About this opportunity
The Department of the Army Corps of Engineers Norfolk District has completed bid opening for construction of 24 concrete turning pads with site drainage improvements and road alignment work at Fort Lee Vehicle Recovery Range, with bids received October 14, 2026. This procurement is a 100% Competitive 8(a) Small Business Set-Aside under NAICS 236220, with award made on lowest responsive bid basis.
Place of performance is Fort Lee, Virginia. Work is structured in three phases executed sequentially, with the contractor granted access to only one phase at a time and completion of each phase required before proceeding to the next; phases two and three are optional and performed only if options are exercised. During construction in one phase, the Army conducts training operations in the remaining two phases. The scope includes excavation of existing roadbeds, placement of concrete turning pads per design specifications, installation of storm drainage systems, and re-grading and alignment of connecting roads to integrate with completed pads. The project requires compliance with Fort Gregg-Adams security protocols (DES Form 190-2 badge processing, AT Level I training, criminal background checks), preconstruction conference within 35 calendar days of award, project superintendent with minimum 10 years construction experience and 5 years as superintendent on similar projects, and Critical Path Method scheduling using Primavera P6. Contractors must verify utility locations via ground-penetrating radar with 48-hour advance notice before excavation and comply with EM 385-1-1 safety requirements.
Contract magnitude is between $5 million and $10 million. Eleven bids were received; low bidder TST submitted $7,998,721.00. Government estimate was $8,829,000.00. Bidders must demonstrate Definitive Responsibility Criteria: prime contractor experience on at least one military installation construction contract within the continental United States completed within the past six years with minimum $1 million value, and prime or subcontractor experience placing minimum 700 square yards of concrete pavement on a U.S. federal construction contract within the past six years with minimum $1 million value. Performance must commence within 10 calendar days of notice to proceed and be completed within 365 calendar days. 100% performance and payment bonds are required. Davis-Bacon prevailing wage rates apply.
Notice text
9 versions
Update #9 · Latest ·
Purpose: Posting the Abstract of Offerors from the bid opening for solicitation W9123626BA006, Fort Lee Vehicle Recovery Range.
Update #8 ·
Note: Please see amendment 0006 for the final drawings and specifications.
Amendment 0007: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0007, extending the bid due date and bid opening date.
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Update #7 ·
Note: An Amendment 7 will be published today 29SEP to extend bids due date.
Amendment 0006: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0006. This amendment incoporates the revised solicitation documents dated August 31, 2026 in response to bidder inquiries. This amendment does not extend the bid due date and bid opening date. Please see the amendment for the complete summary of changes.
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Update #6 ·
Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change.
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Update #5 ·
Amendment 0004: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0004, extending the bid due date and bid opening date.
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Update #4 ·
Amendment 0003: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0003, extending the bid due date and bid opening date.
Project Summary:
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Update #3 ·
Amendment 0002: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0002, to view the site visit attendance log..
Project Summary:
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Update #2 ·
Amendment 0001: An amenedment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0001, to view the summary of changes, including site visit information.
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Update #1 ·
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Contractors should review and follow all bid instructions listed in the solicitation. Site Visit information will be provided in an upcoming amendment to the solicitation. Questions are to be submitted using ProjNet. Bids are to be submitted on the PIEE web site. See web site link within this notice to access PIEE.
Files
Show all 18
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Construction of a Vehicle Recovery Range at Fort Lee in Prince George County, VA | Pre-Solicitation | |
| Construction of Vehicle Recovery Range at Fort Lee in Prince George County, VA | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Fort Eustis Dredge Material Management Area (FEDMMA) | ENDIST Norfolk | Total Small Business |