Final RFP- SpectRE- Amendment 5
Closed Solicitation Posted
- Solicitation number
- 80HQTR20R0011
- Agency
- Headquarters National Aeronautics and Space Administration
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541330 Engineering Services
Notice details come from SAM.gov. Updated .
About this opportunity
The National Aeronautics and Space Administration Headquarters issued a final request for proposal seeking spectrum and resources management, engineering, and programmatic support services to support the Space Communication and Navigation Division. Offerors must have expertise in areas such as domestic and international spectrum management, programmatic resources and business management, program website and system support, and administrative functions. Proposals will be evaluated based on mission suitability, past performance, and price, with the award being a single-award indefinite delivery indefinite quantity contract. The proposal deadline is March 26, 2020, with questions due by March 11, 2020.
The solicitation is set aside for small businesses with a size standard of $16.5 million. The NAICS code is 541330 for engineering services and the potential PSC codes include R499 for other professional, administrative, and management support services. The current incumbent was not named. The potential award value is between $500,000 to $68 million over five years. The period of performance will be 18 months for individual task orders, with work to be performed at NASA Headquarters and various contractor facilities.
Notice text
8 versions
Update #8 · Latest ·
2020.04.09- Amendment 5 revised exhibit 1A
Set 4 of Questions and Answers are posted.
The purpose of Amendment 5 is to revise exhibit 1A to include the chart for "Offeror Management and Administrative Labor Categories and/or Labor-oriented Recurring
Other Direct Costs (ODCs)/Cost Estimating Relationships (CERs)".
A. RFP updates are highlighted in thefollowing sections:
GPM Exhibit 1A
Special Notice:
Offerors only have a 7 day window to submit their proposal once an invite is received to access
the Large File Transfer (LFT) system. Therefore, when a contractor requests a LFT invitation
email, I will send a final invite to everyone on April 9th to reset your submission timeline.
Submission deadline is April 15th at 12:00PM. Proposal information that is upload will have a
date to verify submission date. Our language in the Proposal Delivery provision is still accurate.
The CO has 7 days after submission to download the secure files prior to the proposals. Notify
the CO via email at Andrea.MT.Ross@nasa.gov after you have submitted all four Proposal
Volumes, denoting the names of each volume sent.
Contact me if you have any issues with the LFT by April 14, 2020 to ensure submission.
****
2020.04.01- Amendment 4 extension to 4.15.2020
Set 3 of Questions and Answers are posted.
The purpose of Amendment 4 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
- L.12 Proposal Marking and Delivery
- L.14 (b)(2) Direct Labor Rates, Indirect Rates Profit and Fee Matrices
- Attachment B- IDIQ Rate Matrix
- Attachment E- DD254- Secret Clearance
- Attachment E1- DD254 Top Secret Clearance
- Enclosure 1- RTO1
- Enclosure 1a- RTO2
- Enclosure 3- GPM Specified Non-Mgmt DL Categories, Hrs and RDs
- GPM Exhibits
B. Attached is a conformed RFP and cover letter, as well as revised Enclosure 1,1a, 3 and GPM exhibits incorporating the necessary Amendment 4 updates.
***
2020.03.25- Special Notice Regarding Amendment 4
The Government will release with the next Amendment for SpectRE Solicitation 80HQTR20R0011 revisions to the RTOs and provide the additional Questions and Answers.
***
2020.03.20 Amendment 3- SpectRE RFP
Set 2 of Questions and Answers are posted.
The purpose of Amendment 3 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
K.1 52.204-8 Annual Representations andCertifications
L.10 GSFC 52.215-201 Proposal Preparation—General Instructions
L.12 Proposal Marking and Delivery
L.13(c) B.1 Subfactor B- Representative Task Order (RTO) Technical Approach
L.13(c) C.10 Subfactor C- Management Approach paragraph 4; and
L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. Attached is a conformed RFP, which incorporates Amendment 3 updates.
****
2020.03.18 Amendment 2- SpectRE RFP extension to 4.9.2020
The purpose of Amendment 2 is to extend the SpectRE solicitation 80HQTR20R0011 proposal deadline from March 26, 2020 to April 9, 2020.
Please be advise the Government will release with the next Amendment electronic proposal submission instructions for Solicitation 80HQTR20R0011 SpectRE Requirement.
***
2020.03.10 Amendment 1- SpectRE RFP
Set 1 of Questions and Answers are posted.
The purpose of Amendment 1 is to incorporate a conformed Final Request for Proposal (RFP) revision and update Exhibits under the SpectRE solicitation .
A. RFP updates are at sections: L.13(c) Subfactor A- Technical Approach; L.14 (b)(2) Attachment B- Direct Labor rates, Indirect Rates, Profit and Fee Matrices; and L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. RFP Exhibits are updated to include 1A-11A in addition to 11B. The revised exhibits are posted as "2020.03.02 Exhibits- GPM Exhibits 1-11B All IDIQ by CY."
C. Attached is a conformed RFP, which incorporates Amendment 1 updates.
***
2020.02.25 Final RFP
See attachments for solicitation. Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Update #7 ·
2020.04.09- Amendment 5 revised exhibit 1A
Set 4 of Questions and Answers are posted.
The purpose of Amendment 5 is to revise exhibit 1A to include the chart for "Offeror Management and Administrative Labor Categories and/or Labor-oriented Recurring
Other Direct Costs (ODCs)/Cost Estimating Relationships (CERs)".
A. RFP updates are highlighted in thefollowing sections:
GPM Exhibit 1A
Special Notice:
Offerors only have a 7 day window to submit their proposal once an invite is received to access
the Large File Transfer (LFT) system. Therefore, when a contractor requests a LFT invitation
email, I will send a final invite to everyone on April 9th to reset your submission timeline.
Submission deadline is April 15th at 12:00PM. Proposal information that is upload will have a
date to verify submission date. Our language in the Proposal Delivery provision is still accurate.
The CO has 7 days after submission to download the secure files prior to the proposals. Notify
the CO via email at Andrea.MT.Ross@nasa.gov after you have submitted all four Proposal
Volumes, denoting the names of each volume sent.
Contact me if you have any issues with the LFT by February 14, 2020 to ensure submission.
****
2020.04.01- Amendment 4 extension to 4.15.2020
Set 3 of Questions and Answers are posted.
The purpose of Amendment 4 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
- L.12 Proposal Marking and Delivery
- L.14 (b)(2) Direct Labor Rates, Indirect Rates Profit and Fee Matrices
- Attachment B- IDIQ Rate Matrix
- Attachment E- DD254- Secret Clearance
- Attachment E1- DD254 Top Secret Clearance
- Enclosure 1- RTO1
- Enclosure 1a- RTO2
- Enclosure 3- GPM Specified Non-Mgmt DL Categories, Hrs and RDs
- GPM Exhibits
B. Attached is a conformed RFP and cover letter, as well as revised Enclosure 1,1a, 3 and GPM exhibits incorporating the necessary Amendment 4 updates.
***
2020.03.25- Special Notice Regarding Amendment 4
The Government will release with the next Amendment for SpectRE Solicitation 80HQTR20R0011 revisions to the RTOs and provide the additional Questions and Answers.
***
2020.03.20 Amendment 3- SpectRE RFP
Set 2 of Questions and Answers are posted.
The purpose of Amendment 3 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
K.1 52.204-8 Annual Representations andCertifications
L.10 GSFC 52.215-201 Proposal Preparation—General Instructions
L.12 Proposal Marking and Delivery
L.13(c) B.1 Subfactor B- Representative Task Order (RTO) Technical Approach
L.13(c) C.10 Subfactor C- Management Approach paragraph 4; and
L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. Attached is a conformed RFP, which incorporates Amendment 3 updates.
****
2020.03.18 Amendment 2- SpectRE RFP extension to 4.9.2020
The purpose of Amendment 2 is to extend the SpectRE solicitation 80HQTR20R0011 proposal deadline from March 26, 2020 to April 9, 2020.
Please be advise the Government will release with the next Amendment electronic proposal submission instructions for Solicitation 80HQTR20R0011 SpectRE Requirement.
***
2020.03.10 Amendment 1- SpectRE RFP
Set 1 of Questions and Answers are posted.
The purpose of Amendment 1 is to incorporate a conformed Final Request for Proposal (RFP) revision and update Exhibits under the SpectRE solicitation .
A. RFP updates are at sections: L.13(c) Subfactor A- Technical Approach; L.14 (b)(2) Attachment B- Direct Labor rates, Indirect Rates, Profit and Fee Matrices; and L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. RFP Exhibits are updated to include 1A-11A in addition to 11B. The revised exhibits are posted as "2020.03.02 Exhibits- GPM Exhibits 1-11B All IDIQ by CY."
C. Attached is a conformed RFP, which incorporates Amendment 1 updates.
***
2020.02.25 Final RFP
See attachments for solicitation. Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Update #6 ·
2020.04.01- Amendment 4 extension to 4.15.2020
Set 3 of Questions and Answers are posted.
The purpose of Amendment 4 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
- L.12 Proposal Marking and Delivery
- L.14 (b)(2) Direct Labor Rates, Indirect Rates Profit and Fee Matrices
- Attachment B- IDIQ Rate Matrix
- Attachment E- DD254- Secret Clearance
- Attachment E1- DD254 Top Secret Clearance
- Enclosure 1- RTO1
- Enclosure 1a- RTO2
- Enclosure 3- GPM Specified Non-Mgmt DL Categories, Hrs and RDs
- GPM Exhibits
B. Attached is a conformed RFP and cover letter, as well as revised Enclosure 1,1a, 3 and GPM exhibits incorporating the necessary Amendment 4 updates.
***
2020.03.25- Special Notice Regarding Amendment 4
The Government will release with the next Amendment for SpectRE Solicitation 80HQTR20R0011 revisions to the RTOs and provide the additional Questions and Answers.
***
2020.03.20 Amendment 3- SpectRE RFP
Set 2 of Questions and Answers are posted.
The purpose of Amendment 3 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
K.1 52.204-8 Annual Representations andCertifications
L.10 GSFC 52.215-201 Proposal Preparation—General Instructions
L.12 Proposal Marking and Delivery
L.13(c) B.1 Subfactor B- Representative Task Order (RTO) Technical Approach
L.13(c) C.10 Subfactor C- Management Approach paragraph 4; and
L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. Attached is a conformed RFP, which incorporates Amendment 3 updates.
****
2020.03.18 Amendment 2- SpectRE RFP extension to 4.9.2020
The purpose of Amendment 2 is to extend the SpectRE solicitation 80HQTR20R0011 proposal deadline from March 26, 2020 to April 9, 2020.
Please be advise the Government will release with the next Amendment electronic proposal submission instructions for Solicitation 80HQTR20R0011 SpectRE Requirement.
***
2020.03.10 Amendment 1- SpectRE RFP
Set 1 of Questions and Answers are posted.
The purpose of Amendment 1 is to incorporate a conformed Final Request for Proposal (RFP) revision and update Exhibits under the SpectRE solicitation .
A. RFP updates are at sections: L.13(c) Subfactor A- Technical Approach; L.14 (b)(2) Attachment B- Direct Labor rates, Indirect Rates, Profit and Fee Matrices; and L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. RFP Exhibits are updated to include 1A-11A in addition to 11B. The revised exhibits are posted as "2020.03.02 Exhibits- GPM Exhibits 1-11B All IDIQ by CY."
C. Attached is a conformed RFP, which incorporates Amendment 1 updates.
***
2020.02.25 Final RFP
See attachments for solicitation. Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Update #5 ·
2020.03.25- Special Notice Regarding Amendment 4
The Government will release with the next Amendment for SpectRE Solicitation 80HQTR20R0011 revisions to the RTOs and provide the additional Questions and Answers.
***
2020.03.20
Amendment 3- SpectRE RFP
Set 2 of Questions and Answers are posted.
The purpose of Amendment 3 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
K.1 52.204-8 Annual Representations andCertifications
L.10 GSFC 52.215-201 Proposal Preparation—General Instructions
L.12 Proposal Marking and Delivery
L.13(c) B.1 Subfactor B- Representative Task Order (RTO) Technical Approach
L.13(c) C.10 Subfactor C- Management Approach paragraph 4; and
L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. Attached is a conformed RFP, which incorporates Amendment 3 updates.
****
2020.03.18
Amendment 2- SpectRE RFP
The purpose of Amendment 2 is to extend the SpectRE solicitation 80HQTR20R0011 proposal deadline from March 26, 2020 to April 9, 2020.
Please be advise the Government will release with the next Amendment electronic proposal submission instructions for Solicitation 80HQTR20R0011 SpectRE Requirement.
***
2020.03.10 Amendment 1- SpectRE RFP
Set 1 of Questions and Answers are posted.
The purpose of Amendment 1 is to incorporate a conformed Final Request for Proposal (RFP) revision and update Exhibits under the SpectRE solicitation .
A. RFP updates are at sections: L.13(c) Subfactor A- Technical Approach; L.14 (b)(2) Attachment B- Direct Labor rates, Indirect Rates, Profit and Fee Matrices; and L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. RFP Exhibits are updated to include 1A-11A in addition to 11B. The revised exhibits are posted as "2020.03.02 Exhibits- GPM Exhibits 1-11B All IDIQ by CY."
C. Attached is a conformed RFP, which incorporates Amendment 1 updates.
***
2020.02.25 Final RFP
See attachments for solicitation. Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Update #4 ·
2020.03.20
Amendment 3- SpectRE RFP
Set 2 of Questions and Answers are posted.
The purpose of Amendment 3 incorporates a conformed Final Request for Proposal (RFP) revisions.
A. RFP updates are in the following sections:
K.1 52.204-8 Annual Representations andCertifications
L.10 GSFC 52.215-201 Proposal Preparation—General Instructions
L.12 Proposal Marking and Delivery
L.13(c) B.1 Subfactor B- Representative Task Order (RTO) Technical Approach
L.13(c) C.10 Subfactor C- Management Approach paragraph 4; and
L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. Attached is a conformed RFP, which incorporates Amendment 3 updates.
*********************************************************************************************************************
2020.03.18
Amendment 2- SpectRE RFP
The purpose of Amendment 2 is to extend the SpectRE solicitation 80HQTR20R0011 proposal deadline from March 26, 2020 to April 9, 2020.
Please be advise the Government will release with the next Amendment electronic proposal submission instructions for Solicitation 80HQTR20R0011 SpectRE Requirement.
***************************************************************************************************************************
2020.03.10
Amendment 1- SpectRE RFP
Set 1 of Questions and Answers are posted.
The purpose of Amendment 1 is to incorporate a conformed Final Request for Proposal (RFP) revision and update Exhibits under the SpectRE solicitation .
A. RFP updates are at sections: L.13(c) Subfactor A- Technical Approach; L.14 (b)(2) Attachment B- Direct Labor rates, Indirect Rates, Profit and Fee Matrices; and L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. RFP Exhibits are updated to include 1A-11A in addition to 11B. The revised exhibits are posted as "2020.03.02 Exhibits- GPM Exhibits 1-11B All IDIQ by CY."
C. Attached is a conformed RFP, which incorporates Amendment 1 updates.
*******************************************************************************************
2020.02.25
Final RFP
See attachments for solicitation.
Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Update #3 ·
2020.03.18
Amendment 2- SpectRE RFP
The purpose of Amendment 2 is to extend the SpectRE solicitation 80HQTR20R0011 proposal deadline from March 26, 2020 to April 9, 2020.
Please be advise the Government will release with the next Amendment electronic proposal submission instructions for Solicitation 80HQTR20R0011 SpectRE Requirement.
***************************************************************************************************************************
2020.03.10
Amendment 1- SpectRE RFP
Set 1 of Questions and Answers are posted.
The purpose of Amendment 1 is to incorporate a conformed Final Request for Proposal (RFP) revision and update Exhibits under the SpectRE solicitation .
A. RFP updates are at sections: L.13(c) Subfactor A- Technical Approach; L.14 (b)(2) Attachment B- Direct Labor rates, Indirect Rates, Profit and Fee Matrices; and L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. RFP Exhibits are updated to include 1A-11A in addition to 11B. The revised exhibits are posted as "2020.03.02 Exhibits- GPM Exhibits 1-11B All IDIQ by CY."
C. Attached is a conformed RFP, which incorporates Amendment 1 updates.
*******************************************************************************************
2020.02.25
Final RFP
See attachments for solicitation.
Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Update #2 ·
2020.03.10
Amendment 1- SpectRE RFP
Set 1 of Questions and Answers are posted.
The purpose of Amendment 1 is to incorporate a conformed Final Request for Proposal (RFP) revision and update Exhibits under the SpectRE solicitation .
A. RFP updates are at sections: L.13(c) Subfactor A- Technical Approach; L.14 (b)(2) Attachment B- Direct Labor rates, Indirect Rates, Profit and Fee Matrices; and L.15(b) Prior Customer Evaluations (Past Performance Questionnaires).
B. RFP Exhibits are updated to include 1A-11A in addition to 11B. The revised exhibits are posted as "2020.03.02 Exhibits- GPM Exhibits 1-11B All IDIQ by CY."
C. Attached is a conformed RFP, which incorporates Amendment 1 updates.
*******************************************************************************************
2020.02.25
Final RFP
See attachments for solicitation.
Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Update #1 ·
SpectRE final RFP
See attachments for solicitation.
Proposal due date March 26, 2020 at 2pm EST
Questions dealine is March 11, 2020 due via email to Andrea.MT.Ross@nasa.gov
No PHONE Inquiries
Attachments
Show all 47
Notice history
| Notice | Type | Posted |
|---|---|---|
| Final RFP- SpectRE- Amendment 5 | Solicitation | |
| RFP- SpectRE | Special Notice | |
| Draft RFP- SpectRE | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity