Solicitation Amendment W9123626BA006_0001.pdf
PDF 4 MB Posted
- Attached to
- Fort Lee Vehicle Recovery Range
- Solicitation number
- W9123626BA006
About this file
This is Standard Form 30 (SF 30), an Amendment of Solicitation/Modification of Contract issued by the U.S. Army W2SD Endist Norfolk Contracting Office on June 29, 2026. The amendment modifies solicitation W9123626BA006, originally dated June 18, 2026, for a construction project at the U.S. Army Ordnance School Downer Range Complex located at 1055 River Road, Building 17500, Fort Lee, VA 23831.
The amendment incorporates two primary changes: (1) it adjusts the bidder inquiry due date from July 19, 2026 to July 17, 2026, and (2) it establishes site visit requirements and logistics for potential bidders. The amendment specifies that an organized site visit has been scheduled for July 7, 2026 at 10:00 a.m. EDT at the Fort Lee location. Bidders must convene at the site parking lot where installation badging is not required for initial access. Due to active range terrain conditions, navigation requires either 4-wheel drive (4WD) vehicles or All-Terrain Vehicles (ATVs), with the Government potentially providing transportation to escort potential bidders. Personally owned vehicles are strictly prohibited from accessing the active range prior to contract award. All attendees must wear appropriate Personal Protective Equipment (PPE) throughout the site visit. The amendment confirms that all other terms and conditions of the original solicitation remain unchanged and in full force and effect. The contracting officer is Michael Stevenson, reachable at 757-201-2133 or michael.l.stevenson@usace.army.mil.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation W9123626BA006 is hereby Block 14 (Description of Amendment/Modification):
amended as follows:
1. The purpose of this amendment is to incorporate the site visit information and changes the bidder inquiry date.
2. All other terms and conditions remain the same.
Change to Bidder Inquiry Due Date:
The due date for bidder inquiries is hereby changed from 19 July 2026 to 17 July 2026.
Section 00 21 00 - Instructions
Miscellaneous text in this section has been modified to:
SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The conditions, Differing Site Conditions, and Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: ___________Does not apply. See Below_________________
Address: __________Does not apply. See Below_________________
Telephone: ________Does not apply. See Below__________________
(End of Condition)
Alternate I (FEB 1995). If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic condition:
(b) An organized site visit has been scheduled for-
____________July 7, 2026, _at 10:00 a.m. EDT_____
W9123626BA0060001
(c) Participants will meet at-
U.S. Army Ordnance School
Downer Range Complex
1055 River Road, Building 17500
Fort Lee, VA 23831
Special Site Visit Instructions:
Participants shall convene at the site parking lot; installation badging is not required to access this initial meeting point. Due to terrain conditions, navigating the range complex requires a 4-wheel drive (4WD) vehicle or All-Terrain Vehicle (ATV). The Government may provide 4WD or ATV transportation to escort potential bidders across the range. Personally Owned Vehicles (POVs) are strictly prohibited from accessing the active range prior to contract award. All attendees must wear appropriate Personal Protective Equipment (PPE) for the duration of the site visit.
PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by ' .See Plans and Specs'
(b) Weather conditions ' '.See Plans and Specs
(c) Transportation facilities ' '.See Plans and Specs
(End of condition)
SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The conditions, Differing Site Conditions, and Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: ____________TBD_____________________________
Address: __________TBD_____________________________________
Telephone: ________TBD_____________________________
(End of Condition)
Alternate I (FEB 1995). If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic condition:
(b) An organized site visit has been scheduled for-
____________TBD____________________________________
(c) Participants will meet at-
____________TBD____________________________________
PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by .'See Plans and Specs'
(b) Weather conditions .'See Plans and Specs'
(c) Transportation facilities .'See Plans and Specs'
(End of condition)
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 29 JUN 2026 |
| ReqNo: |
| ProjNo: W9123626B1AUI |
| IssCode: W91236 |
| AdmCode: |
| IssuedBy: W2SD ENDIST NORFOLK |
KO CONTRACTING OFFICE, 803 FRONT STREET
NORFOLK, VA 23510-1096
UNITED STATES
MICHAEL STEVENSON, EMAIL: MICHAEL.L.STEVENSON@USACE.ARMY.MIL TELEPHONE: 757-201-2133 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W9123626BA006 |
| SolDate: 18 JUN 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .