This document provides details for a federal contract opportunity to reconstruct and rehabilitate Reds Meadow Road in Inyo National Forest, California. The project consists of reconstructing the upper 2.5 miles of the single-lane road to a two-lane configuration through cut slopes, fill slopes, soil nail walls, reinforced soil slopes, and rock cuts. The lower 5.8 miles will be rehabilitated through pulverization and repaving with areas of superelevation correction, reconstruction of the Devil's Postpile National Monument entrance, and embankment excavation or clearing to improve sight distance. The solicitation was issued by the Department of Transportation Federal Highway Administration with an estimated cost range of $20-30 million. The anticipated schedule is to advertise in October 2022, award in December 2022, and complete construction over two seasons from spring 2023 to fall 2024.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reds Meadow Road Improvements Revised Final Geotechnical Report
100062-003 January 22, 2021 F-i
AP
PE
ND
IX
F :E
XI
ST
IN
G
RO
CK
S
LO
PE
P
HO
TO
GR
AP
HS
Appendix F: Existing Rock Slope Photographs
Appendix F
Existing Rock Slope Photographs
CONTENTS
Figure F-1, Existing Rock Slope Photos, Stations 12+80 to 13+10
Figure F-2, Existing Rock Slope Photos, Stations 14+50 to 14+74
Figure F-3, Existing Rock Slope Photos, Stations 72+80 to 74+00 (1) SE
Figure F-4, Existing Rock Slope Photos, Stations 72+80 to 74+00 (2) Middle
Figure F-5, Existing Rock Slope Photos, Stations 72+80 to 74+00 (3) NW
Figure F-6, Existing Rock Slope Photos, Stations 95+40 to 96+40 (1) N
Figure F-7, Existing Rock Slope Photos, Stations 95+40 to 96+40 (2) Middle
Figure F-8, Existing Rock Slope Photos, Stations 95+40 to 96+40 (3) S
Figure F-9, Existing Rock Slope Photos, Stations 99+20 to 100+00
Geotechnical and Environmental Consultants
100062-003 January 22, 2021 II-i
IM
PO
RT
AN
T
IN
FO
RM
AT
IO
N Important Information
Important Information About Your Geotechnical/Environmental Report
100062-003 January 22, 2021
II-1
IM
PO
RT
AN
T
IN
FO
RM
AT
IO
N
CONSULTING SERVICES ARE PERFORMED FOR SPECIFIC PURPOSES AND FOR
SPECIFIC CLIENTS.
Consultants prepare reports to meet the specific needs of specific individuals. A report prepared for a civil engineer may not be adequate for a construction contractor or even another civil engineer.
Unless indicated otherwise, your consultant prepared your report expressly for you and expressly for the purposes you indicated. No one other than you should apply this report for its intended purpose without first conferring with the consultant. No party should apply this report for any purpose other than that originally contemplated without first conferring with the consultant.
THE CONSULTANT’S REPORT IS BASED ON PROJECT-SPECIFIC FACTORS.
A geotechnical/environmental report is based on a subsurface exploration plan designed to consider a unique set of project-specific factors. Depending on the project, these may include the general nature of the structure and property involved; its size and configuration; its historical use and practice; the location of the structure on the site and its orientation; other improvements such as access roads, parking lots, and underground utilities; and the additional risk created by scope-of-service limitations imposed by the client. To help avoid costly problems, ask the consultant to evaluate how any factors that change subsequent to the date of the report may affect the recommendations. Unless your consultant indicates otherwise, your report should not be used
(1) when the nature of the proposed project is changed (for example, if an office building will be erected instead of a parking garage, or if a refrigerated warehouse will be built instead of an unrefrigerated one, or chemicals are discovered on or near the site); (2) when the size, elevation, or configuration of the proposed project is altered; (3) when the location or orientation of the proposed project is modified; (4) when there is a change of ownership; or (5) for application to an adjacent site.
Consultants cannot accept responsibility for problems that may occur if they are not consulted after factors that were considered in the development of the report have changed.
SUBSURFACE CONDITIONS CAN CHANGE.
Subsurface conditions may be affected as a result of natural processes or human activity. Because a geotechnical/environmental report is based on conditions that existed at the time of subsurface exploration, construction decisions should not be based on a report whose adequacy may have been affected by time. Ask the consultant to advise if additional tests are desirable before construction starts; for example, groundwater conditions commonly vary seasonally.
Construction operations at or adjacent to the site and natural events such as floods, earthquakes, or groundwater fluctuations may also affect subsurface conditions and, thus, the continuing adequacy of a geotechnical/environmental report. The consultant should be kept apprised of any such events and should be consulted to determine if additional tests are necessary.
MOST RECOMMENDATIONS ARE PROFESSIONAL JUDGMENTS.
Site exploration and testing identifies actual surface and subsurface conditions only at those points where samples are taken. The data were extrapolated by your consultant, who then applied judgment to render an opinion about overall subsurface conditions. The actual interface between materials may be far more gradual or abrupt than your report indicates. Actual conditions in areas not sampled may differ from those predicted in your report. While nothing can be done to prevent such situations, you and your consultant can work together to help reduce their impacts. Retaining
100062-003 January 22, 2021
II-2
IM
PO
RT
AN
T
IN
FO
RM
AT
IO
N your consultant to observe subsurface construction operations can be particularly beneficial in this respect.
A REPORT’S CONCLUSIONS ARE PRELIMINARY.
The conclusions contained in your consultant’s report are preliminary, because they must be based on the assumption that conditions revealed through selective exploratory sampling are indicative of actual conditions throughout a site. Actual subsurface conditions can be discerned only during earthwork; therefore, you should retain your consultant to observe actual conditions and to provide conclusions. Only the consultant who prepared the report is fully familiar with the background information needed to determine whether or not the report’s recommendations based on those conclusions are valid and whether or not the contractor is abiding by applicable recommendations.
The consultant who developed your report cannot assume responsibility or liability for the adequacy of the report’s recommendations if another party is retained to observe construction.
THE CONSULTANT’S REPORT IS SUBJECT TO MISINTERPRETATION.
Costly problems can occur when other design professionals develop their plans based on misinterpretation of a geotechnical/environmental report. To help avoid these problems, the consultant should be retained to work with other project design professionals to explain relevant geotechnical, geological, hydrogeological, and environmental findings, and to review the adequacy of their plans and specifications relative to these issues.
BORING LOGS AND/OR MONITORING WELL DATA SHOULD NOT BE SEPARATED
FROM THE REPORT.
Final boring logs developed by the consultant are based upon interpretation of field logs (assembled by site personnel), field test results, and laboratory and/or office evaluation of field samples and data.
Only final boring logs and data are customarily included in geotechnical/environmental reports.
These final logs should not, under any circumstances, be redrawn for inclusion in architectural or other design drawings, because drafters may commit errors or omissions in the transfer process.
To reduce the likelihood of boring log or monitoring well misinterpretation, contractors should be given ready access to the complete geotechnical engineering/environmental report prepared or authorized for their use. If access is provided only to the report prepared for you, you should advise contractors of the report’s limitations, assuming that a contractor was not one of the specific persons for whom the report was prepared, and that developing construction cost estimates was not one of the specific purposes for which it was prepared. While a contractor may gain important knowledge from a report prepared for another party, the contractor should discuss the report with your consultant and perform the additional or alternative work believed necessary to obtain the data specifically appropriate for construction cost estimating purposes. Some clients hold the mistaken impression that simply disclaiming responsibility for the accuracy of subsurface information always insulates them from attendant liability. Providing the best available information to contractors helps prevent costly construction problems and the adversarial attitudes that aggravate them to a disproportionate scale.
READ RESPONSIBILITY CLAUSES CLOSELY.
Because geotechnical/environmental engineering is based extensively on judgment and opinion, it is far less exact than other design disciplines. This situation has resulted in wholly unwarranted claims
100062-003 January 22, 2021
II-3
IM
PO
RT
AN
T
IN
FO
RM
AT
IO
N being lodged against consultants. To help prevent this problem, consultants have developed a number of clauses for use in their contracts, reports, and other documents. These responsibility clauses are not exculpatory clauses designed to transfer the consultant’s liabilities to other parties;
rather, they are definitive clauses that identify where the consultant’s responsibilities begin and end.
Their use helps all parties involved recognize their individual responsibilities and take appropriate action. Some of these definitive clauses are likely to appear in your report, and you are encouraged to read them closely. Your consultant will be pleased to give full and frank answers to your questions.
The preceding paragraphs are based on information provided by the ASFE/Association of Engineering Firms Practicing in the Geosciences, Silver Spring, Maryland