This is Amendment 0002 to solicitation 140R2025R0004 for the Folsom Right Wing Dam North Fork Ditch Bypass Modifications project issued by the Bureau of Reclamation. The amendment includes questions and answers, revised price schedules, and updated specifications for several sections including Use of Site, Work Restrictions, and Submittals.
Key changes include: clarification that all proposals must be submitted electronically with one copy of each volume by February 19, 2025 at 5PM PST; no onsite work can begin before August 1, 2025; excavation for North Fork Ditch conduits cannot begin after November 1 without approval; exploratory excavation for Left Wing Dam toe drains must begin before September 1, 2025; confirmation that physical proposal copies are not required; addition of new CLIN for temporary optical fiber cable; and updates to multiple technical specifications. The work involves removing existing conduit and concrete headwall, adding a seepage stability berm, installing toe drain inspection wells, and maintaining functionality of existing optical fiber cable throughout construction. Bidders must coordinate with USACE contractors who will be using the right-wing dam toe road through fall 2025.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2025R0004 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
01/13/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/13/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: Folsom Right Wing Dam - North Fork Ditch Bypass Modification B. PURPOSE: The purpose of this amendment is to incorporate various changes to solicitation documents
C. DESCRIPTION: Amendment 0002 Description of Changes:
1.) Offeror's Questions and Answers
2.) Revised Section B - Supplies or Services and Prices/Costs
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Abelardo Lopez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
3.) Revised Section L - Instruction, Conditions and Notices to Offerors
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2025R0004/0002
4.) Revised Section C - Specifications and Drawings
Remove Specification 01 14 10 - Use of Site and replace with Specification 01 14 10 - Use of Site, Amendment 0002.
Remove Specification 01 14 12 - Work Restrictions and replace with Specification 01 14 12 - Work Restrictions, Amendment 0002.
Remove Specification 01 33 00 - Submittals and replace with Specification 01 33 00 - Submittals, Amendment 0002.
Remove Specification 01 35 50 - Site Security and replace with Specification 01 35 50 - Site Security, Amendment 0002.
Remove Specification 31 23 22 - Secondary Entrance and replace with Specification 31 23 22
- Secondary Entrance, Amendment 0002.
Remove Specification 31 23 30 - Excavation and replace with Specification 31 23 30 - Excavation, Amendment 0002.
Remove Specification 31 24 54 - Zone 5, Slope Protection and replace with Specification 31 24 54 - Zone 5, Slope Protection, Amendment 0002.
Remove Specification 32 30 10 - Restoration and Revegetation and replace with Specification 32 30 10 - Restoration and Revegetation, Amendment 0002.
Remove Specification 32 31 17 - Concrete Vehicle Barrier and replace with Specification 32 31 17 - Concrete Vehicle Barrier, Amendment 0002.
Remove Specification 36 46 46 - Toe Drains and replace with Specification 36 46 46 - Toe Drains, Amendment 0002.
Remove Specification 33 82 23 - Optical Fiber Communications Transmissions and Distribution Cabling and replace with Specification 33 82 23 - Optical Fiber Communications Transmissions and Distribution Cabling, Amendment 0002.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2025R0004/0002
5.) Remove and replace the following Drawings:
Remove Drawing 485-D-60863 and replace with Drawing 485-D-60863 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60864 and replace with Drawing 485-D-60864 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60925 and replace with Drawing 485-D-60925 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60926 and replace with Drawing 485-D-60926 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60876 and replace with Drawing 485-D-60876 rev. 1 - Amendment 0002.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
The date and time for receipt of offer remains unchanged at February 19, 2025 by 1700 PST
Amendment No. 0002
Solicitation No. 140R2025R0004
Folsom Right Wing Dam North Fork Ditch Bypass Modifications
Offeror Questions and Answers
1. Question: Please confirm whether the contractor must submit hard copies for each proposal volume (I, II, III). If so, how many hard copies of each volume are required?
Response: All proposals must be submitted electronically with one (1) copy of each volume separate from the other. Please see Section L pp. L-8 to L-14 for further guidance.
2. Question: On Page L-P, Volume I, Section J - Attachment 07, please provide the subcontracting plan information, as I cannot find it in the solicitation documents.
Response: Please disregard (7) Subcontracting Plan requirement stated in p. L-9 of Section L as this has been removed via Amendment 0002.
3. Question: The contractor has already obtained CPARs from previous projects. Does the contractor still need to request PPQs for references?
Response: Yes, as stated in Section L of the solicitation, the submission of PPQs is required. See
p. L-14 for further guidance.
4. Question: Sheet # 21 Plan 485-D-60876 Refers to see Note #3, however notes only go to #2. Can you please provide direction as to where to see Sheet # 21 Plan 485-D-60876?
Response: See revised Drawing 485-D-60876.
5. Question: There are large pine trees as well as large, downed trees are these to be part of clearing & grubbing?
Response: Yes, if they are within the limits of clearing and grubbing indicated on the drawings and in accordance with Specification Section 31 11 00.
6. Question: Regarding the CDMS in section 01 31 30 – we do not know that any of the common construction management software that will meet all of the BOR’s requirements. Most of the online software that we have used to not track REA, RFC, and RFP’s as separate categories, for example. Has the BOR a software vendor that they are familiar with that meets all of the requirements of 01 31 30? Please advise.
Response: CDMS software programs that have been recently approved include, but not limited to, Procore, Trimble ProjectSight, Newforma Constructex, and Autodesk Construction Cloud.
7. Question: Please verify the date proposals are due date. The solicitation gives a date of 2/3 meanwhile the BOR’s online presentation and SAMs announce a 2/12 proposal due date. Please verify.
Response: The deadline for proposal submission has been updated to Wednesday, February 19, 2025, at 5PM PST via Amendment 0001.
8. Question: Please verify that physical print-outs in physical binders will not be necessary for the proposal and that all proposals will solely be electronic via Kiteworks. Please confirm.
Response: Physical print outs are not necessary since all proposals are to be submitted electronically to Contract Specialist, Ron Gamo at rgamo@usbr.gov.
9. Question: Please clarify the work that the contractor can perform before August 1.
Response: No onsite work can be performed prior to August 1. See revised Specification Section
01 14 12.
10. Question: Could you please clarify the intent of the video survey/ inspecting the toe drains? Is the government intending the contractor to conduct a toe drain inspection of the entire dam structure, or is the focus specifically on the recently installed toe drains?
Response: The entire toe drain system shall be inspected. See revised Specification Section 33 46
46.
11. Question: Regarding Drawing sheet 10 – Note 3 “Install security fence”, please clarify if the security fence is temporary or permanent and what Line Item shall this item be paid from?
Response: The security fence between the Contractor Use Area and California State Parks is temporary. See Note 8 on Drawing 485-D-60925 and revised Specification Section 31 23 22.
12. Question: Regarding Line Item 33 – Optical Fiber Cable (3,400 LF): Please clarify the location of the 3,400 LF of optical fiber cable in the drawings.
Response: See revised Drawing 485-D-60876 and revised Specification Section 33 82 23.
13. Question: Please clarify if there are additional onsite material resources the contractor could use for dirt fill.
Response: There are no borrow areas nor stockpiles available onsite to source material for the berm fill. Review Specification Section 31 24 53 Part 2.
14. Question: Please clarify which trees will be removed in the contractor-use areas, especially next to the North Fork conduit work area.
Response: Review Specification Section 31 11 00 Part 3.01 and revised Drawing 485-D-60863.
Protect elderberry shrubs in accordance with Specification Section 01 57 60.
15. Question: Please clarify the BOR’s intent for the temporary fiber optic work. Spefically, where are we to intercept and spice the existing line? Does the temp fiber need to be buried, or can it be run overhead or in conduit above ground? Is the intent to route it along the entire perimeter of the
Contractor Use Area A to ensure it does not get damaged by construction traffic?
Response: Alignment of the temporary fiber optic cables to be determined by the Contractor.
Temporary cables may be installed in conduit above ground. See revised Specification Section 33
82 23, revised Drawing 485-D-60876, and revised Price Schedule.
16. Question: Where is the permanent fiber to be spiced at?
Response: See revised Drawing 485-D-60876.
17. Question: Please clarify that the quantity of, trench, conduit, and backfill for bid item 4 shall match the 3,400 LF of bid item 33?
Response: Yes, however the estimated quantity has been changed. See revised Price Schedule and revised Specification Section 33 82 23.
18. Question: For the permanent pull boxes on sheet 21, we see two new boxes with the note “New pull box, see note 3”. We are unable to find note 3 on this sheet.
19. Question: Please clarify the routing of the temporary fiber optic. We are unable to find on the project plans.
Response: Routing of the temporary optical fiber cable shall be determined by the Contractor and approved by the COR. See revised Specification Section 33 82 23.
20. Question: Please clarify the quantity of pull boxes for the temporary fiber optic. We see two new boxes for the permanent on sheet 21. How many temporary pull boxes will the BOR require?
Response: No temporary pull boxes are required. The temporary optical fiber cables shall be spliced within the new pullboxes shown on revised Drawing 485-D-60876. See also revised
Specification Section 33 82 23.
21. Question: Please clarify that the temporary fiber optic and the permanent fiber optic quantities are both contained in that 3,400 LF for bid item 33?
Response: No. A new CLIN has been added for the temporary cables. See revised Price Schedule and revised Specification Section 33 82 23.
22. Question: Please clarify where the splices for the temporary fiber optic will start and end?
23. Question: Please clarify why the BOR specifically is requiring temporary fiber optic?
Response: Functionality of the existing optical fiber cable must be maintained throughout construction. A temporary routing of the optical fiber cables is necessary to complete the work required within the North Fork Ditch area before installation of the new permanent alignment.
24. Question: We see Elderberrys on sheets 60863 and 60925. The specs require these shrubs to be protected by K-Rail. Please confirm. For bidding purposes does each Elderberry require 4 k-rails?
Response: Install a sufficient number of concrete barriers to enclose the dripline around the elderberry shrubs indicated on the drawings. Additionally, see revised Drawing 485-D-60926.
25. Question: Will the same 60K type rail as installed along the San Juan waterline be required for
Elderberry protection here?
Response: Install concrete barriers around the elderberry shrubs in accordance with Specification
Section 32 31 17. Additionally, see revised Drawings 485-D-60925 and 485-D-60926.
26. Question: Under what bid item will the elderberry k-rail be paid for? Does the 300 LF of bid item 26 include the Elderberry shrub protection?
Response: Concrete barriers for the elderberry shrubs shall be paid under CLIN 26. Additionally, see revised Drawing 485-D-60925.
27. Question: The BOR has a stockpile of existing k-rails located at Right Wing Dam. These K-rails were pulled off of Dike 1 during a historical project. Will the BOR require the purchase of new
K-rail when they have a surplus onsite?
Response: There are no requirements to purchase new concrete barriers. All required “k-rail” to be furnished by the Contractor are temporary and shall be removed upon contract completion. See revised Specification Section 32 31 17 and revised Drawing 485-D-60925.
28. Question: Please clarify that the BOR wants the new 60K K-rails installed along the San Juan water line removed at the end of the job?
Response: The existing concrete barriers currently installed along the San Juan Pipeline belong to Reclamation, shall remain in place for the duration of the contract and will be removed and relocated by the Contractor at the completion of the contract. The Contractor is not required to furnish “k-rail” at this location. See revised Drawing 485-D-60925.
29. Question: Under what bid item shall the temporary security fence be bid under? We see that the temp fence on sheet 7 is located via Northing/ Easting coordinates and that the length has been pre-determined by the BOR. Please consider providing a separate bid item for this temporary security fence as the unit rate to install and remove this fence will be different from the permanent fence?
Response: There is no temporary security fence shown on Drawing 485-D-60863 (Sheet 7). See revised Drawings 485-D-60863 and 485-D-60876 for fencing requirements. Also, see revised
Price Schedule.
Folsom Right Wing Dam
North Fork Ditch Bypass Modification
American River Division – Folsom Unit – Central Valley Project, California Amendment 0002
Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
FOLSOM RIGHT WING DAM
NORTH FORK DITCH BYPASS
AMERICAN RIVER DIVISION – FOLSOM UNIT
CENTRAL VALLEY PROJECT, CALIFORNIA
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated
Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory
Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and
Unit
Unit Price Amount
1 WBR
1452.232-
Mobilization and Preparatory
Work
For the lump sum of $
2 01 31 30 Contract Document
Management System
(CDMS)
For the lump sum of $
3 03 81 10 Headwall Concrete Removal For the lump sum of $
B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and
Unit
Unit Price Amount
4 27 05 43 Fiber Communications
Infrastructure
For the lump sum of $
5 31 02 10 Dust Abatement For the lump sum of $
6 31 03 33 Unwatering For the lump sum of $
7 31 03 33 Dewatering Wells 160 lin ft $ $
8 31 03 33 Dewatering Wells Operation For the lump sum of $
9 31 03 33 Dewatering Wells Power 2.3 months $ $
10 31 09 10 Abandoning and Removing
Existing Instrumentation
For the lump sum of $
11 31 09 22 Protecting and Extending
Existing Instrumentation
For the lump sum of $
12 31 11 00 Clearing and Grubbing For the lump sum of $
13 31 14 10 Stripping 340 yd3 $ $
14 31 23 22 Secondary Entrance For the lump sum of $
15 31 23 23 Slide Rail Shoring System
Design, Installation, and
Removal
For the lump sum of $
16 31 23 30 Excavation 1,100 yd3 $ $
17 31 23 30 Rock Excavation 2 yd3 $ $
18 31 24 51 Zone 2, Sand Filter 770 yd3 $ $
19 31 24 52 Zone 3, Gravel Drain 90 yd3 $ $
20 31 24 53 Zone 4, Berm Fill 4,200 yd3 $ $
21 31 24 54 Zone 5, Slope Protection 1,600 yd3 $ $
22 32 15 10 Gravel Surfacing 60 yd3 $ $
23 32 30 10 Restoration and Revegetation 1 acre $ $
24 32 31 10 Chain Link Fence 980 lin ft $ $
25 32 31 10 Removal and Disposal of
Existing Chain Link Fence
850 lin ft $ $
B - 3
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and
Unit
Unit Price Amount
26 32 31 17 Portable Concrete Barriers
Type 60K
300 lin ft $ $
27 32 91 19 Topsoil 1 acre $ $
28 33 11 19 Remove Existing Bypass
Pipes
For the lump sum of $
29 33 46 36 Toe Drain Inspection Wells 4 ea $ $
30 33 46 36 Toe Drain Cleanouts 2 ea $ $
31 33 46 46 Toe Drain Modifications For the lump sum of $
32 33 82 23 Fiber Connections For the lump sum of $
32A 33 82 23 Temporary Optical Fiber
Cable
For the lump sum of $
33 33 82 23 Permanent Optical Fiber
Cable
820 lin ft $ $
TOTAL FOR PRICE SCHEDULE $_________________
END OF SUPPLIES OR SERVICES AND PRICES/COSTS
B - 4
This page intentionally left blank.
L-1
Solicitation No. 140R2025R0004, Folsom Right Wing Dam - North Fork Ditch Bypass Modification
American River Division, Folsom Unit – Central Valley Project, California
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED FEB 1998
BY REFERENCE
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The clauses in the table below are hereby incorporated by reference:
Provision Title Date
FAR 52.204-7 System for Award Maintenance NOV 2024
FAR 52.204-16 Commercial and Government Entity Code Reporting AUG 2020
FAR 52.204-22 Alternative Line Item Proposal JAN 2017
FAR 52.214-34 Submission of Offers in the English Language APR 1991
FAR 52.214-35 Submission of Offers In U.S. Currency APR 1991
FAR 52.215-1 Instructions to Offerors – Competitive Acquisition NOV 2021
FAR 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data
NOV 2021
FAR 52.225-10 Notice of Buy American Requirement-Construction Materials
MAY 2014
FAR 52.228-17 Individual Surety – Pledge of Assets (Bid Guarantee) FEB 2021
DIAR 1452.215-71 Use and Disclosure of Proposal Information APR 1984
FAR 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED AUG 1998
IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS,
FPMR PART 101-29
(a) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--
GSA Federal Supply Service
Specifications Section, Suite 8100
470 East L’Enfant Plaza SW https://www.acquisition.gov/browse/index/far (FAR 52.XXX-XX formatted clauses) https://www.acquisition.gov/diar (DIAR 1452.XXX-XX formatted clauses)
L-2
Washington, DC 20407
Telephone (202) 619-8925
Facsimile (202) 619-8978.
(b) If the General Services Administration, Department of Agriculture, or Department of
Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.
FAR 52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, JUL 2021
AND DATA ITEM DESCRIPTIONS LISTED IN THE
ACQUISITIONS STREAMLINING AND STANDARDIZATION
INFORMATION SYSTEM (ASSIST)
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST ( https://assist.dla.mil/online/start/);
(2) Quick Search ( http://quicksearch.dla.mil/).
(b) Documents not available from ASSIST may be ordered from the Department of Defense
Single Stock Point (DoDSSP) by—
(1) Using the ASSIST Shopping Wizard ( https://assist.dla.mil/wizard/index.cfm);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600
EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
(End of provision)
FAR 52.216-1 TYPE OF CONTRACT APR 1984
The Government contemplates award of a firm-fixed price contract resulting from this solicitation.
FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS- MAY 2014
SECONDARY SITE OF THE WORK
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
http://quicksearch.dla.mil/
L-3
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
FAR 52.222-23 NOTICE OF REQUIREMENTS FOR FEB 1999
AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY
FOR CONSTRUCTION
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action
Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the
Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each
Trade
Goals for Female Participation for Each
Trade
Sacramento County 16% 6.9 %
Placer County 16% 6.9%
These goals are applicable to all of the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance
Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in
41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action
Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order
L-4
11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for
Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $100,000 at any tie for construction work under the contract resulting from this solicitation. The notification shall list the -
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered areas" are both Sacramento and Placer Counties in California.
FAR 52.236-27 SITE VISIT (CONSTRUCTION) FEB 1995
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and
Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.
(b) A virtual site visit has been scheduled for:
January 23, 2025, Thursday @ 1:00 PM PST
Location: Online – Microsoft Live Event
The virtual pre-site visit conference requires registration in order to attend. Send registration requests to Contract Specialist, Ron Gamo at rgamo@usbr.gov and Sean Frische at sfrische@usbr.gov. Registration requests shall include names, email addresses and phone numbers for each registrant that will attend from each company/entity. Emailed invitations to the
Microsoft Live Event link will be provided to registrants prior to the virtual pre-site visit conference.
L-5
(c) An organized pre-proposal site visit has been scheduled for:
January 24, 2025, Friday @ 10:00 AM PST
Location: 7794 Folsom, CA 95630 (Details to be provided when registering)
Contractors, vendors, and visitors shall register to attend the onsite pre-proposal site visit by contacting Sean Frische at sfrische@usbr.gov and Contract Specialist, Ron Gamo, at rgamo@usbr.gov.
Safety Attire/PPE’s: Hard toed boots, long sleeve shirts and pants, hand sanitizer, personal drinking water/snacks, sunscreen and sunglasses recommended. Vehicles shall be suitable for gravel/dirt road with adequate ground clearance.
(a) Offerors are cautioned that, notwithstanding any remarks, clarifications, or responses provided at the conferences, all terms and conditions of the solicitation remain unchanged unless they are changed by written amendment. It is the responsibility of each offeror to seek clarification of any perceived ambiguity of documents within the solicitation prior to submitting a proposal.
(b) Offerors are expected to satisfy themselves regarding all conditions that may affect the work required or the cost of Contract performance. In no event shall failure to inspect the site constitute grounds for any protest or Contract claim.
FAR 52.236-28 PREPARATION OF PROPOSALS – OCT 1997
CONSTRUCTION
(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms; and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.
(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including-
(1) Lump sum price;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.
(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words "no proposal" in the space provided for any item on which no price is submitted.
(d) Alternate proposals will not be considered unless this solicitation authorizes their
L-6 submission.
FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISION NOV 2020
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.
(b) The use in this solicitation of any Department of the Interior or Bureau of Reclamation
Agency provisions with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
DIAR 1452.233-2 SERVICE OF PROTEST DEPARTMENT JUL 1996
OF THE INTERIOR (DEVIATION)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government
Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Abelardo Carlos Lopez, Contracting Officer
U.S. Bureau of Reclamation
2800 Cottage Way, Room E-1815
Sacramento, California 95825-1898
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor for Procurement and Patents, 1849 C Street, NW, Room 6511, Washington, D.C. 20240
L-7
WBR 1452.215-80 SOURCE SELECTION EVALUATION MAR 2021
PROCEDURES -BUREAU OF RECLAMATION
The Government intends to evaluate proposals submitted under this solicitation and select a source for contract award without discussions (unless the contracting officer later determines discussions to be necessary) in accordance with the following provision: FAR 52.215-1
Instructions to Offerors -- Competitive Acquisition (Jan 2017). Source selection shall be in accordance with procedures contained in FAR Part 15, Department of the Interior Acquisition
Regulation (DIAR) Part 1415 (48 CFR 1415) and Bureau of Reclamation Acquisition Regulation
WBR Part 1415. These procedures are summarized as follows:
(a) Technical evaluation. A Technical Proposal Evaluation Committee has been established to objectively evaluate technical proposals in accordance with the Evaluation Factors for Award --
Bureau of Reclamation provision of this solicitation. Technical proposals shall be submitted in accordance with the Proposal Instructions -- Bureau of Reclamation provision of this solicitation.
(b) Past performance evaluation. In addition to any other past performance information required under the solicitation, the contracting officer shall use past performance information available from the Contractor Performance Assessment Reporting System (CPARS) in the source selection process on offerors competing for awards in excess of the simplified acquisition threshold, unless the contracting officer has documented an exception from past performance consideration in accordance with FAR 15.304(c)(2)(iv).
(c) Cost or price evaluation. An objective cost or price evaluation of contract pricing proposals will be made in accordance with the Evaluation Factors for Award provision of this solicitation.
Pricing proposals shall be submitted in accordance with the Proposal Instructions -- Bureau of
Reclamation provision of this solicitation. A cost or price analysis will be performed to determine price reasonableness and any instances of unbalanced pricing, using one or more of the techniques at FAR 15.404-1.
WBR 1452.215-81 PROPOSAL INSTRUCTIONS MAR 2021
BUREAU OF RECLAMATION
This procurement will be conducted in accordance with FAR Part 15.
In addition to the requirements of the Instructions to Offerors - Competitive Acquisitions provision of this solicitation (see FAR 52.215-1), each offeror shall submit a proposal in accordance with the instructions contained in this provision.
(a) Use and Disclosure of Proposal Information. In accordance with the Use and Disclosure of
Proposal Information -- Department of the Interior provision of this solicitation (see DIAR
L-8
1452.215-71), offerors shall mark trade-secret or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3) contained in the proposal with the restrictive legend "Proprietary Information."
(b) Proposal Volumes. Offerors shall submit separate Volumes with the required number of copies as follows:
(1.) Separation of volumes. All hard copies of each proposal Volume (i.e., all copies of
Volume I) are to be packaged individually and clearly marked to identify contents. The exterior of each package containing proposals shall be marked with the solicitation number, and the time and date for receipt of proposals and the name and address of the offeror, in order to prevent mishandling.
(c) General Contents. Each separate proposal Volume shall:
(1) Be presented in a manner which allows it to “stand alone” without the need to reference other documents;
(2) Be a coherent document free of internal inconsistencies as well as inconsistencies with other volumes of the proposal;
(3) Conform to all solicitation provisions, clauses, or requirements;
(4) Address the submission requirements with specificity and detail where required;
(4) Be an orderly, specific, and complete document in every detail;
(6) Be logically presented, using clear and concise language so that it can be easily read and meaningfully evaluated by Reclamation personnel from a variety of different functional and technical disciplines;
Volume Title
I Business Proposal
(Representations, Certifications and Offer)
II
Technical Proposal/Past
Performance
III Pricing Proposal
L-9
(7) Have all pages in each volume consecutively numbered (including pages with tables and exhibits) and cross-referenced to other volumes where appropriate for each; and
(8) Indicate how the proposal conforms to the evaluation criteria identified in Section M.
(d) Format. To assist in the uniform evaluation of proposals, the following format shall be used in preparing each separate proposal Volume:
(1) Provide a Table of Contents which lists all sections specific to the proposal Volume;
(2) Cross-reference the work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in (d), Section M;
(3) Provide a list of any enclosures, including tables, drawings, charts, or other enclosures which summarize data or information;
(e) Volume I, Business Proposal. Volume I shall incorporate the other Volumes by reference but shall not physically include them. It shall consist of:
(1) A fully executed Solicitation, Offer, and Award form required by Part I, Section A of this solicitation. It shall be used as the cover sheet (or first page) of Volume I.
(2) Fully executed and completed offeror representations, certifications, and acknowledgments required by Part IV, Section K of this solicitation;
(3) Additional information required by the solicitation to be furnished by the offeror which is not required to be obtained in another volume of the proposal;
(4) Make-or-buy program (if applicable);
(5) Requests for any waivers of any solicitation provisions or contract clauses; and
(6) A summary of any exemptions from, or deviations to, any other solicitation requirements.
(7) Subcontracting Plan (Section J_ Attachment 07), completed by the Offeror in its entirety.
Offerors are responsible for providing all supporting documents to their completed
Subcontracting Plan.
(f) Volume II, Technical Proposal/Past Performance
(1)Technical Proposal. The technical proposal should convincingly describe the capability of the offeror's organization to participate in this project and effectively demonstrate a thorough understanding of the work statement contained in Part I, Section C of this solicitation. To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the technical proposal:
L-10
(a) Table of Contents. The Table of Contents shall list all sections of the technical proposal. Any future amendments, additions and/or revisions to the proposal shall be included in an updated Table of Contents;
(b) Index. The Index section shall cross reference the statement of work, specifications, or performance work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in (d), Section M;
(c) Enclosures. The Enclosures Section shall include a list of any tables, drawings, charts, and any other enclosures which summarize data or information;
(d) Executive Summary. The Executive Summary shall include a brief discussion of how the required work will be performed and important highlights of the proposal.
(e) There are two (2) technical (non-price) factors and a past performance (non-price) factor that will be evaluated in accordance with the criteria contained in Section M of this solicitation:
1.Technical Approach
Factor 1A: Coordinated Construction Schedule and Sequence
Factor 1B: Experience
2.Past Performance
Evaluation Factor 1 - Technical Approach: The Technical Approach Contents shall include a construction schedule, a corresponding written narrative of the planned construction sequence. Both shall be coordinated, support each other, and reflect the requirements contained in the Limitation of Funds Clause (if applicable), Specification Sections C, F, and
H.
1a) Factor 1A: Coordinated Construction Schedule and Sequence: The construction schedule shall include:
a) Contents:
1. A Gantt chart schedule.
2. Schedule Organization Statement.
3. Description of the work-breakdown-structure categories used to organize the schedule.
L-11
4. Any other pertinent information that will facilitate a more efficient review and provide a better understanding of the schedule’s organization.
b) Content format:
1. A Gantt chart schedule that includes such detail to show the sequencing of the principal and critical components of work contained in the solicitation; in addition, any other activities or information needed to accurately portray the offeror’s proposed schedule shall be included. The schedule shall include critical submittals allowing for submittal preparation time and associated Government reviews/approvals. The contractor shall assume a Notice to Proceed (NTP) date of (90 days from the date offers are due.
This NTP date shall be used for solicitation/evaluation purposes only). A final NTP shall be issued to the awardee after award for development of the schedule. In addition, the contractor shall clearly indicate their assumptions in development of the schedule in relation to the specification work restriction requirements, weather delays, or any other environmental considerations that may impact the schedule.
a. Format: The Gantt chart schedule shall be formatted so that it can be printable on
11x17 sized paper (one sided) and have columns that display the following information in the following order: activity ID and name, planned duration, calendar ID, early start, late start, early finish, late finish, and total float. The schedule shall meet the requirements of specification section 01 32 10 – Part 1.07.A, Schedules. The schedule shall be in format compatible with Primavera Professional Project Management.
Include electronic copies of the “.xer” schedule data file and the “.plf” schedule layout file in accordance with the Instructions to Offerors in the solicitation.
2. Schedule Organization Statement: To help facilitate a more efficient and consistent
Government review, provide a brief statement that describes how the schedule was organized and summarizes the following information:
a) A listing of the site-specific calendar names and function of the calendars (i.e. 5 day with holiday, 7 day, etc.). List any assumptions used in developing the calendars. The listing of site-specific calendar names and function of calendars and assumptions used in developing calendars shall not exceed 2 pages as defined in part C of this provision.
3. Description of the work-breakdown-structure categories used to organize the Schedule format. The description of the work-breakdown-structure categories used to organize the schedule shall not exceed 2 pages as defined in part C of this provision.
4. Additional pertinent information statement format. The format for any other pertinent information that will facilitate a more efficient review and provide a better understanding of the schedule’s organization. The information included to facilitate a more efficient review and better understanding of the schedule’s organization shall not exceed 2 pages
L-12 as defined in part C of this provision.
1b) Factor 1B: Experience: The Narrative of Construction Experience shall not exceed 30 pages (double sided) as defined in part C of this provision. Provide a list of projects similar in scope and magnitude to the work required under this solicitation which the offeror has completed during the past 10 years. Provide the following information for each principle and critical work component listed below:
a) Contents:
1. Contractor(s) and/or subcontractor(s) responsible for the component of work.
2. Equipment types including capacities, sizes, and assumed production rates.
3. Planned shifts, crew sizes, and assumed production rates.
a) Within the narrative, this listing of assumed production rates shall correlate with the schedule by referencing activity identifications (IDs) and activity description of key items of work.
Important Note: Design and supplier information and ultimate acceptance of the offer shall not relieve the offeror from complying with the requirements of the specifications.
4. On-site work: Provide concept level details for:
a) Mobilization and preparatory work.
b) Clearing, grubbing, and topsoil removal.
c) Fencing removal and installation.
d) Establishing site access and installing security measures.
e) Installing and operating temporary unwatering and dewatering systems.
f) Supported excavation to expose abandoned concrete headwall and portions of three abandoned CMP conduits.
g) Removing concrete headwall and downstream end of the abandoned CMP conduits.
h) Installing a filter and drain, replacing a segment of toe drain pipe.
i) Placing and compacting embankment to create a seepage stability berm.
L-13
j) Installing toe drain inspection wells and toe drain pipe cleanouts.
k) Installing gravel surfacing.
l) Installing utilities and instrumentation.
m) Replacing topsoil and seeding.
5. Fabrication and procurement of equipment and materials: Provide concept level details for:
a) Critical long lead time equipment and materials.
b) Planned off-site fabrication and delivery of pre-cast concrete features.
c) Planned on-site subassembly work.
d) Planned assembly and fusion of pipe and drain materials.
6. Environmental Compliance: Provide concept level details for:
a) Storm Water Protection Site compliance.
b) Sources of Temporary Utilities (Power, Water & Communications); and
c) Water Control during excavation from unwatering and dewatering activities.
EVALUATION FACTOR 2 - Past Performance: Provide a list of projects similar in scope and magnitude to the work required under this solicitation which the offeror has completed during the past 6 years. For each project, include:
1. Name of Project to include contract number, date and type
2. Description of contract/projects similar to this solicitation shall be submitted to demonstrate experience. State if the project involved similar shored excavations, dewatering, manhole placements, and zoned embankment fill as applicable to this solicitation.
3. Contract/Projects shall have a minimum of $2,000,000 contract price.
4. Any problems encountered in performance of the work and documented corrective action(s) taken.
5. Each project submitted shall have the following information which will be evaluated for recent and relevant past performance associated with this solicitation:
L-14
a. Title
b. Customer
c. Customer Contact Information
d. Description of Project/Contract
e. Contract/Project Duration
f. Contract/Project Cost
6. If an Offeror has no relevant past performance, the Offeror shall state in their proposal that it possesses no relevant, directly related, or similar past performance.
7. Point of contact information must include the name, address and phone number(s) of the acquiring Government agency or commercial customer.
a. Name(s) and telephone number(s) of references from the acquiring agency or customer who may be contacted for further information.
b. Offerors are requested to provide a blank copy of the Past Performance
Questionnaire (PPQ) attached to this solicitation (see Section J, Attachments) to
Offeror’s references. The PPQ contains instructions for completing the form and for Offeror’s references to forward the completed forms to the contract specialist and contracting officer. The Government is not responsible for ensuring the receipt of PPQs from the Offeror’s references; it is the Offeror’s responsibility to follow-up with reference submissions.
c. Government evaluators will also query the CPARS database and any recent, relevant reports found will be used to evaluate the Offeror’s past performance.
Offerors with no recent, relevant past performance will receive a neutral evaluation rating.
8. Initial and final contract amounts.
EVALUATION FACTOR 3 – Price: Provide cost data as required in accordance with WBR
1452.215-83, Pricing Instructions – Bureau of Reclamation, JAN 1998. Offerors are hereby notified that even if cost or pricing data are not initially requested in this solicitation, the
Contracting Officer reserves the right to request such data if they are later found necessary pursuant to FAR 15.403-5(a)(1).
(g) Volume III, Pricing Proposal Offerors are hereby notified that even if cost or pricing data are not initially requested in this solicitation, the Contracting Officer reserves the right to request such data if they are later found necessary pursuant to
FAR 15.403-5(a)(1).
L-15
To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the pricing proposal:
(1) Table of contents. The Table of Contents shall list all sections of the pricing proposal. Any modifications or revisions to the proposal, up to the date of agreement on price, shall include an updated Table of Contents;
(2) Index. The index shall cross reference the work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in Part IV, Section M of this solicitation;
(3) Enclosures. A list shall be included of all enclosures, attachments, tables, drawings, charts, and any other material which summarize data or information contained or referenced in the pricing proposal;
(4) The price proposal should be consistent with the technical approach(es) proposed in the technical proposal, Volume II;
(5) Pricing proposal breakdown. The offeror shall submit Section B of the contract
Schedule (Schedule of Supplies and Services, found in Part I of this solicitation), including any attached Price Schedules noted in Section B, with its proposed total prices/costs for each contract line item number (CLIN), including any options, and proposed unit price(s), if required. In addition, a total proposed price consisting of the sum of all contract line items (excluding options) shall be submitted.
The offeror shall submit Section B of the contract Schedule (Schedule of
Supplies and Services, found in Part I of this solicitation), including any attached Price Schedules noted in Section B, with its proposed total prices/costs for each contract line item number (CLIN), including any options, and proposed unit price(s), if required. In addition, a total proposed price consisting of the sum of all contract line items (excluding options) shall be submitted.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .