Folsom Right Wing Dam Ditch Bypass Modifications
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140R2025R0004
- Agency
- Bureau of Reclamation Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KA Maintenance Of Dams
- Points of contact
-
- Ronald Gamo rgamo@usbr.gov (916) 978-4304
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Reclamation is soliciting small business contractors for the Folsom Right Wing Dam - North Fork Ditch Bypass Modifications project, a complex civil engineering construction effort involving removing existing conduit, concrete headwall demolition, seepage stability berm installation, and toe drain inspection well construction. The solicitation, numbered 140R2025R0004, will be evaluated using a Lowest Price Technically Acceptable approach with factors including Technical Approach (focusing on construction schedule/sequence and experience), Past Performance, and Price. Potential offerors are required to participate in both virtual and in-person site visits, with the virtual session held on January 23, 2025, and the in-person visit on January 24, 2025. Proposals are due by February 21, 2025 at 5:00 PM PST, with a 60-day offer acceptance period. Contractors must submit electronic proposals through Kiteworks and demonstrate compliance with detailed technical specifications and site access requirements.
The contract is designated as a total small business set-aside under NAICS code 237990 with a $45 million size standard, with an estimated price range between $5-10 million. The project is located at Folsom Dam in Folsom, California, spanning Sacramento and Placer Counties. Contractors will have a 372-calendar day performance period from April 25, 2025 to April 30, 2026, with a requirement to begin work within 7 calendar days after notice to proceed. Liquidated damages of $2,000 per day will be assessed for delays, and Davis-Bacon wage rates will apply. Key work restrictions include that onsite work at the Right Wing Dam and Left Wing Dam toe areas cannot commence before August 1, 2025, or after November 1, 2025, without specific approval. Performance and payment bonds are required within 7 days after contract award, and contractors must coordinate with ongoing USACE contractor activities throughout the project.
Notice text
This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells.
Attachments
Show all 19
Notice history
| Notice | Type | Posted |
|---|---|---|
| This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. | Award Notice | |
| Folsom Right Wing Dam Ditch Bypass Modifications | Solicitation | |
| Folsom Right Wing Dam - North Fork Ditch Bypass | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity