This document provides details for a federal contract solicitation to prepare and chip seal sections of two national forest system roads in Oregon. The base work includes preparing approximately 5 miles of Road 52 and applying a chip seal to its 33.46 mile length. Optional work includes similar preparation and sealing of the 22.05 mile Road 53. The single course chip seal will use CRS-2P oil and 1/2 inch chip rock. Staging areas must be established at 5 mile intervals along the routes. Temporary traffic control with flaggers and a pilot car is required. The anticipated start date is July 2021 with completion by October 2021. The solicitation was posted on May 24, 2021 and will be available on SAM.gov, with proposals due by June 30, 2021 at 4:00pm PDT. The government estimates the project value is between $1,000,000 to $5,000,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION 1. CONTRACT ID CODE Page of Pages
1 2
2. Amendment 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No.
THREE 06/22/2021
6. Issued By: Code 7. Administered By: Code USDA-FS, CSA Northwest 6 1220 SW 3rd Avenue, Suite 310 Portland, Oregon 97204-2829
See Block 6
8. Name and Address of Contractor
(X) 9A. Amendment of Solicitation No.
1240BH21R0028
9B. Dated (See Item 11)
05/24/2021 10A. Modification of Contract No.
10B. Date Issued (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE
CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the Contract
Order No. in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return ___ copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
GAOA Blue Mountain Scenic Byway Chip Seal-Road Repair
The above referenced Solicitation is hereby amended:
-See attached Q & A -The due date has been extended to 06/30/2021, 4:00pm (PDT)
Return a copy of this amendment with your proposal package or acknowledge on the SF-1442
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer 16A. Name and Title of Contracting Officer
Leslie Solberg
15B. Contractor/Offeror Date Signed 16B. United States of America Date Signed
(Authorized Signature) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV.10-83)
PRESCRIBED BY GSA
FAR (48CFR) 53.243
Amendment Three GAOA Blue Mountain Scenic Byway Chip Seal, Solicitation 1240BH21R0028
1. Under Section C-1 Summary of Work for Solicitation, could the Government please define what BST stands for?
Existing asphalt surface to be prepared, where areas of distress have occurred, is a combination of BST, asphalt patching, and thin asphalt overlay with an average thickness of 1”-2”, although there are some thicker spots along the route.
BST (Bituminous Surface Treatment) is just another term for chip seal
2. Can the Government provide a separate line item for Asphalt Patching with a tonnage quantity?
No asphalt patching is anticipated on this project.
3. Section C-1 Summary of work states that permanent striping will be included. Can the Government provide detail on the type of striping? Will there be a separate line item?
No permanent striping on the 52 road (Base item), but there is striping on the 53 road (Option item). Please including striping in your estimate for the NFSR 53 section of the project.
4. Is the Government wanting Fog Seal for this project? If so, the rate and Square Yard quantity?
No fog seal called for in this project.
5. Is the start date and completion date going to be changed or pushed back?
F.2 The bid states a start date of 7/1/21 and Completed by 9/30/21, bids 6/23/21 and typically award takes 2 weeks. Solicitation states Government requires 2 weeks to approve submittals and 30 days for crossing Bridges.
Yes, we anticipate the start date changing. All base items shall be completed in 2021. Completion of option items may be extended into 2022.
6. What are Bridge load limits for NFSR's 52 and 53?
NFSR 52 only has one bridge, at MP 0.9 (about that distance north of the NF John Day River). It is still under construction but can be crossed. It has no load rating but was designed for HL-93 truck loading. NFSR 53 has no bridges.
7. Amendment 1 states that all grass will be removed from cracks. What line item will this scope of work fall under or will a separate line item be provided? If a separate line item is issued, quantity and unit of measurement? Will the cracks require crack seal? Or would the Government consider a scrub seal?
Spec 407.06 includes reference to 406.04 (a), which includes removal of deleterious material such as grass in cracks. Removal of grass from cracks would be incidental to pay items 40701.
8. In the solicitation it states kick brooming from water ways, FP-14 section 407.10 however the last paragraph states "complete vacuum sweeping by the next morning. Could the Government please clarify if the contractor is kick brooming or vacuum?