GAOA Blue Mountain Scenic Byway Chip Seal-Road Repair

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240BH21R0028
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Ukiah, Oregon 97880, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks offers to prepare asphalt surfaces and apply a single course chip seal to sections of two National Forest System roads totaling approximately 55 miles in Baker and Umatilla counties in Oregon. The U.S. Forest Service Pacific Northwest Region is procuring these road repair services, with a base requirement to prepare 5 miles of Road 52 and apply chip seal to 33.46 continuous miles, and optional additional work that could include similar treatment to 22.05 miles of Road 53 if funding permits. Offerors must be registered in SAM and submit all required representations and certifications by the June 30, 2021 deadline. Evaluation will consider technical qualifications and price.

This is a total small business set-aside. The primary NAICS code is 237130 and PSC code R499 cover highway, street, and bridge construction. The government estimates the contract value is between $1 million to $5 million, to be performed between July and October 2021 near Ukiah, Oregon. Temporary traffic control and staging areas at 5 mile intervals are required. The solicitation has been available on SAM.gov since May 20, 2021.

Notice text

4 versions

Update #4 · Latest ·

AMENDMENT THREE POSTED ON 06/22/2021

AMENDMENT TWO POSTED ON 06/04/2021

AMENDMENT ONE POSTED ON 06/01/2021

SOLICITATION POSTED ON 05/24/2021

Description of Work

This project consists of preparing the asphalt surface and placing a single course chip seal on sections of National Forest System Roads 52 and 53, also known as the Blue Mountain Scenic Byway.  There are Base and Optional Work Items in this contract.  The Base Items consist of selectively preparing multiple sections of Road 52 from North Fork John Day Camp Ground to Umatilla County Road 1475.  Existing asphalt surface to be prepared, where areas of distress have occurred, is a combination of BST, asphalt patching, and thin asphalt overlay with an average thickness of 1”-2”, although there are some thicker spots along the route.  After preparing approximately 5 miles of road (locations to be staked on the ground by the FS), a chip-seal using CRS-2P oil and 1/2” Chip Rock (commercial source) would be placed over the entire 33.46 mile section. Optional work items include similar work on a 22.05 mile section of NFSR 53 between junction of Highway 244 and Highway 395 to the junction of NFSR 53 and NSFR 21.  For the optional items, road surface will be prepared and covered with the same chip seal as the Base Work Items and will include permanent striping. The location and quantities of the optional work items will vary dependent on the availability of funding.  These locations will be marked on the ground by the Forest Service prior to commencement of work in the area. Staging areas for chip rock, to be established at 5 mile intervals, along the routes prior to award.

Temporary traffic control utilizing flaggers and pilot car operations shall be required.

Location

This project is located approximately 50 miles west of Baker City, Oregon.  To reach the location of the Base Items of Work, travel southwest on Hwy 7 from Baker City, OR to Sumpter, OR and follow NSFR 73 north to North Fork John Day Campground where the project begins T 7 S, R 36 E, SEC. 34. The project ends 5 miles east of Ukiah, OR at the beginning of Umatilla County Road 1475, T 6 S, R 32 E, SEC. 6.

The Optional Items of Work is located from the junction of Hwy 395 and Hwy 244 on NFRS 53, T 5 S, R 31 E, SEC. 15.  From the junction, continue 22.05 miles on Road 53 to the junction with NFSR 21, T 5 S, R 28 E, SEC. 4. 

The anticipated start work date is July 2021 and work completed by October 2021.

In accordance to FAR 36.204, the Government’s estimated magnitude of this project (Base and Optional Items) is between $1,000,000 and $5,000,000.

The solicitation will be available for download exclusively via https://beta.sam.gov on or about 05/20/2021. Paper copies of the solicitation will not be issued.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #3 ·

AMENDMENT TWO POSTED ON 06/04/2021

AMENDMENT ONE POSTED ON 06/01/2021

SOLICITATION POSTED ON 05/24/2021

Description of Work

This project consists of preparing the asphalt surface and placing a single course chip seal on sections of National Forest System Roads 52 and 53, also known as the Blue Mountain Scenic Byway.  There are Base and Optional Work Items in this contract.  The Base Items consist of selectively preparing multiple sections of Road 52 from North Fork John Day Camp Ground to Umatilla County Road 1475.  Existing asphalt surface to be prepared, where areas of distress have occurred, is a combination of BST, asphalt patching, and thin asphalt overlay with an average thickness of 1”-2”, although there are some thicker spots along the route.  After preparing approximately 5 miles of road (locations to be staked on the ground by the FS), a chip-seal using CRS-2P oil and 1/2” Chip Rock (commercial source) would be placed over the entire 33.46 mile section. Optional work items include similar work on a 22.05 mile section of NFSR 53 between junction of Highway 244 and Highway 395 to the junction of NFSR 53 and NSFR 21.  For the optional items, road surface will be prepared and covered with the same chip seal as the Base Work Items and will include permanent striping. The location and quantities of the optional work items will vary dependent on the availability of funding.  These locations will be marked on the ground by the Forest Service prior to commencement of work in the area. Staging areas for chip rock, to be established at 5 mile intervals, along the routes prior to award.

Temporary traffic control utilizing flaggers and pilot car operations shall be required.

Location

This project is located approximately 50 miles west of Baker City, Oregon.  To reach the location of the Base Items of Work, travel southwest on Hwy 7 from Baker City, OR to Sumpter, OR and follow NSFR 73 north to North Fork John Day Campground where the project begins T 7 S, R 36 E, SEC. 34. The project ends 5 miles east of Ukiah, OR at the beginning of Umatilla County Road 1475, T 6 S, R 32 E, SEC. 6.

The Optional Items of Work is located from the junction of Hwy 395 and Hwy 244 on NFRS 53, T 5 S, R 31 E, SEC. 15.  From the junction, continue 22.05 miles on Road 53 to the junction with NFSR 21, T 5 S, R 28 E, SEC. 4. 

The anticipated start work date is July 2021 and work completed by October 2021.

In accordance to FAR 36.204, the Government’s estimated magnitude of this project (Base and Optional Items) is between $1,000,000 and $5,000,000.

The solicitation will be available for download exclusively via https://beta.sam.gov on or about 05/20/2021. Paper copies of the solicitation will not be issued.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #2 ·

AMENDMENT ONE POSTED ON 06/01/2021

SOLICITATION POSTED ON 05/24/2021

Description of Work

This project consists of preparing the asphalt surface and placing a single course chip seal on sections of National Forest System Roads 52 and 53, also known as the Blue Mountain Scenic Byway.  There are Base and Optional Work Items in this contract.  The Base Items consist of selectively preparing multiple sections of Road 52 from North Fork John Day Camp Ground to Umatilla County Road 1475.  Existing asphalt surface to be prepared, where areas of distress have occurred, is a combination of BST, asphalt patching, and thin asphalt overlay with an average thickness of 1”-2”, although there are some thicker spots along the route.  After preparing approximately 5 miles of road (locations to be staked on the ground by the FS), a chip-seal using CRS-2P oil and 1/2” Chip Rock (commercial source) would be placed over the entire 33.46 mile section. Optional work items include similar work on a 22.05 mile section of NFSR 53 between junction of Highway 244 and Highway 395 to the junction of NFSR 53 and NSFR 21.  For the optional items, road surface will be prepared and covered with the same chip seal as the Base Work Items and will include permanent striping. The location and quantities of the optional work items will vary dependent on the availability of funding.  These locations will be marked on the ground by the Forest Service prior to commencement of work in the area. Staging areas for chip rock, to be established at 5 mile intervals, along the routes prior to award.

Temporary traffic control utilizing flaggers and pilot car operations shall be required.

Location

This project is located approximately 50 miles west of Baker City, Oregon.  To reach the location of the Base Items of Work, travel southwest on Hwy 7 from Baker City, OR to Sumpter, OR and follow NSFR 73 north to North Fork John Day Campground where the project begins T 7 S, R 36 E, SEC. 34. The project ends 5 miles east of Ukiah, OR at the beginning of Umatilla County Road 1475, T 6 S, R 32 E, SEC. 6.

The Optional Items of Work is located from the junction of Hwy 395 and Hwy 244 on NFRS 53, T 5 S, R 31 E, SEC. 15.  From the junction, continue 22.05 miles on Road 53 to the junction with NFSR 21, T 5 S, R 28 E, SEC. 4. 

The anticipated start work date is July 2021 and work completed by October 2021.

In accordance to FAR 36.204, the Government’s estimated magnitude of this project (Base and Optional Items) is between $1,000,000 and $5,000,000.

The solicitation will be available for download exclusively via https://beta.sam.gov on or about 05/20/2021. Paper copies of the solicitation will not be issued.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Update #1 ·

SOLICITATION POSTED ON 05/24/2021

Description of Work

This project consists of preparing the asphalt surface and placing a single course chip seal on sections of National Forest System Roads 52 and 53, also known as the Blue Mountain Scenic Byway.  There are Base and Optional Work Items in this contract.  The Base Items consist of selectively preparing multiple sections of Road 52 from North Fork John Day Camp Ground to Umatilla County Road 1475.  Existing asphalt surface to be prepared, where areas of distress have occurred, is a combination of BST, asphalt patching, and thin asphalt overlay with an average thickness of 1”-2”, although there are some thicker spots along the route.  After preparing approximately 5 miles of road (locations to be staked on the ground by the FS), a chip-seal using CRS-2P oil and 1/2” Chip Rock (commercial source) would be placed over the entire 33.46 mile section. Optional work items include similar work on a 22.05 mile section of NFSR 53 between junction of Highway 244 and Highway 395 to the junction of NFSR 53 and NSFR 21.  For the optional items, road surface will be prepared and covered with the same chip seal as the Base Work Items and will include permanent striping. The location and quantities of the optional work items will vary dependent on the availability of funding.  These locations will be marked on the ground by the Forest Service prior to commencement of work in the area. Staging areas for chip rock, to be established at 5 mile intervals, along the routes prior to award.

Temporary traffic control utilizing flaggers and pilot car operations shall be required.

Location

This project is located approximately 50 miles west of Baker City, Oregon.  To reach the location of the Base Items of Work, travel southwest on Hwy 7 from Baker City, OR to Sumpter, OR and follow NSFR 73 north to North Fork John Day Campground where the project begins T 7 S, R 36 E, SEC. 34. The project ends 5 miles east of Ukiah, OR at the beginning of Umatilla County Road 1475, T 6 S, R 32 E, SEC. 6.

The Optional Items of Work is located from the junction of Hwy 395 and Hwy 244 on NFRS 53, T 5 S, R 31 E, SEC. 15.  From the junction, continue 22.05 miles on Road 53 to the junction with NFSR 21, T 5 S, R 28 E, SEC. 4. 

The anticipated start work date is July 2021 and work completed by October 2021.

In accordance to FAR 36.204, the Government’s estimated magnitude of this project (Base and Optional Items) is between $1,000,000 and $5,000,000.

The solicitation will be available for download exclusively via https://beta.sam.gov on or about 05/20/2021. Paper copies of the solicitation will not be issued.

NOTE:  prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Files

Notice history

Notice Type Posted
GAOA Blue Mountain Scenic Byway Chip Seal-Road Repair Award Award Notice
This notice Latest solicitation Solicitation
GAOA Blue Mountain Scenic Byway Chip Seal-Road Repair Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
USFS, Dakota Prairie Grasslands, Little Missouri NG Road Maintenance North Dakota, United States · NAICS 237310 Forest Service Total Small Business
Jake Rocks Road Reconstruction Warren, Pennsylvania 16365, United States · NAICS 237310 Forest Service Total Small Business
Pacific Northwest (PNW) Stewardship BPA- Region 6 (OR & WA) - OPEN/CONTINUOUS Portland, Oregon 97204, United States · NAICS 115310 Forest Service No set-aside
AZ BL COLO 7528(1) Burro Creek Road Kingman, Arizona 86401, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors