This solicitation package describes a federal highway construction project. Reds Meadow Road provides access to several Inyo National Forest sites in California and will be reconstructed over two seasons from 2023 to 2024. The upper 2.5 miles will be widened to two lanes through excavation, soil nail walls, reinforced soil slopes, and rock cuts. The lower 5.8 miles will be rehabilitated through pulverization and repaving. Major work includes embankment, soil nail walls, pipe culverts, guardrail, asphalt paving, and erosion control. The estimated cost range is $20-30 million. Interested contractors should submit bids by December 2022 for consideration, with construction to begin in spring 2023 under the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1 3
A001 11/10/2022 HFLCEO220407PR CA FLAP 03S11(1)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: CONTRACT SPECIALIST NAME
6905001
6982AF22B000008
10/07/2022
0*
*See Item 14
PLANS
Remove and replace pages A2 and T21 with the attached corresponding pages.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE
SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
DI
SPRING
U.S. CUSTOMARYU.S. CUSTOMARY
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 1 of 2
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
11/09/2022
STATE PROJECT
A
M U
S L
A S A
P P I C
S w o r k d ir A S y m R
M
A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r U
S L
A S A
P P
NUMBER
SHEET
CA CA FLAP 03S11(1)
dustin.robbins Cloud dustin.robbins Cloud dustin.robbins Text Box Amendment A001 11/10/2022 Added Sheet T21
601-A
STANDARD PLAN D89B
ADAPTED FROM CALTRANS
NO SCALE
T21
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
H
Min ƒS
W
H D
Min ƒD
W
1.5H Min 1.5H Min
1.5H Min 1.5H Min
W W
1'-11"
S
W
C
B
"c" BARS
"d" BARS
C l r"
Typ
" Clr8
D E
S I
G N
H
BC
W
Typ
" Clr8
D E
S I
G N
H
BC
W
C l r
" Clr8
C l r
" Clr8
T T
F
C l r"
F
M i n
M i n
T
H D H
2'-0" Min
S/2 OR
D D
2'-0" Min
D/2 OR
H
H
S S S
1.5H Min 1.5H Min 1.5H Min 1.5H Min
LLLL
F FF
F F
F
F
D h h h
T
Min
1'-0"
90°, Typ
Typ
"8 11'-11
DEVELOPMENT LENGTH
REINFORCED CONCRETE HEADWALL
CIRCULAR PIPE CULVERT HEADWALLS
SEE NOTE 2
SEE NOTE 2
CMP ARCH CULVERT HEADWALLS
SINGLE CIRCULAR PIPE
STRAIGHT HEADWALL
ELEVATION
DOUBLE CIRCULAR PIPE
STRAIGHT HEADWALL
ELEVATION
DOUBLE CMP
STRAIGHT HEADWALL
ELEVATION
"L" HEADWALL
ELEVATION
ƒ" CHAMFER
"L" HEADWALL
SECTION
DETAIL OF DESIGN LOADING CASES
and do not consider pipe occupancy.
Quantities do not include added diagonals
SINGLE CMP
STRAIGHT HEADWALL
ELEVATION
y ƒ" CHAMFER
PIPE Inv
"L" HEADWALL
ELEVATION
"L" HEADWALL
SECTION
PLAN VIEW
STEM WALL
#4 BARS
BUNDLED
#4 BARS
Straight headwall similar.
"L" headwall shown.
PIPE Inv
PIPES < 48" Dia
OMIT ROUNDING FOR
PIPES < 48" Dia
OMIT ROUNDING FOR
h
36 pcf Equivalent Fluid Pressure:
120 pcfEarth Density:
f'c = 3,600 psi f = 60,000 psiReinforced Concrete:NOTE:
L2
L2
L1
L1
ON Std PLAN B0-3
BRIDGE DETAIL 3-1
FOR "L" WALL, SEE
Alt WEEP HOLE
* Conc CY/LF
* Reinf LB/LF
T
H
F
#4 @ 12
"c" BARS
TYPICAL SECTION
TOP OF WALL
#5, Tot 3 ALONG
#4 @ 12 "c" BARS
SECTION A-A
Const Jt
BUNDLED
#4 BARS
R=9"R=9"
"d" BARS
Jt
Const
H
ON Std PLAN B0-3
BRIDGE DETAIL 3-1
BACKFILL, SEE
AND PERVIOUS
WEEP HOLE
OF WALL
ALONG TOP
#5, Tot 3
H
"d" BARS
**CASE III
**CASE II
FILL SLOPE FILL SLOPE
PIPE Inv ƒ" CHAMFER ƒ" CHAMFERƒ" CHAMFER
PIPE Inv, Typ ƒ" CHAMFER
PIPE Inv PIPE Inv, Typ h h h
#4 @ 12 #4 @ 12
Str (q'o, B')
Ser (q'o, B')
Str (q'o, B')
Ser (q'o, B') h
6'-5"
6'-2"
5'-11"
5'-8"
5'-5"
5'-2"
4'-11"
4'-8"
4'-2"
3'-11"
3'-8"
3'-5"
3'-2"
2'-11"
2'-8"
54''
51''
48''
45''
42''
39''
36''
33''
30''
27''
24''
21''
18''
15''
12''
71" x 47"
64" x 43"
57" x 38"
49" x 33"
42" x 29"
35" x 24"
28" x 20"
24" x 18"
21" x 15"
S x h
ARCH SIZE
CMP
D
PIPE SIZE
CIRCULAR
H
Str - strength limit
Ser - service limit q'o = net bearing stress (ksf), B' = effective footing width (ft)**
Quantities include 1'-0" extension above the design "H" limit. *
BUNDLED
BARS
W
W
TOP "d" BARS OR BOTTOM #4 BARS
#4 BARS
FOOTING
PLAN VIEW
BOTTOM #4 BARS
TOP "d" BARS OR
Straight headwall similar.
"L" headwall shown.
#4 BARS
D
CASE II CASE III
S L
O P E
5'-0", Max
SURCHARGE
LIVE LOAD
R
E V
IS
E
T
A N
D A
R
P L A
N
R
P
B
REINFORCEMENT MODIFICATION
"L" headwall shown. Straight headwall similar.
Ea FACE
4-#4 BARS
VERTICAL BARS SEE TYPICAL SECTION
T y p1
A
A
#5 BARS
#4 BARS
2-#6
EACH FACE, SEE NOTE 4
ADDITIONAL BARS
WEEP HOLE, Typ
TYPICAL SECTION
VERTICAL BARS, SEE
Bundle of two bars-
#4 BARS
2:
UNLI
MI
TED
LINE
INSIDE GROUND
1'-0"
Min
1• :1
OR
FLATTER
SLOPE
VARI
ES
BUNDLED
#4 BARS
"c" BARS
#4
0.91, 2.01
0.56, 2.05
1.07, 1.80
0.41, 1.85
0.20
#4 @ 12
#4 @ 12
1'-0"
1'-9"
6"
2'-3"
10"
2'-8"
0.98, 2.05
0.62, 2.08
1.12, 1.83
0.48, 1.89
0.20
#4 @ 12
#4 @ 12
1'-0"
1'-9"
6"
2'-3"
10"
2'-11"
1.06, 2.04
0.70, 2.10
1.20, 1.85
0.55, 1.91
0.21
#4 @ 12
#4 @ 12
1'-0"
1'-9"
6"
2'-3"
10"
3'-2"
1.19, 2.06
0.75, 2.12
1.32, 1.89
0.60, 1.95
0.23
#4 @ 12
#4 @ 12
1'-0"
2'-0"
6"
2'-6"
10"
3'-5"
1.22, 2.28
0.81, 2.20
1.34, 2.05
0.62, 2.08
0.24
#5 @ 12
#4 @ 12
1'-0"
2'-0"
6"
2'-6"
10"
3'-8"
1.30, 2.34
0.83, 2.38
1.36, 2.19
0.62, 2.20
0.26
#5 @ 12
#4 @ 12
1'-2"
2'-0"
6"
2'-6"
10"
3'-11"
1.36, 2.40
0.85, 2.49
1.39, 2.36
0.63, 2.44
0.29
#5 @ 12
#4 @ 12
1'-2"
2'-3"
9"
3'-0"
10"
4'-2"
1.41, 2.51
0.91, 2.60
1.45, 2.48
0.67, 2.61
0.30
#5 @ 9
#5 @ 12
1'-2"
2'-3"
9"
3'-0"
10"
4'-8"
1.49, 2.59
0.94, 2.75
1.50, 2.64
0.71, 2.72
0.32
#5 @ 9
#5 @ 12
1'-2"
2'-3"
9"
3'-3"
10"
4'-11"
1.55, 2.68
0.97, 2.81
1.55, 2.77
0.75, 2.87
0.35
#5 @ 9
#5 @ 12
1'-2"
2'-9"
1'-0"
3'-9"
10"
5'-2"
1.65, 2.76
1.02, 2.91
1.62, 2.91
0.80, 2.93
0.37
#5 @ 9
#5 @ 12
1'-2"
3'-0"
1'-0"
4'-0"
10"
5'-5"
1.71, 2.90
1.09, 3.05
1.69, 3.16
0.84, 3.10
0.39
#6 @ 12
#5 @ 12
1'-2"
3'-2"
1'-0"
4'-2"
10"
5'-8"
1.79, 3.03
1.12, 3.12
1.72, 3.23
0.88, 3.20
0.44
#6 @ 9
#5 @ 9
1'-2"
3'-2"
1'-0"
4'-2"
1-0"
5'-11"
1.85, 3.07
1.18, 3.23
1.79, 3.33
0.91, 3.44
0.46
#6 @ 9
#5 @ 9
1'-2"
3'-6"
1'-0"
4'-6"
1-0"
6'-2"
1.90, 3.33
1.22, 3.50
1.82, 3.67
0.95, 3.78
0.48
#6 @ 9
#5 @ 9
1'-2"
3'-6"
1'-3"
4'-9"
1-0"
6'-5"
Circular pipe shown. CMP arch similar.
11/09/2022
PIPE CULVERT HEADWALLS
NOTES:
concrete, headwall for double 36-inch pipe.
Pipe culvert headwalls are paid for as an each item under 60103-0660, exceed that shown here, and the bottom of footing must be roughened.
If precast construction is used, the design standard shall be equal to or
Provide necessary erosion protection in front of wall.
made for pipe or arch occupancy.
Quantities are approximate and for design purposes only. No deduction is equivalent to half the interrupted main reinforcement.
Adjacent to each side of the opening, place additional reinforcement information.
PIPE" or "ELEVATION STRAIGHT HEADWALL DOUBLE CMP" detail for additional pipe in "L" headwall, see "ELEVATION STRAIGHT HEADWALL DOUBLE CIRCULAR
Single circular pipe or single CMP shown for "L" headwall. For double headwall need to be embedded into the slope by one foot.
Length of wall from • pipe to end of wall is 1.5H Min. The ends of
7.
6.
5.
4.
3.
2.
1.
STATE PROJECT
A
M U
S L
A S A
P P I C
S w o r k d ir T s p C
B R
M .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r U
S L
A S A
P P
NUMBER
SHEET
CA CA FLAP 03S11(1)
dustin.robbins Cloud dustin.robbins Cloud dustin.robbins Text Box Amendment A001 11/10/2022 Added Sheet T21
| CA_FLAP_03S11(1)_DwgA2_A001.pdf |
| A02_SymRM1A-01 |
| CA_FLAP_03S11(1)_DwgT21_A001.pdf |
| T601-01_sp604-CBRM |
File details come from the government source that posted it. Updated .