Folsom Right Wing Dam - North Fork Ditch Bypass

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
140R2025R0004
Agency
Bureau of Reclamation Department of the Interior
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z1KA Maintenance Of Dams
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Reclamation's Region 10 California-Great Basin office is seeking a firm fixed-price construction contract for the Folsom Right Wing Dam - North Fork Ditch Bypass Modification project located 2 miles north of Folsom, California. The procurement will be issued as a Request for Proposal (RFP) under FAR Part 15, utilizing a lowest price technically acceptable source selection methodology. Principal work components include mobilization, site preparation, fencing, dewatering systems, excavation of abandoned concrete headwall and pipe conduits, installation of drainage zones and toe drain pipes, embankment construction, utilities installation, and site restoration. Contractors must be actively registered in the System for Award Management (SAM) to be eligible for award. The solicitation (140R2025R0004) will be posted on SAM.gov around January 3, 2025, with proposals due February 3, 2025.

The contract is set aside for small businesses under NAICS code 237990, which has a $45 million size standard. The project is estimated between $5-10 million in total value and will require 100% performance and payment bonds. Contractors will need to demonstrate capability in heavy and civil engineering construction, specifically in dam maintenance and modification work. The project's primary objective is to improve seepage stability and modify the existing dam infrastructure through comprehensive civil engineering techniques. Successful bidders will need to demonstrate technical competence in complex infrastructure modification, with a specific focus on hydraulic and structural engineering capabilities in dam-related construction projects.

Notice text

The purpose of this amendment is to correct the name of the attachment of the solicitation to 140R2025R0004.

Attachments

Files attached to this notice, newest first
File Type Posted
C02__01__140R2025R0004_Pre-Solicitation_Notice_2.pdf PDF
C02__01__140R2025R0020_Pre-Solicitation_Notice_1.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
This requirement involves removing existing conduit; removing concrete headwall, adding a seepage stability berm, and installing toe drain inspection wells. Award Award Notice
Folsom Right Wing Dam Ditch Bypass Modifications Latest solicitation Solicitation
Folsom Right Wing Dam - North Fork Ditch Bypass This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity