This document provides details for a federal contract solicitation to reconstruct and rehabilitate Reds Meadow Road in California. The project involves reconstructing the upper 2.5 miles of the road to a two-lane standard, which will require widening through cut slopes, soil nail walls up to 12 feet high, reinforced soil slopes, and rock cuts. The lower 5.8 miles will be rehabilitated through pulverization and repaving. Major work items include roadway embankment, reinforced soil slope construction, soil nail retaining walls, rock excavation, asphalt paving, and pipe culverts. The estimated cost range is between $20-30 million. The solicitation was advertised in October 2022 with anticipated contract award in December 2022 and construction from Spring 2023 to Fall 2024 over two seasons.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for CA FLAP 03S11(1)-Reds Meadow Road
November 10, 2022
Questions Answers 1 Plan Sht. A9 typical section Sta 10+70 To 139+09 requires 3”
HMA on 4” Aggregate Base.
a. Where is demolition/ removal of the existing asphalt to be paid?
b. Is pulverized asphalt suitable for embankment or aggregate base in this area?
No direct payment
Yes, if it meets the respective specification for embankment or aggregate base.
2 I am unable to locate plan details for the Double 36” headwalls called out For Option X Sta 772+00
Please see Amendment A001