C-5 Nose Landing Gear Door Actuator Assemblies

Closed Solicitation Posted

Solicitation number
FA853826R0012
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Warner Robins, Georgia 31098, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Air Force Sustainment Center seeks overhaul services for C-5 Nose Landing Gear Door Actuator Assemblies across four NSN variants (1680-01-160-6520UC, 1680-01-160-6519UC, 1680-01-237-0231UC, 1680-01-237-0230UC), with proposals due September 8, 2026. This is a full and open competition utilizing Lowest Price Technically Acceptable (LPTA) evaluation.

The contract is a requirements type instrument with a five-year period of performance: one basic year plus four one-year ordering periods. Best estimated quantities per NSN are 10 units in the basic year, followed by 9, 10, 9, and 10 units in ordering periods 1–4 respectively, for a total of 48 units per NSN across the contract term. Place of performance is Warner Robins, Georgia.

Offerors must document at least two contracts within the last five years for overhaul of aircraft hydraulic actuator assemblies of similar complexity, including contract numbers, periods of performance, government points of contact, and work narratives. Current third-party certification for an ISO 9001 or equivalent quality management system (such as AS9100) from an accredited body is required. The contractor must maintain compliance with applicable technical orders TO 9H2-3-77-3 and TO 9H2-3-77-4, perform work to OEM Acceptance Test Procedures, and deliver overhauled assets using fast transportation with transit visibility. MICAP and Surge deliveries are required within 45 calendar days (or 30 days if items are already in-house). Performance thresholds include no more than two DCMA final inspection failures per contract year, a minimum 95% pass rate on initial inspection, no more than one PQDR/QDR per contract year, and no more than one exception per order for late completion. The contractor must submit monthly production reports, annual government property inventory reports, Commercial Asset Visibility (CAV-AF) data, and comply with Supply Chain Risk Management and Item Unique Identification (IUID) requirements.

Evaluation criteria rank price first, with technical acceptability as a secondary factor addressing Nose Landing Gear Door Actuator Assembly Overhaul Experience and Quality System certification. NAICS code is 336413. Three amendments have been issued: Amendment 01 (June 18) updated unit of measure, pricing columns, and incorporated cybersecurity compliance clauses; Amendment 02 (July 15) extended the deadline from July 20 to September 8; Amendment 03 (July 29) revised PWS Section 4.5.2 (Tooling and Test Equipment), updated regulatory references, and added the Cross Reference Matrix as Attachment 5. Government-furnished property includes electromechanical actuators valued at approximately $10.2 million across four line items. Firm fixed-price pricing applies to the basic period. Inspection and acceptance occur at origin with F.O.B. origin terms and DPAS A-1 priority rating.

Notice text

6 versions

Update #6 · Latest ·

AMENDMENT FA853826R0012 03, is issued due to an update to the PWS, specifically Section 4.5.2 (Tooling and Test Equipment) and update Regulatory References IAW RFO. Also an administrative correction, incorporating the Cross Reference Matrixs as Attachment 5 to the Solicitation.  

AMENDMENT FA853826R0012 02, is issued to extend the proposal receipt date from 20 July 2026 5:00PM EST, to 08 September 2026 5:00PM EST. All other terms and conditions shall remain the same. 

AMENDMENT FA853826R0012 01, is issued to update the unit of measure and pricing columns for all Repair/BER line items, fully incorporate the cybersecurity compliance clause text, and refresh standard regulatory clauses. The proposal submission deadline remains unchanged and is 20 July 2026.

C-5 Nose Landing Gear (NLG) Door Actuators Assemblies
LH Actuator Assembly: NSN: 1680-01-160-6520UC  PN: 177560-32
RH Actuator Assembly: NSN: 1680-01-160-6519UC  PN: 177560-33
LH Actuator Assembly:  NSN: 1680-01-237-0231UC  PN: 177560-34
RH Actuator Assembly: NSN: 1680-01-237-0230UC   PN: 177560-35

These actuator assemblies are part of the C-5 NLG Door Actuation System. The NLG doors consist of two inboard doors and two outboard doors and are actuated separately from the gear. When the NLG is extended, the doors are held open by the actuators, and when the landing gear is retracted, the actuators close the doors to enclose the landing gear and streamline the aircraft. 

This overhaul effort will utilize a Requirements Type Contract. Contract period of performance will be five (5) years. It will consist of a one (1) year basic period and four (4) one (1) year ordering periods. The Best Estimated Quantities for each ordering period are listed below. The USAF anticipates the acquisition will be Full and Open Competition utilizing the Lowest Price Technically Acceptable (LPTA).

NSN 1680-01-160-6520UC
YEAR                     BEQ         
Basic                       10         
Ordering Period 1     9        
Ordering Period 2    10         
Ordering Period 3     9        
Ordering Period 4    10

NSN 1680-01-160-6519UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0231UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0230UC
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10 

The Government owns the technical data package. Interested parties shall be registered in the Joint Certification Program and approved to view Export Control, and shall submit evidence of their certification in order to obtain the associated technical data packages. 

To obtain copies of the bidset documents, an interested vendor shall be registered in the Joint Certification Program (JCP). Interested vendors are to request copies of the bidsets by providing their CAGE number to both Alyssa Tanner (alyssa.tanner.1@us.af.mil) and Stacylee Johnson (stacylee.johnson.1@us.af.mil) to verify registration in JCP. Upon verification, bidset zip files will be sent via the "DOD Safe" website. 

To become registered in the JCP, interested vendors can do so at the following website: 

https://www.dla.mil/logistics-operations/services/joint-certification-program/ 

The RFP and attachments are included within the attachments area of this solicitation. All attachments are attached separately for convenience. 

 All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and all amendments/revisions.

Contact Alyssa Tanner, Contract Specialist, and Stacylee Johnson, Contracting Officer, for questions or clarification.  Questions will ONLY be received via E-mail.  Phone calls are not acceptable, and voice mail will not be answered nor returned.

All questions will be answered via a Question and Answers (Q&A) document posted on SAM.gov attachment added to this posting and noted below in this description with the date it was updated.

Q&A Posted 29 July, 2026.

Alyssa Tanner, alyssa.tanner.1@us.af.mil

Stacylee Johnson, stacylee.johnson.1@us.af.mil

Completed Request for Proposal responses and documents are due 5:00 PM EST, 08 SEPT 2026

Update #5 ·

AMENDMENT FA853826R0012 03, is issued due to an update to the PWS, specifically Section 4.5.2 (Tooling and Test Equipment) and update Regulatory References IAW RFO. Also an administrative correction, incorporating the Cross Reference Matrixs as Attachment 5 to the Solicitation.  

AMENDMENT FA853826R0012 02, is issued to extend the proposal receipt date from 20 July 2026 5:00PM EST, to 08 September 2026 5:00PM EST. All other terms and conditions shall remain the same. 

AMENDMENT FA853826R0012 01, is issued to update the unit of measure and pricing columns for all Repair/BER line items, fully incorporate the cybersecurity compliance clause text, and refresh standard regulatory clauses. The proposal submission deadline remains unchanged and is 20 July 2026.

C-5 Nose Landing Gear (NLG) Door Actuators Assemblies
LH Actuator Assembly: NSN: 1680-01-160-6520UC  PN: 177560-32
RH Actuator Assembly: NSN: 1680-01-160-6519UC  PN: 177560-33
LH Actuator Assembly:  NSN: 1680-01-237-0231UC  PN: 177560-34
RH Actuator Assembly: NSN: 1680-01-237-0230UC   PN: 177560-35

These actuator assemblies are part of the C-5 NLG Door Actuation System. The NLG doors consist of two inboard doors and two outboard doors and are actuated separately from the gear. When the NLG is extended, the doors are held open by the actuators, and when the landing gear is retracted, the actuators close the doors to enclose the landing gear and streamline the aircraft. 

This overhaul effort will utilize a Requirements Type Contract. Contract period of performance will be five (5) years. It will consist of a one (1) year basic period and four (4) one (1) year ordering periods. The Best Estimated Quantities for each ordering period are listed below. The USAF anticipates the acquisition will be Full and Open Competition utilizing the Lowest Price Technically Acceptable (LPTA).

NSN 1680-01-160-6520UC
YEAR                     BEQ         
Basic                       10         
Ordering Period 1     9        
Ordering Period 2    10         
Ordering Period 3     9        
Ordering Period 4    10

NSN 1680-01-160-6519UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0231UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0230UC
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10 

The Government owns the technical data package. Interested parties shall be registered in the Joint Certification Program and approved to view Export Control, and shall submit evidence of their certification in order to obtain the associated technical data packages. 

To obtain copies of the bidset documents, an interested vendor shall be registered in the Joint Certification Program (JCP). Interested vendors are to request copies of the bidsets by providing their CAGE number to both Alyssa Tanner (alyssa.tanner.1@us.af.mil) and Stacylee Johnson (stacylee.johnson.1@us.af.mil) to verify registration in JCP. Upon verification, bidset zip files will be sent via the "DOD Safe" website. 

To become registered in the JCP, interested vendors can do so at the following website: 

https://www.dla.mil/logistics-operations/services/joint-certification-program/ 

The RFP and attachments are included within the attachments area of this solicitation. All attachments are attached separately for convenience. 

 All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and all amendments/revisions.

Contact Alyssa Tanner, Contract Specialist, and Stacylee Johnson, Contracting Officer, for questions or clarification.  Questions will ONLY be received via E-mail.  Phone calls are not acceptable, and voice mail will not be answered nor returned.

All questions will be answered via a Question and Answers (Q&A) document posted on SAM.gov attachment added to this posting and noted below in this description with the date it was updated.

Q&A Posted 29 July, 2026.

Alyssa Tanner, alyssa.tanner.1@us.af.mil

Stacylee Johnson, stacylee.johnson.1@us.af.mil

Completed Request for Proposal responses and documents are due 5:00 PM EST, 20 JUL 2026

Update #4 ·

AMENDMENT FA853826R0012 02, is issued to extend the proposal receipt date from 20 July 2026 5:00PM EST, to 08 September 2026 5:00PM EST. All other terms and conditions shall remain the same. 

AMENDMENT FA853826R0012 01, is issued to update the unit of measure and pricing columns for all Repair/BER line items, fully incorporate the cybersecurity compliance clause text, and refresh standard regulatory clauses. The proposal submission deadline remains unchanged and is 20 July 2026.

C-5 Nose Landing Gear (NLG) Door Actuators Assemblies
LH Actuator Assembly: NSN: 1680-01-160-6520UC  PN: 177560-32
RH Actuator Assembly: NSN: 1680-01-160-6519UC  PN: 177560-33
LH Actuator Assembly:  NSN: 1680-01-237-0231UC  PN: 177560-34
RH Actuator Assembly: NSN: 1680-01-237-0230UC   PN: 177560-35

These actuator assemblies are part of the C-5 NLG Door Actuation System. The NLG doors consist of two inboard doors and two outboard doors and are actuated separately from the gear. When the NLG is extended, the doors are held open by the actuators, and when the landing gear is retracted, the actuators close the doors to enclose the landing gear and streamline the aircraft. 

This overhaul effort will utilize a Requirements Type Contract. Contract period of performance will be five (5) years. It will consist of a one (1) year basic period and four (4) one (1) year ordering periods. The Best Estimated Quantities for each ordering period are listed below. The USAF anticipates the acquisition will be Full and Open Competition utilizing the Lowest Price Technically Acceptable (LPTA).

NSN 1680-01-160-6520UC
YEAR                     BEQ         
Basic                       10         
Ordering Period 1     9        
Ordering Period 2    10         
Ordering Period 3     9        
Ordering Period 4    10

NSN 1680-01-160-6519UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0231UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0230UC
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10 

The Government owns the technical data package. Interested parties shall be registered in the Joint Certification Program and approved to view Export Control, and shall submit evidence of their certification in order to obtain the associated technical data packages. 

To obtain copies of the bidset documents, an interested vendor shall be registered in the Joint Certification Program (JCP). Interested vendors are to request copies of the bidsets by providing their CAGE number to both Alyssa Tanner (alyssa.tanner.1@us.af.mil) and Stacylee Johnson (stacylee.johnson.1@us.af.mil) to verify registration in JCP. Upon verification, bidset zip files will be sent via the "DOD Safe" website. 

To become registered in the JCP, interested vendors can do so at the following website: 

https://www.dla.mil/logistics-operations/services/joint-certification-program/ 

The RFP and attachments are included within the attachments area of this solicitation. All attachments are attached separately for convenience. 

 All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and all amendments/revisions.

Contact Alyssa Tanner, Contract Specialist, and Stacylee Johnson, Contracting Officer, for questions or clarification.  Questions will ONLY be received via E-mail.  Phone calls are not acceptable, and voice mail will not be answered nor returned.

All questions will be answered via a Question and Answers (Q&A) document posted on SAM.gov attachment added to this posting and noted below in this description with the date it was updated.

Alyssa Tanner, alyssa.tanner.1@us.af.mil

Stacylee Johnson, stacylee.johnson.1@us.af.mil

Completed Request for Proposal responses and documents are due 5:00 PM EST, 20 JUL 2026

Update #3 ·

AMENDMENT FA853826R0012 01, is issued to update the unit of measure and pricing columns for all Repair/BER line items, fully incorporate the cybersecurity compliance clause text, and refresh standard regulatory clauses. The proposal submission deadline remains unchanged and is 20 July 2026.

C-5 Nose Landing Gear (NLG) Door Actuators Assemblies
LH Actuator Assembly: NSN: 1680-01-160-6520UC  PN: 177560-32
RH Actuator Assembly: NSN: 1680-01-160-6519UC  PN: 177560-33
LH Actuator Assembly:  NSN: 1680-01-237-0231UC  PN: 177560-34
RH Actuator Assembly: NSN: 1680-01-237-0230UC   PN: 177560-35

These actuator assemblies are part of the C-5 NLG Door Actuation System. The NLG doors consist of two inboard doors and two outboard doors and are actuated separately from the gear. When the NLG is extended, the doors are held open by the actuators, and when the landing gear is retracted, the actuators close the doors to enclose the landing gear and streamline the aircraft. 

This overhaul effort will utilize a Requirements Type Contract. Contract period of performance will be five (5) years. It will consist of a one (1) year basic period and four (4) one (1) year ordering periods. The Best Estimated Quantities for each ordering period are listed below. The USAF anticipates the acquisition will be Full and Open Competition utilizing the Lowest Price Technically Acceptable (LPTA).

NSN 1680-01-160-6520UC
YEAR                     BEQ         
Basic                       10         
Ordering Period 1     9        
Ordering Period 2    10         
Ordering Period 3     9        
Ordering Period 4    10

NSN 1680-01-160-6519UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0231UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0230UC
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10 

The Government owns the technical data package. Interested parties shall be registered in the Joint Certification Program and approved to view Export Control, and shall submit evidence of their certification in order to obtain the associated technical data packages. 

To obtain copies of the bidset documents, an interested vendor shall be registered in the Joint Certification Program (JCP). Interested vendors are to request copies of the bidsets by providing their CAGE number to both Alyssa Tanner (alyssa.tanner.1@us.af.mil) and Stacylee Johnson (stacylee.johnson.1@us.af.mil) to verify registration in JCP. Upon verification, bidset zip files will be sent via the "DOD Safe" website. 

To become registered in the JCP, interested vendors can do so at the following website: 

https://www.dla.mil/logistics-operations/services/joint-certification-program/ 

The RFP and attachments are included within the attachments area of this solicitation. All attachments are attached separately for convenience. 

 All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and all amendments/revisions.

Contact Alyssa Tanner, Contract Specialist, and Stacylee Johnson, Contracting Officer, for questions or clarification.  Questions will ONLY be received via E-mail.  Phone calls are not acceptable, and voice mail will not be answered nor returned.

All questions will be answered via a Question and Answers (Q&A) document posted on SAM.gov attachment added to this posting and noted below in this description with the date it was updated.

Alyssa Tanner, alyssa.tanner.1@us.af.mil

Stacylee Johnson, stacylee.johnson.1@us.af.mil

Completed Request for Proposal responses and documents are due 5:00 PM EST, 20 JUL 2026

Update #2 ·

C-5 Nose Landing Gear (NLG) Door Actuators Assemblies
LH Actuator Assembly: NSN: 1680-01-160-6520UC  PN: 177560-32
RH Actuator Assembly: NSN: 1680-01-160-6519UC  PN: 177560-33
LH Actuator Assembly:  NSN: 1680-01-237-0231UC  PN: 177560-34
RH Actuator Assembly: NSN: 1680-01-237-0230UC   PN: 177560-35

These actuator assemblies are part of the C-5 NLG Door Actuation System. The NLG doors consist of two inboard doors and two outboard doors and are actuated separately from the gear. When the NLG is extended, the doors are held open by the actuators, and when the landing gear is retracted, the actuators close the doors to enclose the landing gear and streamline the aircraft. 

This overhaul effort will utilize a Requirements Type Contract. Contract period of performance will be five (5) years. It will consist of a one (1) year basic period and four (4) one (1) year ordering periods. The Best Estimated Quantities for each ordering period are listed below. The USAF anticipates the acquisition will be Full and Open Competition utilizing the Lowest Price Technically Acceptable (LPTA).

NSN 1680-01-160-6520UC
YEAR                     BEQ         
Basic                       10         
Ordering Period 1     9        
Ordering Period 2    10         
Ordering Period 3     9        
Ordering Period 4    10

NSN 1680-01-160-6519UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0231UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0230UC
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10 

The Government owns the technical data package. Interested parties shall be registered in the Joint Certification Program and approved to view Export Control, and shall submit evidence of their certification in order to obtain the associated technical data packages. 

To obtain copies of the bidset documents, an interested vendor shall be registered in the Joint Certification Program (JCP). Interested vendors are to request copies of the bidsets by providing their CAGE number to both Alyssa Tanner (alyssa.tanner.1@us.af.mil) and Stacylee Johnson (stacylee.johnson.1@us.af.mil) to verify registration in JCP. Upon verification, bidset zip files will be sent via the "DOD Safe" website. 

To become registered in the JCP, interested vendors can do so at the following website: 

https://www.dla.mil/logistics-operations/services/joint-certification-program/ 

The RFP and attachments are included within the attachments area of this solicitation. All attachments are attached separately for convenience. 

 All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and all amendments/revisions.

Contact Alyssa Tanner, Contract Specialist, and Stacylee Johnson, Contracting Officer, for questions or clarification.  Questions will ONLY be received via E-mail.  Phone calls are not acceptable, and voice mail will not be answered nor returned.

All questions will be answered via a Question and Answers (Q&A) document posted on SAM.gov attachment added to this posting and noted below in this description with the date it was updated.

Alyssa Tanner, alyssa.tanner.1@us.af.mil

Stacylee Johnson, stacylee.johnson.1@us.af.mil

Completed Request for Proposal responses and documents are due 5:00 PM EST, 20 JUL 2026

Update #1 ·

C-5 Nose Landing Gear (NLG) Door Actuators Assemblies
LH Actuator Assembly: NSN: 1680-01-160-6520UC  PN: 177560-32
RH Actuator Assembly: NSN: 1680-01-160-6519UC  PN: 177560-33
LH Actuator Assembly:  NSN: 1680-01-237-0231UC  PN: 177560-34
RH Actuator Assembly: NSN: 1680-01-237-0230UC   PN: 177560-35

These actuator assemblies are part of the C-5 NLG Door Actuation System. The NLG doors consist of two inboard doors and two outboard doors and are actuated separately from the gear. When the NLG is extended, the doors are held open by the actuators, and when the landing gear is retracted, the actuators close the doors to enclose the landing gear and streamline the aircraft. 

