Coconino NF Heritage Site Access Improvements

Closed Solicitation Posted

Solicitation number
127EAX21Q0041
Agency
Region 3 - Southwestern Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z1PC Maintenance Of Unimproved Real Property (Land)
Place of performance
Flagstaff, Arizona 86004, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks offers for construction services to improve access at two Coconino National Forest heritage sites located in Arizona. The U.S. Department of Agriculture Forest Service Southwestern Region is procuring site preparation and construction of walkways, viewing platforms, and concrete sidewalks. Evaluation will be based on a best value tradeoff of technical acceptability and price reasonableness. The response deadline is September 21, 2021.

This is a 100% small business set-aside for NAICS code 237990, with a size standard of $39.5 million. The place of performance is Flagstaff, Arizona. The estimated value is between $100,000 to $250,000, and Davis-Bacon wage rates apply. Offerors must register in SAM and submit payment protection in the form of an irrevocable letter of credit, bonds, or escrow equal to the total contract amount. Site visits were held on June 30, 2021 and pre-bid questions were due by July 20, 2021.

Notice text

7 versions

Update #7 · Latest ·

Construction – Coconino NF Heritage Site Access Improvements

Description:

This work includes preparing the site within the construction limits to construct a walkway and viewing platform at V Bar V following all applicable codes including but not limited to county and government agencies.  The work shall also include preparing the site at Elden Pueblo and construction of a concrete sidewalk. Optional items shall include site preparation, paving and striping of the parking lot at Elden Pueblo.  All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.

This work shall include all labor, material, and equipment necessary to grade and compact the trail bed as shown on drawings.  The finished surface grades for concrete sidewalk, parking area, trail, and platform shall comply with Forest Service accessibility requirements.

Additional improvements shall include but not limited to labor, material, and equipment necessary to complete construction staking (Walkway, Retaining Walls & Stairs), clearing and grubbing, subgrade preparation, riprap, retaining walls construction, drainpipe trenching and installation, rock stairs, relocate sign, steel pipe handrail and posts, split rail fence, seeding and mulching,  relocation of donation tube and building.

The site is located on the Red Rock Ranger District within the Coconino National Forests.

  • V Bar V Platform

           From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right               onto N Forest Ranger Road to parking lot located approximately 0.2 miles.

The site is located on the Flagstaff Ranger District within the Coconino National Forests.

  •  Elden Pueblo

            From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is              located on the north side of Highway 89.

Basis for Award:  The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Tradeoffs:  Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.

***A Site Visit is scheduled for June 30, 2021 at 9:00 am has been postponed and will be held on JULY 14, 2021 at 9:00am 

Location:

    Elden Pueblo

    From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is               located on the north side of Highway 89.

    Followed by

    V Bar V Platform

    From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right onto        N Forest Ranger Road to parking lot located approximately 0.2 miles.

Amendment I 

Amendment II

Amendment III

Amendment IV

Amendment V

This is a 100% Small Business Set-Aside.  The Small business Size Standard is 237990 – Other Heavy & Civil Engineering Construction 39.5M.

The magnitude of this project is between $100,000 and $250,000

Davis-Bacon wages apply.

The Contractor shall submit one of the following payment protections:

  • Irrevocable Letter of Credit
  • Payment and Performance Bonds
  • Escrow account equal to contract total

Contact:

Michelle Bahr

Contract Specialist

(928) 333-6278

michelle.l.bahr@usda.gov

The solicitation package, plans, and specifications will be made available on or after June 23, 2021, and will be posted at https://beta.sam.gov/

In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov

Offer Submissions: Offerors shall submit the Return Packet with the required information from Section M of the solicitation.  Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:  michelle.l.bahr@usda.gov before the deadline.

****The Deadline for receipt of responses to the RFQ shall be EXTENDED TO SEPT. 21, 2021 @ 4:00 PD

                               

                               

Update #6 ·

Construction – Coconino NF Heritage Site Access Improvements

Description:

This work includes preparing the site within the construction limits to construct a walkway and viewing platform at V Bar V following all applicable codes including but not limited to county and government agencies.  The work shall also include preparing the site at Elden Pueblo and construction of a concrete sidewalk. Optional items shall include site preparation, paving and striping of the parking lot at Elden Pueblo.  All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.

This work shall include all labor, material, and equipment necessary to grade and compact the trail bed as shown on drawings.  The finished surface grades for concrete sidewalk, parking area, trail, and platform shall comply with Forest Service accessibility requirements.

Additional improvements shall include but not limited to labor, material, and equipment necessary to complete construction staking (Walkway, Retaining Walls & Stairs), clearing and grubbing, subgrade preparation, riprap, retaining walls construction, drainpipe trenching and installation, rock stairs, relocate sign, steel pipe handrail and posts, split rail fence, seeding and mulching,  relocation of donation tube and building.

The site is located on the Red Rock Ranger District within the Coconino National Forests.

  • V Bar V Platform

           From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right               onto N Forest Ranger Road to parking lot located approximately 0.2 miles.

The site is located on the Flagstaff Ranger District within the Coconino National Forests.

  •  Elden Pueblo

            From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is              located on the north side of Highway 89.

Basis for Award:  The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Tradeoffs:  Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.

***A Site Visit is scheduled for June 30, 2021 at 9:00 am has been postponed and will be held on JULY 14, 2021 at 9:00am 

Location:

    Elden Pueblo

    From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is               located on the north side of Highway 89.

    Followed by

    V Bar V Platform

    From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right onto        N Forest Ranger Road to parking lot located approximately 0.2 miles.

Amendment I 

Amendment II

Amendment III

Amendment IV

This is a 100% Small Business Set-Aside.  The Small business Size Standard is 237990 – Other Heavy & Civil Engineering Construction 39.5M.

The magnitude of this project is between $100,000 and $250,000

Davis-Bacon wages apply.

The Contractor shall submit one of the following payment protections:

  • Irrevocable Letter of Credit
  • Payment and Performance Bonds
  • Escrow account equal to contract total

Contact:

Michelle Bahr

Contract Specialist

(928) 333-6278

michelle.l.bahr@usda.gov

The solicitation package, plans, and specifications will be made available on or after June 23, 2021, and will be posted at https://beta.sam.gov/

In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov

Offer Submissions: Offerors shall submit the Return Packet with the required information from Section M of the solicitation.  Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:  michelle.l.bahr@usda.gov before the deadline.

****The Deadline for receipt of responses to the RFQ shall be July 20, 2021 @ 4:00pm (Local)

                                Has been postponed to August 11, 2021 @ 4:00pm PD Has

                                 Extended to August 31, 2021 @ 4:00pm PD

Update #5 ·

Construction – Coconino NF Heritage Site Access Improvements

Description:

This work includes preparing the site within the construction limits to construct a walkway and viewing platform at V Bar V following all applicable codes including but not limited to county and government agencies.  The work shall also include preparing the site at Elden Pueblo and construction of a concrete sidewalk. Optional items shall include site preparation, paving and striping of the parking lot at Elden Pueblo.  All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.

This work shall include all labor, material, and equipment necessary to grade and compact the trail bed as shown on drawings.  The finished surface grades for concrete sidewalk, parking area, trail, and platform shall comply with Forest Service accessibility requirements.

Additional improvements shall include but not limited to labor, material, and equipment necessary to complete construction staking (Walkway, Retaining Walls & Stairs), clearing and grubbing, subgrade preparation, riprap, retaining walls construction, drainpipe trenching and installation, rock stairs, relocate sign, steel pipe handrail and posts, split rail fence, seeding and mulching,  relocation of donation tube and building.

The site is located on the Red Rock Ranger District within the Coconino National Forests.

  • V Bar V Platform

           From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right               onto N Forest Ranger Road to parking lot located approximately 0.2 miles.

The site is located on the Flagstaff Ranger District within the Coconino National Forests.

  •  Elden Pueblo

            From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is              located on the north side of Highway 89.

Basis for Award:  The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Tradeoffs:  Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.

***A Site Visit is scheduled for June 30, 2021 at 9:00 am has been postponed and will be held on JULY 14, 2021 at 9:00am 

Location:

    Elden Pueblo

    From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is               located on the north side of Highway 89.

    Followed by

    V Bar V Platform

    From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right onto        N Forest Ranger Road to parking lot located approximately 0.2 miles.

Amendment I 

Amendment II

Amendment III

This is a 100% Small Business Set-Aside.  The Small business Size Standard is 237990 – Other Heavy & Civil Engineering Construction 39.5M.

The magnitude of this project is between $100,000 and $250,000

Davis-Bacon wages apply.

The Contractor shall submit one of the following payment protections:

  • Irrevocable Letter of Credit
  • Payment and Performance Bonds
  • Escrow account equal to contract total

Contact:

Michelle Bahr

Contract Specialist

(928) 333-6278

michelle.l.bahr@usda.gov

The solicitation package, plans, and specifications will be made available on or after June 23, 2021, and will be posted at https://beta.sam.gov/

In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov

Offer Submissions: Offerors shall submit the Return Packet with the required information from Section M of the solicitation.  Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:  michelle.l.bahr@usda.gov before the deadline.

****The Deadline for receipt of responses to the RFQ shall be July 20, 2021 @ 4:00pm (Local)

                                Has been postponed to August 11, 2021 @ 4:00pm PD Has

                                 Extended to August 31, 2021 @ 4:00pm PD

Update #4 ·

Construction – Coconino NF Heritage Site Access Improvements

Description:

This work includes preparing the site within the construction limits to construct a walkway and viewing platform at V Bar V following all applicable codes including but not limited to county and government agencies.  The work shall also include preparing the site at Elden Pueblo and construction of a concrete sidewalk. Optional items shall include site preparation, paving and striping of the parking lot at Elden Pueblo.  All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.

This work shall include all labor, material, and equipment necessary to grade and compact the trail bed as shown on drawings.  The finished surface grades for concrete sidewalk, parking area, trail, and platform shall comply with Forest Service accessibility requirements.

Additional improvements shall include but not limited to labor, material, and equipment necessary to complete construction staking (Walkway, Retaining Walls & Stairs), clearing and grubbing, subgrade preparation, riprap, retaining walls construction, drainpipe trenching and installation, rock stairs, relocate sign, steel pipe handrail and posts, split rail fence, seeding and mulching,  relocation of donation tube and building.

The site is located on the Red Rock Ranger District within the Coconino National Forests.

  • V Bar V Platform

           From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right               onto N Forest Ranger Road to parking lot located approximately 0.2 miles.

The site is located on the Flagstaff Ranger District within the Coconino National Forests.

  •  Elden Pueblo

            From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is              located on the north side of Highway 89.

Basis for Award:  The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Tradeoffs:  Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.

***A Site Visit is scheduled for June 30, 2021 at 9:00 am has been postponed and will be held on JULY 14, 2021 at 9:00am 

Location:

    Elden Pueblo

    From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is               located on the north side of Highway 89.

    Followed by

    V Bar V Platform

    From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right onto        N Forest Ranger Road to parking lot located approximately 0.2 miles.

Amendment I 

Amendment II

This is a 100% Small Business Set-Aside.  The Small business Size Standard is 237990 – Other Heavy & Civil Engineering Construction 39.5M.

The magnitude of this project is between $100,000 and $250,000

Davis-Bacon wages apply.

The Contractor shall submit one of the following payment protections:

  • Irrevocable Letter of Credit
  • Payment and Performance Bonds
  • Escrow account equal to contract total

Contact:

Michelle Bahr

Contract Specialist

(928) 333-6278

michelle.l.bahr@usda.gov

The solicitation package, plans, and specifications will be made available on or after June 23, 2021, and will be posted at https://beta.sam.gov/

In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov

Offer Submissions: Offerors shall submit the Return Packet with the required information from Section M of the solicitation.  Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:  michelle.l.bahr@usda.gov before the deadline.

****The Deadline for receipt of responses to the RFQ shall be July 20, 2021 @ 4:00pm (Local)

                                 Has been postponed to August 11, 2021 @ 4:00pm PD

Update #3 ·

Construction – Coconino NF Heritage Site Access Improvements

Description:

This work includes preparing the site within the construction limits to construct a walkway and viewing platform at V Bar V following all applicable codes including but not limited to county and government agencies.  The work shall also include preparing the site at Elden Pueblo and construction of a concrete sidewalk. Optional items shall include site preparation, paving and striping of the parking lot at Elden Pueblo.  All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.

This work shall include all labor, material, and equipment necessary to grade and compact the trail bed as shown on drawings.  The finished surface grades for concrete sidewalk, parking area, trail, and platform shall comply with Forest Service accessibility requirements.

Additional improvements shall include but not limited to labor, material, and equipment necessary to complete construction staking (Walkway, Retaining Walls & Stairs), clearing and grubbing, subgrade preparation, riprap, retaining walls construction, drainpipe trenching and installation, rock stairs, relocate sign, steel pipe handrail and posts, split rail fence, seeding and mulching,  relocation of donation tube and building.

The site is located on the Red Rock Ranger District within the Coconino National Forests.

  • V Bar V Platform

           From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right               onto N Forest Ranger Road to parking lot located approximately 0.2 miles.

The site is located on the Flagstaff Ranger District within the Coconino National Forests.

  •  Elden Pueblo

            From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is              located on the north side of Highway 89.

Basis for Award:  The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Tradeoffs:  Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.

***A Site Visit is scheduled for June 30, 2021 at 9:00 am has been postponed and will be held on JULY 14, 2021 at 9:00am 

Location:

    Elden Pueblo

    From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is               located on the north side of Highway 89.

    Followed by

    V Bar V Platform

    From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right onto        N Forest Ranger Road to parking lot located approximately 0.2 miles.

Amendment I 

This is a 100% Small Business Set-Aside.  The Small business Size Standard is 237990 – Other Heavy & Civil Engineering Construction 39.5M.

The magnitude of this project is between $100,000 and $250,000

Davis-Bacon wages apply.

The Contractor shall submit one of the following payment protections:

  • Irrevocable Letter of Credit
  • Payment and Performance Bonds
  • Escrow account equal to contract total

Contact:

Michelle Bahr

Contract Specialist

(928) 333-6278

michelle.l.bahr@usda.gov

The solicitation package, plans, and specifications will be made available on or after June 23, 2021, and will be posted at https://beta.sam.gov/

In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov

Offer Submissions: Offerors shall submit the Return Packet with the required information from Section M of the solicitation.  Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:  michelle.l.bahr@usda.gov before the deadline.

****The Deadline for receipt of responses to the RFQ shall be July 20, 2021 @ 4:00pm (Local)

                                 Has been postponed to August 11, 2021 @ 4:00pm PD

Update #2 ·

Construction – Coconino NF Heritage Site Access Improvements

Description:

This work includes preparing the site within the construction limits to construct a walkway and viewing platform at V Bar V following all applicable codes including but not limited to county and government agencies.  The work shall also include preparing the site at Elden Pueblo and construction of a concrete sidewalk. Optional items shall include site preparation, paving and striping of the parking lot at Elden Pueblo.  All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.

This work shall include all labor, material, and equipment necessary to grade and compact the trail bed as shown on drawings.  The finished surface grades for concrete sidewalk, parking area, trail, and platform shall comply with Forest Service accessibility requirements.

Additional improvements shall include but not limited to labor, material, and equipment necessary to complete construction staking (Walkway, Retaining Walls & Stairs), clearing and grubbing, subgrade preparation, riprap, retaining walls construction, drainpipe trenching and installation, rock stairs, relocate sign, steel pipe handrail and posts, split rail fence, seeding and mulching,  relocation of donation tube and building.

The site is located on the Red Rock Ranger District within the Coconino National Forests.

  • V Bar V Platform

           From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right               onto N Forest Ranger Road to parking lot located approximately 0.2 miles.

The site is located on the Flagstaff Ranger District within the Coconino National Forests.

  •  Elden Pueblo

            From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is              located on the north side of Highway 89.

Basis for Award:  The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Tradeoffs:  Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.

***A Site Visit is scheduled for June 30, 2021 at 9:00 am has been postponed and will be held on JULY 14, 2021 at 9:00am 

Location:

    Elden Pueblo

    From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is               located on the north side of Highway 89.

    Followed by

    V Bar V Platform

    From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right onto        N Forest Ranger Road to parking lot located approximately 0.2 miles.

This is a 100% Small Business Set-Aside.  The Small business Size Standard is 237990 – Other Heavy & Civil Engineering Construction 39.5M.

The magnitude of this project is between $100,000 and $250,000

Davis-Bacon wages apply.

The Contractor shall submit one of the following payment protections:

  • Irrevocable Letter of Credit
  • Payment and Performance Bonds
  • Escrow account equal to contract total

Contact:

Michelle Bahr

Contract Specialist

(928) 333-6278

michelle.l.bahr@usda.gov

The solicitation package, plans, and specifications will be made available on or after June 23, 2021, and will be posted at https://beta.sam.gov/

In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov

Offer Submissions: Offerors shall submit the Return Packet with the required information from Section M of the solicitation.  Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:  michelle.l.bahr@usda.gov before the deadline.

****The Deadline for receipt of responses to the RFQ shall be July 20, 2021 @ 4:00pm (Local)

                                 Has been postponed to August 11, 2021 @ 4:00pm PD

Update #1 ·

Construction – Coconino NF Heritage Site Access Improvements

Description:

This work includes preparing the site within the construction limits to construct a walkway and viewing platform at V Bar V following all applicable codes including but not limited to county and government agencies.  The work shall also include preparing the site at Elden Pueblo and construction of a concrete sidewalk. Optional items shall include site preparation, paving and striping of the parking lot at Elden Pueblo.  All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified herein and as stated in the construction drawings.

This work shall include all labor, material, and equipment necessary to grade and compact the trail bed as shown on drawings.  The finished surface grades for concrete sidewalk, parking area, trail, and platform shall comply with Forest Service accessibility requirements.

Additional improvements shall include but not limited to labor, material, and equipment necessary to complete construction staking (Walkway, Retaining Walls & Stairs), clearing and grubbing, subgrade preparation, riprap, retaining walls construction, drainpipe trenching and installation, rock stairs, relocate sign, steel pipe handrail and posts, split rail fence, seeding and mulching,  relocation of donation tube and building.

The site is located on the Red Rock Ranger District within the Coconino National Forests.

  • V Bar V Platform

           From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right               onto N Forest Ranger Road to parking lot located approximately 0.2 miles.

The site is located on the Flagstaff Ranger District within the Coconino National Forests.

  •  Elden Pueblo

            From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is              located on the north side of Highway 89.

Basis for Award:  The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Best Value-Tradeoffs:  Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process.

A Site Visit is scheduled for June 30, 2021 at 9:00 am

Location:

    Elden Pueblo

    From the intersection of Highway 89 and Country Club Road travel north east on Highway 89 for 2.0 miles. Elden Pueblo is               located on the north side of Highway 89.

    Followed by

    V Bar V Platform

    From the intersection of I-17 and Highway 179 travel south east on Forest Service Road 618 for 2.5 miles then take a right onto        N Forest Ranger Road to parking lot located approximately 0.2 miles.

This is a 100% Small Business Set-Aside.  The Small business Size Standard is 237990 – Other Heavy & Civil Engineering Construction 39.5M.

The magnitude of this project is between $100,000 and $250,000

Davis-Bacon wages apply.

The Contractor shall submit one of the following payment protections:

  • Irrevocable Letter of Credit
  • Payment and Performance Bonds
  • Escrow account equal to contract total

Contact:

Michelle Bahr

Contract Specialist

(928) 333-6278

michelle.l.bahr@usda.gov

The solicitation package, plans, and specifications will be made available on or after June 23, 2021, and will be posted at https://beta.sam.gov/

In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov

Offer Submissions: Offerors shall submit the Return Packet with the required information from Section M of the solicitation.  Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:  michelle.l.bahr@usda.gov before the deadline.

The Deadline for receipt of responses to the RFQ shall be July 20, 2021 @ 4:00pm (Local)