CA FLAP 03S11(1) Reds Meadow Road
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF22B000008
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Mammoth Lakes, California 93546, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks reconstruction and rehabilitation services for Reds Meadow Road in Inyo National Forest, California. The Department of Transportation Federal Highway Administration will reconstruct and widen approximately 2.5 miles of the single-lane road to a two-lane configuration using techniques including cut slopes, soil nail walls, reinforced soil slopes, and rock cuts. Additionally, approximately 5.8 miles will be rehabilitated through pulverization and repaving. Bids are due by November 17, 2022 and the contract is valued between $20-30 million. Evaluation will be based on technical qualifications and price.
There is no set-aside designation. The primary NAICS code is 237110 and PSC code is D301. Incumbent contractors include Steve Manning Construction, INC. and Herback General Engineering. The location of performance is Mammoth Lakes, CA. Key details include reconstructing 2.5 miles of the 8.3 mile road, quantities of 9,500 cubic yards of embankment, 31,000 square feet of soil nail retaining walls, and construction must accommodate significant summer traffic over two seasons from Spring 2023 through Fall 2024.
Notice text
THIS IS AN INVINTATION FOR BID, PLANS AND SPECIFICATIONS ARE AVAILABLE
PROJECT NUMBER: CA FLAP 03S11(1)
PROJECT NAME: Reds Meadow Road
PROJECT DESCRIPTION: Reds Meadow Road is 8.3 miles long and provides the only access to several Inyo National Forest campgrounds, day use parking areas, trailheads, horse camp and equestrian facilities, Minaret Vista entrance station, Devils Postpile National Monument, and Reds Meadow Resort and Pack Station. The road begins at the intersection with Highway 203 at the Minaret Vista Entrance Station, continues along the side of the mountain and descends 2.5 miles into the valley, and then traverses the valley floor for 5.8 miles. The figure below provides a visual summary of the project location.
The upper 2.5 miles of the road are a single lane with turnouts and it is experiencing pavement and fill slope failures in several locations. This portion of the project, Schedule A, will be reconstructed (4R) to include a widened bench to accommodate two lanes of traffic. The lower 5.8 miles of the road, Option X, currently supports two lane traffic and will be rehabilitated (3R).
SCOPE OF THE WORK: The project consists of reconstructing and widening the upper 2.5 miles of road to a two-lane road. Widening will be accomplished in this section through the cut slopes, fill slopes, soil nail walls, reinforced soil slopes, and rock cuts. Guardrail will be constructed in select locations. The lower 5.8 miles of road will be rehabilitated through pulverization and repaving with a few areas of superelevation correction, the reconstruction of the entrance to the Devil’s Postpile National Monument, and the excavation and or clearing of a few embankments to improve sight distance. The project involves a variety of work including excavation, rock excavation, soil nail walls, reinforced soil slopes, pipe culverts, guardrail, ditch reconditioning, drainage repairs, riprap, asphalt paving, full depth reclamation (pulverize and pave), erosion control, and revegetation.
Items worth noting:
- Being the only access road to several recreation sites, Reds Meadow Road receives significant traffic during the summer months. Full closures during the daytime will not be allowed for the majority of the construction season. Maintenance of public traffic will be an important construction consideration. Daytime delays will be a maximum of 30 minutes.
- The project elevation is between 8,000 and 9,000 feet. The construction season will generally be May to October but will depend on weather.
- The project is in very steep, mountainous terrain, with a very narrow bench in the upper 2.5 mile portion of the project. Widening through the construction of soil nail walls, rock cuts, and reinforce soil fill slopes, will be difficult in this terrain.
- 14 soil nail walls with max heights ranging from 6 to 12 feet are proposed. Soil nails will be installed in hard rock that includes fractured areas, boulders, and zones of talus.
- A sculpted and colored concrete facing to blend with the surrounding geology will be required on the soil nail walls.
- Some rock excavation may require blasting.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
- 9,500 cubic yards of roadway embankment 26,000 cubic yards of reinforced soil slope 31,000 square feet of soil nail retaining wall 4,000 cubic yards of rock excavation
- 12,000 tons of roadway aggregate
- 22,000 tons of asphalt concrete pavement
- 5.8 miles of full depth reclamation
- 3,700 linear feet pipe culvert (15 to 36 inch diameter) 3,325 linear feet of guardrail
- 9,800 linear feet of asphalt curb
ANTICIPATED SCHEDULE:
Advertise: October 2022
Award: December 2022
Construction: Spring 2023 – Fall 2024
Note construction will be two seasons. May to approximately October in 2023 and 2024.
ESTIMATED COST RANGE: The anticipated cost range is between $20,000,000 and $30,000,000.
Attachments
Show all 28
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA FLAP 03S11(1) Reds Meadow Road | Award Notice | |
| CA FLAP 03S11(1) Reds Meadow Road | Solicitation | |
| CA FLAP 03S11(1) Reds Meadow Road | Pre-Solicitation | |
| CA FLAP 03S11(1) Reds Meadow Road | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity