivery, without installation, goes to Fort Bayard Administrative Site. The RFI states that most sites are accessed by unpaved roads.
The contractor furnishes all materials, labor, equipment, supervision, tools, and utilities. Required work includes pumping vault contents through licensed septage haulers, transporting waste to permitted disposal facilities, obliterating vaults, backfilling and grading, and constructing new concrete aprons with "VanHorn roll" edges. The contractor also obtains permits and bears responsibility for correcting any damage to government property. A 20% bid bond must accompany quotes, and performance and payment bonds are required at award.
Base scope demolishes five toilets and decommissions and relocates three CXT toilets. Option items cover demolition of one Romtec toilet with installation of a new CXT Gunnison toilet at Head of Ditch Campground North, and delivery of one CXT toilet to Fort Bayard without installation. Pricing is lump sum per item, with separate totals for base, optional, and combined items, and must include applicable taxes. The contractor must commence work within 10 calendar days of notice to proceed and complete all work within 90 calendar days. The RFI anticipates a December 2026 start, with most work intended for completion before Spring Season 2027.
Award goes to the highest technically rated offeror at fair and reasonable firm-fixed price, and not necessarily to the lowest bidder. Technical evaluation covers schedule capability, company experience, personnel qualifications, safety plan, demolition and relocation methods, and equipment. Past performance must rate acceptable or neutral. The solicitation does not state relative weights for these factors.
NAICS is 238910, Site Preparation Contractors, and PSC is Z2PZ.
Notice text
2 versions
Update #2 · Latest ·
**********UPDATE 11-5-2026**********
AMENDMENT 001 posted today with the following five (5) updated and/or new attachments:
1. 127EAX27Q0007_0001
2. RFI Questions and Responses_127EAX27Q0007_Amendment 001
3. Attachment F1_Wage Determination_Grant County_NM20260019 5.18.2026
4. Attachment F2_Wage Determination_Catron County_NM20260010_5.18.2026
5. Attachment F3_Wage Determination_Sierra County_NM20260012_5.18.2026
**********End of Amendment 001**********
Commercial Construction Requirement
Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform
operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate
three other CXT® style vault toilets. There is one option item that includes the demolition of one
single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison”
single user vault toilet. A second option is to procure a toilet and have it delivered but with no
installation.
Update #1 ·
Commercial Construction Requirement
Furnish all materials, labor, equipment, supervision, tools, and utilities required to perform
operations necessary to (A) demolish five existing vault toilets and to (B) decommission and then relocate
three other CXT® style vault toilets. There is one option item that includes the demolition of one
single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison”
single user vault toilet. A second option is to procure a toilet and have it delivered but with no
installation.
Files
Show all 13
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| ACW (Ava-Cassville-Willow Springs Ranger District, Mark Twain National Forest) Toilet Pumping | Forest Service | Total Small Business | |
| KFO vault toilet pumping | — | Total Small Business | |
| Barstow/dumont janitorial services | — | Total Small Business | |
| Portable Toilet Services - ZION National Park | — | Total Small Business | |
| Forest Wide Decommissioning Project | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity