Attachment A_SOW_Gila NF Toilet Decommissioning.pdf

PDF 514 KB Posted

Attached to
Gila National Forest Vault Toilet Decommissioning
Solicitation number
127EAX27Q0007
Issued by

About this file

This is a Request for Quote (RFQ) for toilet decommissioning and relocation services at Gila National Forest in New Mexico, issued under RFQ# 127EAX27Q0007.

The base scope requires contractors to demolish three existing Romtec® vault toilets and one fiberglass/wood structure toilet, then decommission and relocate three CXT® brand precast concrete vault toilets to new locations. Specific work includes waste pump-out using licensed septage haulers, above-ground structure demolition, vault obliteration (cutting top portions minimum 20-24 inches below grade and piercing bottoms in minimum five locations), debris disposal within vaults (limited to 12-inch maximum dimensions), backfilling with native material compaction, and final grading to match surrounding contours with 2-3 percent slope for drainage. The six toilets targeted for demolition are located at Bighorn Campground, Gomez Peak, Little Walnut Day Use Area, Head of Ditch Campground North, Kingston Campground, and Emory Pass Heliport. The three toilets for relocation are at San Fran Hot Springs (13 miles to Bighorn Campground), Mogollon (53 miles to Gomez Peak), and Lower Gallinas Campground (55 miles to Little Walnut Day Use Area). Relocation work requires excavation, removal using manufacturer-approved lift points and crane operations, DOT-compliant transportation, installation per manufacturer specifications, compacted backfill in 8-12 inch lifts, butyl seal tape application, and proper drainage grading. Three concrete aprons (4 inches thick, 14'7.5" X 5'4") with "Vanhorn Roll" edges must be constructed at new CXT installation locations using 3,500 psi Portland cement concrete with fiber reinforcement and Grade 60 steel rebar anchored minimum 12 inches into toilet structures.

An option item requires demolition of one Romtec® toilet at Head of Ditch Campground and procurement/installation of a new CXT® Gunnison model single-user vault toilet (6'6" X 14'8", ADA-compliant, 1,000-gallon vault) in Buckskin color with barnwood wall texture and cedar shake roof. Contract period is 90 days from Notice to Proceed. Deliverables include pre- and post-work electronic photographs, waste disposal records, and concrete batch tickets. The Contracting Officer's Representative is Logan Ross, Forest Engineer, Gila National Forest, Silver City, New Mexico. The government will provide lock combinations and optional CXT® brand steel lifting plates for contractor use. Contractors are responsible for all utilities, permits, escort vehicles for oversize loads, and correcting any damage to government property at no cost to the government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ# 127EAX27Q0007

Toilet Decommissioning

2026 Vault Toilet Decommission Gila National Forest

1.0 PROJECT SCOPE OF WORK

Furnish all materials, labor, equipment, supervision, and tools required to perform operations necessary to demolish three existing vault toilets and to decommission and then relocate three other CXT® style vault toilets.

2.0 BACKGROUND

There are six single-hole vault style toilets on the forest that have been identified (Table 1) as requiring demolition. These toilets were installed in mid-late 1990’s, some even earlier, and are reaching the end of their service life. They require sufficient amounts of time and money to maintain and keep them in satisfactory safe working order and environmental compliance.

Some of these toilets were manufactured by Romtec® and consist of a single user, single vault, waterless design with wood, fiberglass, or composite material construction on top of a concrete slab with a 750-gallon polyethylene vault. The Emory Pass Heliport toilet consists of a small fiberglass and wood structure placed on top of a small concrete pad and pit. See photos (Attachment B).

The above ground portion of these toilets are to be demolished and disposed of inside the pumped vault. The concrete apron (if applicable) and upper portion of vaults should be obliterated, disposed of in the empty vault, backfilled, and the area graded to match surrounding area.

There are three precast concrete vault toilets (CXT®) that are to be decommissioned and relocated to a new location (Table 2). These toilets are in a location prone to seasonal flooding events or are not being utilized in their current location. These toilets are CXT® brand “Gunnison” model 6’6” X 14’ 8”, ADA compliant, single user, waterless vault toilets.

These toilets will need to be pumped, removed from their current location, transported to their new location, and installed per the manufacturer’s specifications. The void left in the ground from removal will need to be backfilled and graded to match the existing area.

There is one option item that includes the demolition of one single user Romtec® vault toilet and the procurement and installation of a new CXT® “Gunnison” single user vault toilet (Table 3).

There are no utilities available at any of the project sites, contractor is responsible for providing any and all utilities required for successful completion of the work described.

TOILET LOCATIONS

Units for Demolition (Table 1)

Toilet Description Type Latitude Longitude

Bighorn Campground Romtec® 33.324127 -108.882843

Gomez Peak Toilet 1 (west)

Romtec® 32.849384 -108.278008

Little Walnut Day Use Toilet

Romtec® 32.853542 -108.274841

Head of Ditch CG North Toilet

Romtec® 33.818513 -108.990519

Kingston Campground Toilet

Romtec® 32.918340 -107.700793

Emory Pass Heliport Toilet

Fiberglass/concrete base

32.913377 -107.765948

Units for Decommission/Relocation (Table 2)

Toilet ID/Site decommission

Latitude Longitude Relocate to

Site ID Installation

Latitude Longitude Approx Miles

Building Weight (approx.)

Vault Weight (approx.)

San Fran Hot Springs Toilet Left Hand CXT

33.228216 -108.867228

Bighorn Campground

33.324127 -108.882843 13 mi 26,000 lb. 17,000 lb.

Mogollon Toilet Right Hand CXT

33.040146 -108.533035

Gomez Peak 32.848391

-108.276890

53 mi 26,000 lb. 17,000 lb.

Lower Gallinas CG Toilet Right Hand

CXT

32.891496 -107.842158

Little Walnut Day Use Area

32.853542 -108.274841 55 mi 26,000 lb. 17,000 lb.

Unit for Demolition (Table3)

Toilet Description Type Latitude Longitude Head of the Ditch Campground Romtec® 33.818513 -108.990519

*Newly purchased CXT® “Gunnison” single user vault toilet (brand name or approved equal product) to be installed at the same “Head of the Ditch” Campground, though at a different location

3.0 TECHNICAL REQUIREMENTS

ROMTEC ® TOILET DEMOLITION

PART 3 – EXECUTION

3.1 PREPARATION

A. Secure the work area and restrict public access for the duration of demolition activities.

Provide, erect, and maintain orange safety fencing and other security measures, including traffic controls, as necessary to minimize potential safety hazards created by work activities.

The Contractor shall be responsible for always maintaining safety measures during the contract.

B. Document existing site and structural conditions with photographs to establish pre‑work conditions.

3.2 WASTE PUMP-OUT AND VAULT CLEANING

A. Pump the entire contents of the vault using a licensed and permitted septage hauler. Spray down vault interior to remove any remaining solids, slurry, washdown residue, or debris from vault interior and pump out prior to backfilling.

B. Transport all pumped waste to an approved and permitted disposal or treatment facility in accordance with local regulations.

3.3 STRUCTURE REMOVAL

A. Demolish/obliterate all toilet superstructure components interior and exterior.

B. Disconnect, cut, and fully remove any toilet vent systems, including any above‑grade and below‑grade components.

C. Cut and remove the entire top portion containing riser stack and cleanout of the Polyethylene vault at a minimum of 20” below grade. Pierce the bottom of the vault in a minimum of five locations to prevent the vault from potentially holding water.

D. Toilet super structure components can be disposed of inside the now empty vault. The Contractor shall use appropriate means to consolidate the toilet superstructure components to prohibit any large empty voids within the vault. i.e. crushing debris with equipment bucket.

E. Concrete rubble can also be disposed of in the vault providing it is no larger than 12” long in any dimension. Any concrete rubble that does not fit or longer than 12” in any dimension must be disposed of off forest service lands.

3.4 BACKFILLING AND COMPACTION

A. Backfill the remaining vault cavity with surrounding native material from an area identified by the COR.**note**Granular backfill material will need to be hauled in for Gomez Peak Toilet and Little Walnut Day Use Toilet.

B. Maintain controlled fill placement of granular material and concrete rubble to eliminate large voids in the final product. No concrete rubble or toilet superstructure debris may be placed in the upper 24” of vault backfill.

C. “Wheel roll” the backfilled portion of the vault to compact structure debris and fill material.

D. Mound off top of fill 4 inches above existing grade to allow for future settling.

E. Any excavations left open overnight must be fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation. The bottom of the fence will generally follow the contour of the ground. Maximum spacing of the steel posts is 10’ with a 36” fence height (min).

3.5 FINAL GRADING AND STABILIZATION

A. Grade the disturbed area to match adjacent natural contours in the immediate vicinity.

B. Provide a minimum slope of 2 to 3 percent away from the center of the disturbed area to promote positive drainage.

3.6 FINAL INSPECTION

A. Submit waste disposal records and photographic documentation of the pre and post demolition work electronically to the COR.

B. Any structural or cosmetic damage to existing infrastructure or government property shall be corrected by the contractor at no expense to the government.

C. Completed work must be approved by COR before payment.

FIBERGLASS/WOOD STRUCTURE TOILET DEMOLITION

PART 3 – EXECUTION

3.1 PREPARATION

A. Secure the work area and restrict public access for the duration of demolition activities.

Provide, erect, and maintain orange safety fencing and other security measures, including traffic controls, as necessary to minimize potential safety hazards created by work activities.

The Contractor shall be responsible for always maintaining safety measures during the contract.

B. Document existing site and structural conditions with photographs to establish pre‑work conditions.

3.2 WASTE PUMP-OUT AND VAULT CLEANING

A. Pump the entire contents of the vault using a licensed and permitted septage hauler. Spray down vault interior to remove any remaining solids, slurry, washdown residue, or debris from vault interior and pump out prior to backfilling.

B. Transport all pumped waste to an approved and permitted disposal or treatment facility in accordance with local regulations.

3.3 STRUCTURE REMOVAL

A. Demolish/obliterate all toilet superstructure components interior and exterior.

B. Disconnect, cut, and fully remove any toilet vent systems, including any above‑grade and below‑grade components.

C. Cut and remove any above ground components and demolish top portion of vault a minimum of 24” below existing grade. Pierce the bottom of the vault in a minimum of five locations to prevent the vault from potentially holding water.

D. Toilet super structure components can be disposed of inside the now empty vault. The Contractor shall use appropriate means to consolidate the toilet superstructure components to prohibit any large empty voids within the vault. i.e. crushing debris with equipment bucket.

E. Concrete rubble can also be disposed of in the vault providing it is no larger than 12” long in any dimension. Any concrete rubble that does not fit or longer than 12” in any dimension must be disposed of off forest service lands.

3.4 BACKFILLING AND COMPACTION

A. Backfill the remaining vault cavity with surrounding native material from an area identified by the COR.

B. Maintain controlled fill placement of granular material and concrete rubble to eliminate large voids in the final product. No concrete rubble or toilet superstructure debris may be placed in the upper 24” of vault backfill.

C. “Wheel roll” the backfilled portion of the vault to compact structure debris and fill material.

D. Mound off top of fill 4 inches above existing grade to allow for future settling.

E. Any excavations left open overnight must be fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation. The bottom of the fence will generally follow the contour of the ground. Maximum spacing of the steel posts is 10’ with a 36” fence height (min).

3.5 FINAL GRADING AND STABILIZATION

A. Grade the disturbed area to match adjacent natural contours in the immediate vicinity.

B. Provide a minimum slope of 2 to 3 percent away from the center of the disturbed area to promote positive drainage.

3.6 FINAL INSPECTION

A. Submit waste disposal records and photographic documentation of the pre and post demolition work electronically to the COR.

B. Any structural or cosmetic damage to existing infrastructure or government property shall be corrected by the contractor at no expense to the government C. Completed work must be approved by COR before payment.

CXT® VAULT TOILET DECOMMISSION

PART 3 – EXECUTION

3.1 PREPERATION

A. Secure the work area and restrict public access for the duration of demolition activities.

Provide, erect, and maintain orange safety fencing and other security measures, including traffic controls, as necessary to minimize potential safety hazards created by work activities.

The Contractor shall be responsible for always maintaining safety measures during the contract.

B. Document existing site and structural conditions with photographs to establish pre‑work conditions.

3.2 WASTE PUMP-OUT AND VAULT CLEANING

A. Pump the entire contents of the vault using a licensed and permitted septage hauler. Spray down vault interior to remove any remaining solids, slurry, washdown residue, or debris from vault interior and pump out prior to backfilling.

B. Transport all pumped waste to an approved and permitted disposal or treatment facility in accordance with local regulations.

3.3 EXCAVATION

A. Excavate around the existing vault structure as required to allow safe access and facilitate lifting and removal of the vault and building superstructure.

B. Ensure excavation dimensions are sufficient to enable rigging attachments and maintain equipment clearance.

C. Any excavations left open overnight must be fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation. The bottom of the fence will generally follow the contour of the ground. Maximum spacing of the steel posts is 10’ with a 36” fence height (min).

3.4 VAULT AND SUPERSTRUCTURE REMOVAL

A. Use only lift plates and lift points approved by the manufacturer for lifting vault and superstructure.

B. Remove the CXT® vault and superstructure using a crane rated for the load and reach involved and a method in accordance with the manufacturer’s instructions. The forest has a set of CXT® vault lifting kits that the contractor may use if they desire.

C. Secure the vault and superstructure components to transport vehicles in accordance with all Department of Transportation (DOT) regulations, including tie‑down requirements and oversize/overweight provisions where applicable.

D. Any required permits or escort vehicles for transportation are the responsibility of the contractor.

3.5 BACKFILLING AND COMPACTION

A. Backfill the remaining vault cavity with surrounding native material from an area identified by the COR.

B. Place backfill in loose lifts not exceeding 12 inches in thickness. Compact each lift using a mechanical whacker‑type compactor or approved equivalent until visible displacement of the material ceases, indicating adequate compaction.

C. Concrete rubble from sidewalks (if any) can be placed in the now empty vault area in addition to the native backfill material providing it is no larger than 12” long in any dimension.

Any concrete rubble that does not fit or longer than 12” in any dimension must be disposed of off forest service lands.

D. Maintain controlled fill placement of granular material and concrete rubble to eliminate voids, differential settlement, or instability in the final product. No concrete rubble may be placed in the upper 24” of vault backfill.

E. With native material, mound top of fill area approximately 4 inches above existing grade to allow for natural settlement over time.

F. Any excavations left open overnight must be fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation. The bottom of the fence will generally follow the contour of the ground. Maximum spacing of the steel posts is 10’ with a 36” fence height (min).

3.6 FINAL GRADING AND STABILIZATION

A. Regrade all areas of excavation and ground disturbance to approximate pre‑existing contours and match existing conditions in the immediate vicinity.

B. Provide a minimum 2 percent slope away from the center of the disturbed area to ensure proper drainage and prevent ponding.

3.7 FINAL INSPECTION

A. Submit waste disposal records and photographic documentation of the pre and post demolition work electronically to the COR.

B. Any structural or cosmetic damage to existing infrastructure or government property shall be corrected by the contractor at no expense to the government.

C. Completed work must be approved by COR before payment.

CXT® VAULT TOILET INSTALLATION

3.1 PLACEMENT REQUIREMENTS

A. The finished floor elevation of the precast building shall be set 4 to 6 inches above the natural grade measured at the front entrance and established by COR.

B. The floor slab and the top of the precast vault shall be located at the highest point of the selected site. COR will identify location and orientation of the vault toilet unit.

C. Both the building floor and vault top shall remain above surrounding ground level to prevent surface water intrusion.

D. Construct an access pathway with a positive slope up to the building entryway to ensure smooth transition and drainage away from structure.

E. The rear of the building shall be slightly higher than the front to allow for unobstructed drainage from the toilet room.

3.2 EXCAVATION, PLACEMENT, BACKFILL, AND COMPACTION

3.21. Excavation

A. Excavate the vault pit area large enough to allow safe, workable access for placement and alignment of the vault structure and the building floor.

B. Avoid excessive oversizing of vault pit to avoid excessive backfill after placement; excavation shall be only as large as necessary to perform installation and allow proper backfill.

C. Compact the natural subgrade at the bottom of the excavation using a mechanical whacker‑type compactor until visual displacement of subgrade has ceased. Apply sufficient moisture to achieve compaction described above.

D. Any excavations left open overnight must be fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation. The bottom of the fence will generally follow the contour of the ground. Maximum spacing of the steel posts is 10’ with a 36” fence height (min).

3.22 Bedding and Leveling

A. Install three inches minimum of aggregate base course material for building support.

B. Compact the aggregate base course material with a mechanical whacker‑type tamper until visual displacement of aggregate base course has ceased. Apply sufficient moisture to achieve compaction described above.

C. Install a sand leveling course over the aggregate base course to eliminate high/low spots and provide uniform support across the entire vault base.

3.23 Vault Placement

A. Place the precast vault onto the prepared sand leveling course.

B. The containment‑area end of the vault shall be installed slightly higher than the opposite end, at a slope of approximately ¼ inch per foot of run, to allow the building superstructure to sit higher and allow water to freely drain out from room during cleaning.

C. Confirm the vault is level from side‑to‑side before backfilling.

3.24 Backfill and Compaction

A. Backfill around the vault using the previously excavated native material.

B. Do not place stones larger than 6 inches in maximum dimension within 6 inches of vault exterior walls.

C. Fill the void with the previously excavated material placed in 8-inch loose lifts and compact using a mechanical whacker‑type compactor until visual displacement of the material has ceased. Apply sufficient moisture to achieve compaction described above.

3.3 SEALING SURFACE PREPARATION AND SUPERSTRUCTURE ALIGNMENT

3.31 Sealing Surface Preparation

A. After vault placement and backfilling, clean the top surface of the vault to remove any debris, loose material, and contaminants where the vault and superstructure meet.

B. Install new butyl seal tape continuously around the entire vault top surface to prepare for superstructure building placement per manufacturer’s instructions.

3.32 Building alignment and placement

A. Align the rear corners of the vault (containment portion) and floor (near clean-out and vent stack) while placing building. The screen section and sidewalks will overhang the vault by several inches.

B. The seal of the containment portion of the vault (between vault and building superstructure) must be checked visually. There shall be no light leaking through vault/building superstructure joints.

C. Seals between the toilet riser/vent stack and the floor/roof panel shall remain intact. Any damage to the seal area must be repaired using caulk/sealant approved by the CXT manufacturer.

D. Clean water shall be placed in the vault containment area in sufficient amount to cover the entire vault floor after installation. This is to assist in keeping waste material fluid, making it easier to pump out when needed.

3.4 FINAL INSPECTION

A. Provide electronic photographic documentation of the finished site.

B. Any structural or cosmetic damage to toilets or adjacent government property shall be corrected by the contractor at no expense to the government.

C. Completed work must be approved by COR before payment.

NEW CXT® VAULT TOILET INSTALLATION HEAD OF DITCH CAMPGROUND

OPTION ITEM #4

PART 2 – PROCUREMENT

2.1 PRECAST CONTRETE VAULT TOILET REQUREMENTS

A. New vault toilet shall be CXT® Gunnison style 6’-6” X 14’-8” ADA Compliant right hand screen single vault toilet (brand name or approved equal product). Color shall be single color in “Buckskin”, the walls shall have “barnwood” wall texture with standard cedar shake roof texture. Contractor to provide product submittal for acceptance prior to procurement and installation.

B. New toilet shall have the following minimum specifications:

• Single Vault, unisex

• Snow load: 350 LB/SF

• Floor load: 400 LB/SF

• Wind load: 150 MPH, exposure C

• Seismic load: Category E

• 1000-gallon concrete waste vault with Polyethylene Vault Liner made of a Roto molded 8460 polyethylene with minimum thickness of .100

• Vault building shall have a minimum 4” wall, 4½” roof, and 5” floor thickness

• Vault buildings have a one-piece floor unit to prevent panels that migrate in different directions during periods of freeze/thaw stress

• Vault buildings have a one-piece full length and width vault unit to support the building, screen area, and snow loads evenly

• Doors are flush panel type 1¾” thick, minimum 16-gauge galvanized steel, top painted with DTM ALKYD

• Door frames are knockdown or welded type, single rabbet, minimum 16-gauge prime coated steel top painted with DTM ALKYD, width to suit wall thickness

• Three (3) door hinges per door with dull chrome plating 4½” x 4½”, adjustable tension, and automatic closing for each door

• Door stop meeting ANSI 156.16

• Coat hook 16-gauge (1.5mm), type 304 stainless steel

• Upper hook extends at least 2½” from the wall, Lower hook will extend at least 1¼” from the wall.

• ADA compliant grab bars 18-gauge, type 304 stainless steel with 1½” clearance

• ANSI/BHMA certified Grade 1 mortise lockset for exterior door

• One piece HDPE polyethylene, ADA compliant, toilet riser

• Toilet paper dispenser, constructed of ¼” thick, type 304 stainless steel holding three (3) standard rolls of toilet paper

• 12” diameter vent stack and a minimum 3’ higher than the roof peak

• Lockable, hinged vault cleanout cover 24” in diameter (min)

• Windows and cleanout cover frames are constructed from steel

• Window glazing is ³̷₁₆” thick translucent pebble finished mar-resistant Lexan

3.1 PLACEMENT REQUIREMENTS

A. The finished floor elevation of the precast building shall be set 4 to 6 inches above the natural grade measured at the front entrance and established by COR.

B. The floor slab and the top of the precast vault shall be located at the highest point of the selected site. COR will identify location and orientation of the vault toilet unit.

C. Both the building floor and vault top shall remain above surrounding ground level to prevent surface water intrusion.

D. Construct an access pathway with a positive slope up to the building entryway to ensure smooth transition and drainage away from structure with native material.

E. The rear of the building should be slightly higher than the front to allow for unobstructed drainage from the toilet room.

3.2 EXCAVATION, PLACEMENT, BACKFILL, AND COMPACTION

3.21. Excavation

A. Excavate the vault pit area large enough to allow safe, workable access for placement and alignment of the vault structure and the building floor.

B. Avoid excessive oversizing of vault pit to avoid excessive backfill after placement; excavation shall be only as large as necessary to perform installation and allow proper backfill.

C. Compact the natural subgrade at the bottom of the excavation using a mechanical whacker‑type compactor until visual displacement of subgrade has ceased. Apply sufficient moisture to achieve compaction described above.

D. Any excavations left open overnight must be fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation. The bottom of the fence will generally follow the contour of the ground. Maximum spacing of the steel posts is 10’ with a 36” fence height (min).

3.22 Bedding and Leveling

A. Install three inches minimum of aggregate base course material for building support.

B. Compact the aggregate base course material with a mechanical whacker‑type tamper until visual displacement of aggregate base course has ceased. Apply sufficient moisture to achieve compaction described above.

C. Install a sand leveling course over the aggregate base course to eliminate high/low spots and provide uniform support across the entire vault base.

3.23 Vault Placement

A. Place the precast vault onto the prepared sand leveling course.

B. The containment‑area end of the vault shall be installed slightly higher than the opposite end, at a slope of approximately ¼ inch per foot of run, to allow the building to sit higher and allow water to freely drain out from rooms.

C. Confirm the vault is level from side‑to‑side before backfilling.

3.24 Backfill and Compaction

A. Backfill around the vault using excavated native material unless otherwise approved.

B. Do not place stones larger than 6 inches in maximum dimension within 6 inches of vault exterior walls.

C. Fill the void with native excavated material placed in 8-inch loose lifts and compact using a mechanical whacker‑type compactor until visual displacement of the material has ceased.

Apply sufficient moisture to achieve compaction described above.

3.3 SEALING SURFACE PREPARATION AND SUPERSTRUCTURE ALIGNMENT

3.31 Sealing Surface Preparation

A. After vault placement and backfilling, clean the top surface of the vault to remove any debris, loose material, and contaminants where the vault and superstructure meet.

B. Install new butyl seal tape continuously around the entire vault top surface to prepare for superstructure building placement per manufacturer’s instructions.

3.32 Building alignment and placement

A. Align the rear corners of the vault (containment portion) and floor (near clean-out and vent stack) while placing building. The screen section and sidewalks will overhang the vault by several inches.

B. The seal of the containment portion of the vault (between vault and building superstructure) must be checked visually. There shall be no light leaking through vault/building superstructure joints.

C. Seals between the toilet riser/vent stack and the floor/roof panel shall remain intact. Any damage to the seal area must be repaired using caulk/sealant approved by the CXT manufacturer.

D. Clean water shall be placed in the vault containment area in sufficient amount to cover the entire vault floor after installation. This is to assist in keeping waste material fluid, making it easier to pump out when needed.

3.4 FINAL INSPECTION

A. Provide electronic photographic documentation of the finished site.

B. Any structural or cosmetic damage to toilet or adjacent government property shall be corrected by the contractor at no expense to the government.

C. Completed work must be approved by COR before payment.

CONCRETE APRON WITH “VANHORN ROLL”

PART 1 — GENERAL

1.01 Description

Provide all labor, materials, equipment, and incidentals necessary to construct three separate 4” thick 14’7-1/2” X 5’4” Portland cement aprons with “Vanhorn Roll” at new CXT toilet install locations. See figures 1,2, and 3 below.

PART 2 — MATERIALS

2.01 Concrete

Minimum compressive strength: 3,500 psi at 28 days Slump: 3–4 inches Air content: 5–7% entrained air Maximum aggregate size: 3/4 inch Fiber reinforcement to be included in concrete mix Cement: ASTM C150 Type I/II Portland Cement

No Quality Assurance/Quality Control testing is required; however, contractor shall provide a copy of the batch ticket to COR.

2.02 Steel Reinforcement

A. Steel reinforcing bar shall be Grade 60 meeting ASTM A615 specifications.

B. Reinforcing bars shall be anchored into CXT toilet structure a minimum of 12” using Simpson Strong Tie ET-3G epoxy or approved equal.

2.03 Base Course

A. Use minimum of 4 inches of 3/4” minus compacted aggregate base course placed under concrete slab.

2.04 Expansion Joint Material

A. Use 1/2-inch pre-molded asphalt-impregnated fiberboard or approved equal for expansion joint between vault toilet building and concrete apron.

PART 3 — EXECUTION

3.01 Subgrade Preparation

A. Excavate to required depth and remove any unsuitable material.

B. Apply sufficient moisture and compact aggregate base course material with a mechanical whacker‑type tamper until visual displacement of aggregate base course has ceased.

3.02 Forming

A. Use straight, clean, adequately braced forms.

B. Walking surface should have a 2% cross-slope away from vault toilet for positive drainage except for the outside 18” of apron.

C. Concrete apron walking surface shall be flush with that of the vault toilet where they meet.

D. Outside edge of apron shall incorporate a “Vanhorn Roll” to promote ADA accessibility longevity. See Figures 1, 2, and 3 below.

Figure 1

Figure 2

Figure 3

3.03 Placement of Concrete

A. Place concrete continuously, consolidate to eliminate voids and honeycombing, strike off, and float to uniform flat surface.

3.04 Finishing

A. Apply light broom finish perpendicular to the vault toilet.

B. Tool edges with 1/4-inch radius.

C. Construct control joints spaced every five feet, one inch in depth.

D. ½” expansion joint to be placed between the vault toilet and new concrete apron.

3.05 Curing

A. Cure for minimum 72 hours using curing compound or a moisture-retaining method.

B. Protect from pedestrian traffic for 24 hours and wheeled loads for 7 days.

3.06 Backfilling and Cleanup

A. Backfill edges with compacted soil, restore disturbed areas, remove forms after curing.

3.07 Tolerance

A. Surface deviation shall not exceed 1/4 inch in 10 feet; thickness tolerance +0 / –1/2 inch.

NEW CXT® VAULT TOILET PROCURMENT OPTION ITEM #7

PART 2 – PROCUREMENT

2.1 PRECAST CONTRETE VAULT TOILET REQUREMENTS

A. New vault toilet shall be CXT® Gunnison style 6’-6” X 14’-8” ADA Compliant right hand screen single vault toilet (Brand name or approved equal). Color shall be single color in “Buckskin”, the walls shall have “barnwood” wall texture with standard cedar shake roof texture. Contractor to provide product submittal for acceptance prior to procurement/installation.

B. New toilet shall have the following minimum specifications:

• Single Vault, unisex

• Snow load: 350 LB/SF

• Floor load: 400 LB/SF

• Wind load: 150 MPH, exposure C

• Seismic load: Category E

• 1000-gallon concrete waste vault with Polyethylene Vault Liner made of a Roto molded 8460 polyethylene with minimum thickness of .100

• Vault building shall have a minimum 4” wall, 4½” roof, and 5” floor thickness

• Vault buildings have a one-piece floor unit to prevent panels that migrate in different directions during periods of freeze/thaw stress

• Vault buildings have a one-piece full length and width vault unit to support the building, screen area, and snow loads evenly

• Doors are flush panel type 1¾” thick, minimum 16-gauge galvanized steel, top painted with DTM ALKYD

• Door frames are knockdown or welded type, single rabbet, minimum 16-gauge prime coated steel top painted with DTM ALKYD, width to suit wall thickness

• Three (3) door hinges per door with dull chrome plating 4½” x 4½”, adjustable tension, and automatic closing for each door

• Door stop meeting ANSI 156.16

• Coat hook 16-gauge (1.5mm), type 304 stainless steel

• Upper hook extends at least 2½” from the wall, Lower hook will extend at least

1¼” from the wall

• ADA compliant grab bars 18-gauge, type 304 stainless steel with 1½” clearance

• ANSI/BHMA certified Grade 1 mortise lockset for exterior door

• One piece HDPE polyethylene, ADA compliant, toilet riser

• Toilet paper dispenser, constructed of ¼” thick, type 304 stainless steel holding three (3) standard rolls of toilet paper

• 12” diameter vent stack and a minimum 3’ higher than the roof peak

• Lockable, hinged vault cleanout cover 24” in diameter (min)

• Windows and cleanout cover frames are constructed from steel

• Window glazing is ³̷₁₆” thick translucent pebble finished mar-resistant Lexan

2.2 VAULT TOILET DELIVERY INSTRUCTIONS

A. The new vault toilet should be delivered to the Fort Bayard Administrative Site on the Gila National Forest approx. 13 miles Northeast of Silver City, NM.

The site is located at 32.842075 ° X -109.140944 ° and accessible by semi-truck or tractor trailer.

Contractor is responsible for all unloading.

4.0 GOVERNMENT FURNISHED EQUIPMENT

A lock combination will be provided for working access to Gomez Peak and Little Walnut recreation areas. A Forest Service gate key may also be provided for access to gated areas during working hours. CXT® brand steel lifting plates will be provided for use by the contractor for removing and installing the CXT® toilet components, if desired. If used, the contractor shall return them in the same usable condition as they received them, or they will be required to provide the government with new plates.

5.0 DELIVERABLES

In addition to the work described above, the contractor is to provide electronic photographs of each site prior to starting work and upon completion for recordkeeping. Copies of the waste disposal records must also be provided for the pumped wastewater and any other debris disposed of as part of this work. The contractor shall provide a copy of any applicable concrete batch tickets to COR.

6.0 CONTRACT REQUIREMENTS

Contract Time: The Period of Performance will be 90 days after issuance of Notice to Proceed

(NTP).

Point of Contact: The contractor shall submit and coordinate all deliverables to the following government representative:

Contracting Officer’s Representative:

Logan Ross, Forest Engineer Gila National Forest 3005 E Camino Del Bosque, Silver City, NM 88061

Attachments:

Attachment A – Statement of Work Attachment B - Schedule of Items Attachment C - Photos Attachment D – Map1 Attachment E – Map2 Attachment F – Wage Determination Attachment G - Sustainable Products List

2026 Vault Toilet Decommission
Gila National Forest
PART 1 — GENERAL
1.01 Description
PART 2 — MATERIALS
2.01 Concrete
2.03 Base Course
2.04 Expansion Joint Material
PART 3 — EXECUTION
3.01 Subgrade Preparation
3.02 Forming
3.03 Placement of Concrete
3.04 Finishing
3.05 Curing
3.06 Backfilling and Cleanup
3.07 Tolerance