This overhaul effort will utilize a Requirements Type Contract. Contract period of performance will be five (5) years. It will consist of a one (1) year basic period and four (4) one (1) year ordering periods. The Best Estimated Quantities for each ordering period are listed below. The USAF anticipates the acquisition will be Full and Open Competition utilizing the Lowest Price Technically Acceptable (LPTA).

NSN 1680-01-160-6520UC
YEAR                     BEQ         
Basic                       10         
Ordering Period 1     9        
Ordering Period 2    10         
Ordering Period 3     9        
Ordering Period 4    10

NSN 1680-01-160-6519UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0231UC 
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10

NSN: 1680-01-237-0230UC
YEAR                   BEQ         
Basic                      10         
Ordering Period 1    9        
Ordering Period 2    10         
Ordering Period 3     9         
Ordering Period 4    10 

The RFP and attachments are included within the attachments area of this solicitation. NO HARDCOPIES WILL BE PROVIDED. The technical data required to respond to the RFP may be obtained at the same website. All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. Offerors are encouraged to register on the site to receive notifications regarding the solicitation and all amendments/revisions. All attachments are attached separately for convenience.

Contact Alyssa Tanner, Contract Specialist, and Stacylee Johnson, Contracting Officer, for questions or clarification.  Questions will ONLY be received via E-mail.  Phone calls are not acceptable, and voice mail will not be answered nor returned.

All questions will be answered via a Question and Answers (Q&A) document posted on SAM.gov attachment added to this posting and noted below in this description with the date it was updated.

Alyssa Tanner, alyssa.tanner.1@us.af.mil

Stacylee Johnson, stacylee.johnson.1@us.af.mil

Completed Request for Proposal responses and documents are due 5:00 PM EST, 20 JUL 2026

Files

File Type Posted
RFP Questions and Answers.pdf PDF
CrossReferenceMatrixFA853826R0012.pdf PDF
FA853826R0012 03.pdf PDF
RFP Questions and Answers.pdf PDF
FA853826R0012 02 Amendment.pdf PDF
FA853826R0012 01 Amendment.pdf PDF
A004_ACCIDENT_INCIDENT_REPORT.pdf PDF
A003_CDM_PRODUCTION_REPORT.pdf PDF
A005_RFV.pdf PDF
AFMC158PackagingRequirements.pdf PDF
GFPAttachment.pdf PDF
A006_IUID.pdf PDF
A007_GIDEPALERT.pdf PDF
PWS.pdf PDF
A002_CAV.pdf PDF
A001_GOVT_PROPERTY_INVENTORY_REPORT.pdf PDF
DDFORM1653TransporationRequirements.pdf PDF
FA853826R0012 Solicitation.pdf PDF
Show all 18

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
C-5 Nose Landing Gear Door Actuator Assemblies Pre-Solicitation
C-5 Nose Landing Gear Door Actuator Assemblies Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
C-5 Brake Hydraulic NAICS 336413 Aviation No set-aside
C-130 Pison, Linear Actua NAICS 336413 Aviation No set-aside
RFP- FD20301901983_FA811824R0035 -0003 OH B2 ACTUATORS (Amendment -0003 ) Tinker AFB, Oklahoma 73145, United States · NAICS 336413 Air Force Sustainment Center No set-aside
C-130, C-17 and C-5 Solid State Cockpit Voice Recording (SSCVR) and Solid-State Flight Data Recorder (SSFDR) and Amplifier Control Unit (ACU) United States · NAICS 334511 Air Force Sustainment Center No set-aside
Remanufacture of B-2 Actuator, Electromechanical, Rotary United States · NAICS 336413 Air Force Sustainment Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity