This is Amendment 0002 to solicitation 140R2025R0004 for the Folsom Right Wing Dam - North Fork Ditch Bypass Modification project, issued by the Bureau of Reclamation's Mid-Pacific Region on January 13, 2025. The amendment incorporates several changes including answers to offeror questions, revised Section B (Supplies/Services and Prices/Costs), revised Section L (Instructions to Offerors), and updates to multiple technical specifications including Use of Site, Work Restrictions, Submittals, Site Security, Secondary Entrance, Excavation, Zone 5 Slope Protection, Restoration/Revegetation, Concrete Vehicle Barrier, Toe Drains, and Optical Fiber Communications specifications. Additionally, five drawings are being replaced with revised versions (485-D-60863, 485-D-60864, 485-D-60925, 485-D-60926, and 485-D-60876).
The period of performance for this project is April 25, 2025 to April 30, 2026. The amendment modifies the original solicitation but does not extend the proposal due date. Offerors must acknowledge receipt of this amendment prior to the proposal due date using one of three methods: completing Items 8 and 15, acknowledging receipt on each copy of their offer, or via separate written communication referencing the solicitation and amendment numbers.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2025R0004 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
01/13/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/13/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: Folsom Right Wing Dam ¿ North Fork Ditch Bypass Modification
B. PURPOSE: The purpose of this amendment is to incorporate various changes to solicitation documents
C. DESCRIPTION: Amendment 0002 Description of Changes:
1.) Offeror¿s Questions and Answers
2.) Revised Section B ¿ Supplies or Services and Prices/Costs
3.) Revised Section L ¿ Instruction, Conditions and Notices to Offerors
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Abelardo Lopez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2025R0004/0002
4.) Revised Section C ¿ Specifications and
Drawings
Remove Specification 01 14 10 ¿ Use of Site and replace with Specification 01 14 10 ¿ Use of
Site, Amendment 0002.
Remove Specification 01 14 12 ¿ Work Restrictions and replace with Specification 01 14 12 ¿ Work
Restrictions, Amendment 0002.
Remove Specification 01 33 00 ¿ Submittals and replace with Specification 01 33 00 ¿ Submittals, Amendment 0002.
Remove Specification 01 35 50 ¿ Site Security and replace with Specification 01 35 50 ¿ Site
Security, Amendment 0002.
Remove Specification 31 23 22 ¿ Secondary
Entrance and replace with Specification 31 23 22
¿ Secondary Entrance, Amendment 0002.
Remove Specification 31 23 30 ¿ Excavation and replace with Specification 31 23 30 ¿ Excavation, Amendment 0002.
Remove Specification 31 24 54 ¿ Zone 5, Slope
Protection and replace with Specification 31 24
54 ¿ Zone 5, Slope Protection, Amendment 0002.
Remove Specification 32 30 10 ¿ Restoration and
Revegetation and replace with Specification 32 30
10 ¿ Restoration and Revegetation, Amendment 0002.
Remove Specification 32 31 17 ¿ Concrete Vehicle
Barrier and replace with Specification 32 31 17 ¿
Concrete Vehicle Barrier, Amendment 0002.
Remove Specification 36 46 46 ¿ Toe Drains and replace with Specification 36 46 46 ¿ Toe Drains, Amendment 0002.
Remove Specification 33 82 23 ¿ Optical Fiber
Communications Transmissions and Distribution
Cabling and replace with Specification 33 82 23 ¿
Optical Fiber Communications Transmissions and
Distribution Cabling, Amendment 0002.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2025R0004/0002
5.) Remove and replace the following Drawings:
Remove Drawing 485-D-60863 and replace with
Drawing 485-D-60863 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60864 and replace with
Drawing 485-D-60864 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60925 and replace with
Drawing 485-D-60925 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60926 and replace with
Drawing 485-D-60926 rev. 1 - Amendment 0002.
Remove Drawing 485-D-60876 and replace with
Drawing 485-D-60876 rev. 1 - Amendment 0002.
Period of Performance: 04/25/2025 to 04/30/2026