OF 1419 - Abstract of Offers CONST Bid Opening_final_.pdf
PDF 1 MB Posted
- Attached to
- Fort Lee Vehicle Recovery Range
- Solicitation number
- W9123626BA006
About this file
This is an Abstract of Offers for Construction (Optional Form 1419) documenting bids received for the Fort Lee Vehicle Recovery Range project by USACE Norfolk District in Norfolk, Virginia. The solicitation number is W9123626BA006, issued on 06/18/2026 with bids opened on 10/14/2026. The project contains three contract items: Priority One (Item 0001), Priority Two (Item 0002 - Option 1), and Priority Three (Item 0003 - Option 2), each measured in jobs.
Eleven offers were received from contractors: Arctic Peak, CoHo Construction, Doyon Technical Services, HH Apex JV, JBW Group LLC, Marco Federal Services, Miami Wiipica, Range Construction, RBA Engineering, Reasor Building, and TST. All offerors provided 20% bid bonds and acknowledged amendments. Total prices ranged significantly, from $7,998,721.00 (TST, lowest) to $18,481,677.00 (Miami Wiipica, highest). The base amount for Priority One ranged from $2,543,579.00 to $9,362,771.00 across offerors. Option totals for Priority Two and Three combined ranged from $3,110,560.00 to $10,094,552.70. The government estimate indicated a reasonable contract basis including profit at $8,829,000.00 for the complete project. The certifying officer was Michael Hagerty, Contracting Officer, and the abstract was signed on 16OCT2026.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
USACE Norfolk District 803 Front Street Norfolk, VA 23510
Fort Lee Vehicle Recovery Range
Priority One
Total Base Amount
Option 1: Priority Two
Option 2: Priority Three
Total Option Amount
Total Price
Job
Job
Job
2,931,000.00
2,931,000.00
3,085,000.00
2,813,000.00
5,898,000.00
8,829,000.00
2,931,000.00
3,085,000.00
2,813,000.00
5,446,696.00
3,014,053.00
1,442,542.00
5,446,696.00
5,446,696.00
3,014,053.00
1,442,542.00
4,456,595.00
9,903,291.00
4,864,740.00
4,864,740.00
2,012,720.00
1,097,840.00
3,110,560.00
7,975,300.00
4,864,740.00
2,012,720.00
1,097,840.00
W9123626BA006 1 4
Arctic Peak CoHo Construction
Bid Bond 20% Bid Bond 20%
Yes Yes
10/14/202606/18/2026
X
Michael Hagerty, Contracting Officer
16OCT2026
CONTINUATION SHEET
1. SOLICITATION NUMBER
W9123626BA006
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
Fort Lee Vehicle Recovery Range
4. OFFERS (Continued)
NO. 3 NO. 4 NO. 5 NO. 6
A. OFFEROR
Doyon Technical Services
A. OFFEROR
HH Apex JV
A. OFFEROR
JBW Group, LLC
A. OFFEROR
Marco Federal Services
B. BID SECURITY (Type and amount)
Bid Bond 20% B. BID SECURITY (Type and amount)
Bid Bond 20% B. BID SECURITY (Type and amount)
Bid Bond 20% B. BID SECURITY (Type and amount)
Bid Bond 20%
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
0001 1 Job 5,639,079.00 5,639,079.00 7,552,432.15 7,522,432.15 8,525,622.78 8,525,622.78 2,583,102.00 2,583,102.00
Total Base 5,639,079.00 7,552,432.15 8,525,622.78 2,583,102.00
0002 1 Job 2,453,921.00 2,453,921.00 6,283,474.86 6,283,474.86 5,675,000.00 5,675,000.00 3,001,812.00 3,001,812.00
0003 1 Job 1,218,488.00 1,218,488.00 3,811,077.84 3,811,077.84 2,700,000.00 2,700,000.00 2,600,320.00 2,600,320.00
Total Option 3,762,409.00 10,094,552.70 8,375,000.00 5,602,132.00
Total Price 9,311,488.00 17,646,984.85 16,900,622.78 8,185,234.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
2 4
1. SOLICITATION NUMBER
W9123626BA006
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
Fort Lee Vehicle Recovery Range
4. OFFERS (Continued)
NO. 7 NO. 8 NO. 9 NO. 10
A. OFFEROR
Miami Wiipica
A. OFFEROR
Range Construction
A. OFFEROR
RBA Engineering
A. OFFEROR
Reasor Building
B. BID SECURITY (Type and amount)
Bid Bond 20% B. BID SECURITY (Type and amount)
Bid Bond 20% B. BID SECURITY (Type and amount)
Bid Bond 20% B. BID SECURITY (Type and amount)
Bid Bond 20%
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED
Yes A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
0001 1 Job 9,362,771.00 9,362,771.00 5,117,100.00 5,117,100.00 4,163,121.00 4,163,121.00 5,682,003.00 5,682,003.00
Total Base 9,362,771.00 5,117,100.00 4,163,121.00 5,682,003.00
0002 1 Job 6,016,651.00 6,016,651.00 2,924,316.00 2,924,316.00 3,314,194.00 3,314,194.00 4,317,877.00 4,317,877.00
0003 1 Job 3,102,255.00 3,102,255.00 1,606,277.00 1,606,277.00 2,067,030.00 2,067,030.00 2,074,207.00 2,074,207.00
Total Option 9,118,906.00 4,530,593.00 5,381,224.00 6,392,084.00
Total Price 18,481,677.00 9,647,693.00 9,544,345.00 12,074,087.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
3 4
1. SOLICITATION NUMBER
W9123626BA006
PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
Fort Lee Vehicle Recovery Range
4. OFFERS (Continued)
NO. 11 NO.: NO.: NO.:
A. OFFEROR
TST
A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount)
Bid Bond 20% B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED
Yes
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
0001 1 Job 2,543,579.00 2,543,579.00
Total Base 2,543,579.00
0002 1 Job 2,931,268.00 2,931,268.00
0003 1 Job 2,523,874.00 2,523,874.00
Total Option 5,455,142.00
Total Price 7,998,721.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
4 4
| 2026-10-16T14:57:30-0400 | |
| HAGERTY.MICHAEL.CHRISTOPHER.1509816880 |
File details come from the government source that posted it. Updated .