Bid Schedule.pdf

PDF 374 KB Posted

Attached to
Fort Lee Vehicle Recovery Range
Solicitation number
W9123626BA006
Issued by

About this file

This is a Bid Schedule template for a federal construction contract focused on concrete turning pad installation work. The schedule contains three contract line items (CLINs) organized as a base proposal with two optional items, each priced on a "per Job" basis with quantities of one. CLIN 0001 represents the base proposal for Priority One work involving installation of concrete turning pads identified on solicitation drawing sheet G-005 according to the plans and specifications. CLIN 0002 and CLIN 0003 are optional line items for Priority Two and Priority Three work, respectively, with the same scope of concrete turning pad installation but mutually exclusive of the other line items—each excludes the work described in the competing CLINs to avoid duplication.

Offerors must complete the Unit Price and Amount columns for each CLIN, with all prices rounded to the nearest whole dollar. The schedule requires the offeror's name to be entered at the top and a total estimated amount calculated for the base bid items. The mutual exclusivity of the three CLINs indicates that the government will select one primary priority level for award, with optional priorities available based on funding and operational needs.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

BID SCHEDULE

OFFEROR’S NAME: ATTACHMENT 1

BID SCHEDULE

OFFEROR’S NAME:

CONTRACT LINE ITEM SCHEDULE

CLIN Description Qty Unit of Issue

Unit Price

Amount

Base Proposal 0001 Priority One

Work for this CLIN includes Priority One; installation of concrete turning pads identified on solicitation drawing sheet G-005 and as described in the plans and specifications, excluding bid items 0002-0003.

1 Job $

0002 Option – Priority Two

Work for this CLIN includes Priority two; installation of concrete turning pads identified on solicitation drawing sheet G-005 and as described in the plans and specifications, excluding bid item 0001 and 0003.

1 Job $

0003 Option – Priority Three

Work for this CLIN includes Priority three; installation of concrete turning pads identified on solicitation drawing G-005 and as described in the plans and specifications, excluding bid item 0001-0002

1 Job

TOTAL ESTIMATED AMOUNT – BASE BID ITEMS $ $

NOTES:

All Unit Prices and Net Amounts must be rounded to the nearest whole dollar.