This document provides details on a federal contract opportunity for the CA FLAP 03S11(1) Reds Meadow Road project. The project involves reconstructing and widening the upper 2.5 miles of an 8.3 mile long access road to a two-lane configuration through techniques including cut slopes, fill slopes, soil nail walls, reinforced soil slopes, and rock cuts. The lower 5.8 miles will be rehabilitated through pulverization and repaving. The scope of work includes excavation, rock excavation, soil nail walls with sculpted concrete facing, reinforced soil slopes, pipe culverts, guardrail, drainage work, riprap, asphalt paving, full depth reclamation, and erosion control. The estimated cost range is between $20-30 million. The advertisement date is October 2022, with bids due in December 2022 and construction planned from Spring 2023 to Fall 2024. The Department of Transportation Federal Highway Administration is the contracting agency.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for CA FLAP 03S11(1)-Reds Meadow Road
October 27, 2022
Questions Answers 1 Plan Sht. A9 typical section Sta 10+70 To 139+09 requires 3”
HMA on 4” Aggregate Base.
a. Where is demolition/ removal of the existing asphalt to be paid?
b. Is pulverized asphalt suitable for embankment or aggregate base in this area?
a.) No direct payment b.) Yes, if it meets the respective specification for embankment or aggregate base.