About this opportunity
The USDA Forest Service seeks proposals for the Forest-Wide Decommissioning Project at the Tonto National Forest under solicitation 127EAX27Q0013, a Total Small Business set-aside. Questions are due November 20, 2026 at 1:00 PM Central Standard Time, and proposals are due December 7, 2026 at 1:00 PM Central Time. The government anticipates a firm-fixed-price contract awarded to a single contractor.
Amendment 0001, dated November 18, 2026, moved the proposal due date from November 30, 2026 to December 7, 2026 and revised the period of performance to December 14, 2026 through December 13, 2027. Bidders must acknowledge receipt of the amendment before the deadline. Proposals go to Contracting Officer Troy A. McCullough at troy.mccullough@usda.gov.
Place of performance is Roosevelt, Arizona, with work at recreation sites in the Tonto Basin and Globe Ranger Districts. The base bid covers decommissioning of seven campground and group sites, and Jones Water Campground is an option bid. Work requires removing structures and disposing of them outside National Forest boundaries, with complete removal and site restoration. The contractor supplies all labor, materials, equipment, freight, licenses, and permits, and handles NESHAP permits, asbestos and lead-based paint testing, a Storm Water Pollution Prevention Plan, and beehive removal. Asbestos abatement requires an Arizona Asbestos Abatement Contractor license certification, with asbestos-containing material double-bagged in 6-mil plastic and landfilled. Specifications list four entrance station buildings, five flush and vault toilets, three septic tanks, and asphalt loop pavement totaling approximately 24,000 square yards. Construction is limited to 7 AM to 5 PM, Monday through Friday, with site disturbance limited to 20 feet beyond building perimeters.
Work must begin within 10 calendar days of notice to proceed and finish within 150 calendar days. A performance bond is required. Davis-Bacon wages apply, and invoices must be submitted through the Treasury Invoice Processing Platform.
Evaluation factors are technical approach, key personnel qualifications and experience, performance schedule (CPM schedule or Gantt chart), pricing, and past performance. Award goes to the highest technically rated proposal with fair and reasonable pricing and acceptable or neutral past performance. Tradeoffs will not be conducted, and the lowest price does not guarantee award. The source does not state factor weights. Proposals must include a work plan, a detailed schedule, personnel and equipment resources including subcontractors, a site-specific safety plan, and three references for similar projects completed within the past three years.
NAICS code is 238910, Site Preparation Contractors, and PSC is P500, Salvage–Demolition of Structures/Facilities (Other Than Buildings).
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT 0001 - Extends Offer Due Date to December 7th, 2026 @1300 Central Time
The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots.
Update #1 ·
The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Camptonville Housing Decommissioning | Forest Service | Total Small Business | |
| End of the World Long Term Stewardship | Forest Service | No set-aside | |
| Invitation for Bids, Camp Navajo, Arizona, Lump Sum Contract | ENDIST Fort Worth | No set-aside | |
| Pomeroy Ranger District NZ Blowdown Cleanup | Forest Service | Total Small Business | |
| 12445127B0001 AZ Lakeside Office Sewer Line Replacement | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity