127EAX21Q0041 Amendment I - Coconino NF Access Heritage Sites GAOA.pdf
PDF 315 KB Posted
- Attached to
- Coconino NF Heritage Site Access Improvements
- Solicitation number
- 127EAX21Q0041
About this file
This document includes an amendment to a solicitation for construction services and pre-bid questions and answers. The amendment provides additional details for a project to improve access and construct walkways and viewing platforms at two Coconino National Forest heritage sites. The project includes work at V Bar V Ranch to construct a walkway and platform, and improvements at Elden Pueblo such as a concrete sidewalk and optional parking area upgrades. The solicitation is a 100% small business set-aside with a size standard of $39.5 million for heavy and civil engineering construction. Davis-Bacon wage rates apply to the estimated $100,000 to $250,000 contract value. Offerors must register in SAM and submit a response packet by July 20th, 2021. The document answers pre-bid questions on technical specifications, permit requirements, limits of construction, and contractor responsibilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
127EAX21Q0041
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
SPRINGERVILLE AZ 85938
30 S CHIRICAHUA DR
PO BOX 640
APACHE SITGREAVES NATIONAL FOREST
USDA FOREST SERVICE
ALBUQUERQUE NM 87102
333 BROADWAY SE
SOUTHWESTERN REGION
GAOA103844307/22/2021
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/22/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment I: This solicitation is being amended to:
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
1. Provide Site visit sign sheet (attached separately)
2. Provide Q & A from Site Visit - Pages 3 - 4
All Other Terms and Conditions Remain the Same
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
127EAX21Q0041
Contact:
Michelle Bahr Contract Specialist
(928) 333-6278 michelle.l.bahr@usda.gov
In order to be eligible for award of a Federal
Contract, potential vendors need to already be registered in the System for Award Management
(SAM) www.sam.gov
Offer Submissions: Offerors shall submit the
Return Packet with the required information from
Section M of the solicitation. Offers or responses to the solicitation (include the solicitation number in the name of the document) may be sent to the Contracting officer by email:
michelle.l.bahr@usda.gov before the deadline.
The Deadline for receipt of responses to the RFQ shall be July 20, 2021 @ 4:00pm PD
Delivery: 08/01/2021
Delivery Location Code: 8167
USDA FOREST SERVICE
COCONINO NATIONAL FOREST SO
1824 S THOMPSON ST
FLAGSTAFF AZ 86004 US
FOB: Destination
GAOA Coconino NF Access Heritage Sites
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Question and Answers
It was discussed on site that the sidewalk is intended to be ADA compliant. Please provide the required specification that is to be adhered to for this design.
Slope shall be 5% or less. Sidewalk should be built to conform to Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG).
I the slope is kept below 5% no guardrails are required.
Please provide a designation of the limits of construction for the sidewalk as it is understood there are areas that cannot be disturbed.
10-12 feet will be acceptable from the small pueblo to the parking area. The archeologist will flag the limits of construction once the project begins.
Per the solicitation. CONTRACTOR'S EQUIPMENT PROVIDED FOR THE PERFORMANCE OF THE WORK SHALL BE OF THE APPROPRIATE SIZE, TYPE, AND NUMBER, AND IN GOOD WORKING CONDITION, SUITABLE FOR THE WORK REQUIRED.
Smaller wheeled equipment may need to be used.
Sidewalk is called out as an Exposed Aggregate finish. With the limitations of areas that can be disturbed, please confirm that this finish will be able to be accomplished.
Exposed Aggregate finish would not require any additional working area than would any other finish. It consists of adding pea gravel near the top surface right before the concrete becomes unworkable but still able to be finished and then the excess cement is washed with water to expose the aggregate.
What will the lift requirements be for the asphalt?
This information is in the construction drawings and specifications. See page 15 on the construction drawings.
Will there be a right of way permit needed and who will be responsible for the cost?
Work within the right of way would require an ADOT permit. The contractor is required to get and pay for all required permits.
Should the option to upgrade the existing parking lot be chosen, are there any design or engineering plans available for the portion of the parking lot that encompasses the parking bumpers removal? Currently, these are at an angle that has voids that fall into the native area adjacent to it. The new design depicts a straight line that would most likely require some build up and fill.
We do not have any engineered drawing or surveys for the Elden Pueblo Site. Any grading would be part of the construction cost.
Are there any as-builts as to how the building that is to be temporarily moved was constructed?
There are no clear indications as to footings, etc.
We do not have any engineered drawing for the building.
Although this sheet shows removal of existing trees and fencing, it does not clearly delineate limits of construction. Please provide
The limits of construction are approximately 5 feet from the proposed fence and 10 feet behind the existing building.
The following are a few more questions that I received last Wednesday.
Could we provide an area for a potential equipment turn around? (Elden Pueblo) I have an e-mail out to the Archeologist to see if he can give me more information.
Would they be required to temporarily remove any interpretive signs?
If the signs must be moved to complete project the contractor would be required to remove and then replace signs.
Would they be allowed to camp on site at V Bar V?
The contractor would need to apply for a camping permit to camp in the parking lot. Since the site will be closed during construction this will not be an issue. Any waste would need to be disposed of offsite.
If an RV or 5th wheel does not have adequate
Would they responsible for any damage to the trail that occurred during construction?
Yes, they would need to repair any damage.
Would they be allowed to chip, lop, and scatter any trees that are removed for the project?
I am checking with district.
| 127EAX21Q0041.pdf |
| Amendment I Prebid Questions.pdf |