Attachment_13_-_In_Person_Site_Visit_Agenda_0001.pdf
PDF 162 KB Posted
- Attached to
- Folsom Right Wing Dam Ditch Bypass Modifications
- Solicitation number
- 140R2025R0004
About this file
This is a site visit agenda for an in-person meeting regarding the Folsom Right Wing Dam - North Fork Ditch Bypass Modifications project (Solicitation No. 140R2025R0004) scheduled for January 24, 2025. The Bureau of Reclamation project is a total small business set-aside with an estimated cost between $5-10 million, to be awarded as a firm-fixed-price construction contract.
The project involves modifications at multiple work areas including the North Fork Ditch Construction Area, Right Wing Dam (RWD) Toe Drain Construction Area, and Left Wing Dam (LWD) Toe Drain Construction Area. Key components include mobilization, clearing and grubbing, fencing work, dewatering systems, excavation of abandoned structures, installing filters and drainage zones, creating a seepage stability berm, and installing toe drain inspection wells. Critical dates include a question submission deadline of January 28, 2025, and proposal due date of February 12, 2025. The contractor must begin work within 7 days of notice to proceed and complete within 372 calendar days, with liquidated damages of $2,000 per day for delays. Onsite work at the toe of RWD and LWD cannot begin before August 1st or after November 1st without approval. Davis-Bacon wage rates apply, and the government intends to award without discussions.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Folsom Right Wing Dam – North Fork Ditch Bypass Modifications
Solicitation No. 140R2025R0004
January 24, 2025, at 10:00 AM PST
AGENDA
I. Introductions:
Reclamation, California Great Basin (CGB) Regional Office
Ron Gamo, Contracting Specialist, rgamo@usbr.gov
Reclamation, Regional Construction Office (RCO):
Sean Frische, Field Engineer, Contracting Officer Representative
Reclamation, Denver Technical Support Center (TSC)
Mehdi Khan, Civil Engineer, Geotechnical Design
II. Communication Protocol:
All questions shall be emailed to the following individuals:
Ron Gamo (rgamo@usbr.gov )
Abelardo (Carlos) Lopez, (aclopez@usbr.gov )
ALL QUESTIONS WILL BE ASKED IN WRITING AND WILL BE ANSWERED
IN WRITING IN ORDER FOR IT TO BE INCORPORATED IN THE CONTRACT.
NOTHING STATED OTHERWISE WILL BECOME PART OF THE CONTRACT.
The cut-off date and time for submittal of questions is January 28, 2025, Tuesday at 5:00 PM
PST. Any questions received after this time may not be responded to and therefore not included in the amendment.
The proposal due date is on February 12, 2025, Wednesday at 5:00 PM therefore it is imperative to submit all questions in writing as soon as practicable.
SF 1442:
The estimated cost of this project is between $5,000,000 and $10,000,000. This requirement is a Total Small Business set aside. The Government contemplates award of this requirement as a firm fixed price construction contract resulting from this solicitation.
III. Project Description:
SECTION C – Specifications
Attachments 1-3 (Specifications and Drawings) are available via Kiteworks, To obtain these files, please send me an email to request for access.
The omission of discussing solicitation items/issues does not diminish their importance.
Summary of Work Areas:
A. NFD Construction Area – dewater, install temp bypass, excavate, cut conduits, install filter and berm, restore site.
Attachment 13 - In Person Site Visit Agenda mailto:rgamo@usbr.gov mailto:aclopez@usbr.gov
January 24, 2025, at 10:00 AM PST
B. RWD Toe Drain Construction Area – excavate and install toe drain cleanout.
C. RWD Toe Drain Construction Area – excavate and install toe drain inspection well manhole.
D. LWD Toe Drain Construction Area – excavate and locate toe drain, install toe drain cleanout and inspection well manhole.
Principal Components of Work:
A. Mobilization and preparatory work
B. Clearing, grubbing, and topsoil removal
C. Fencing removal and installation
D. Establishing site access and installing security measures
E. Installing and operating temporary unwatering and dewatering systems
F. Supported excavation to expose abandoned concrete headwall and portions of three abandoned corrugated metal pipe (CMP) conduits
G. Removing concrete headwall and downstream end of the abandoned corrugated metal pipe (CMP) conduits
H. Installing a filter and drainage zones, backfilling the excavation, and replacing a segment of toe drain pipe.
I. Placing and compacting embankment to create a seepage stability berm.
J. Installing toe drain inspection wells and toe drain pipe cleanouts
K. Installing gravel surfacing.
L. Installing utilities and instrumentation.
M. Replacing topsoil and seeding
Other Items to Consider:
• Site Security Requirements
• Onsite work at toe of RWD and LWD cannot begin before August 1st, and excavation shall not begin after November 1 without approval from the COR
IV. SECTIONS F, I, J, L, M:
SECTION F - Commencement, Prosecution, and Completion of Work:
The solicitation currently states to start work within 7 calendar days of notice to proceed (NTP) and complete entire work ready for use not later than 372 calendar days after NTP.
Liquidated Damages: If the Contractor fails to complete the work within time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of
$2,000.00 for each calendar day of delay until the work is completed or accepted.
SECTION I – Contract Clauses: Note that many clauses are only incorporated by reference, with the same force and effect as if they were given in full text. The full texts of clauses are available by accessing appropriate websites listed in Section I.
SECTION J - List of Documents, Exhibits and Other Attachments: Davis-Bacon Wage Rates apply to this project.
SECTION L - Instructions, Conditions and Notices to Bidders
PLEASE NOTE AND COMPLY WITH ALL INSTRUCTIONS OR YOUR PROPOSAL MAY BE
DEEMED NON-RESPONSIVE. IT IS THE GOVERNMENT’S INTENTION TO AWARD
WITHOUT DISCUSSIONS.
SECTION M - Evaluation Factors for Award
PLEASE NOTE ALL PROPOSAL EVALUATION FACTORS. FAILURE TO ADDRESS EACH
FACTOR/SUBFACTOR EXPLICITLY MAY RESULT IN A PROPOSAL THAT APPEARS SUB-
STANDARD AND/OR NON-RESPONSIVE. IT IS THE GOVERNMENT’S INTENTION TO
AWARD WITHOUT DISCUSSIONS.
V. Safety
• Review Site Specific Job Hazard Analysis
• Appropriate PPE: safety footwear, hard hat and high visibility vest