Boiler Preventative & Corrective Maintenance Services
Closed Solicitation Posted
- Solicitation number
- SM-382236
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- PSC
- J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
- Place of performance
- Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory seeks preventative and corrective maintenance services for heating boiler systems, with proposals due September 4, 2026. This is a subcontract opportunity under Fermi Forward Discovery Group, LLC's prime contract with DOE; no set-aside applies.
Place of performance is Batavia, Illinois, with work focused on boiler systems at the New Muon Lab (NML) and Central Utility Building (CUB). The period of performance runs from October 1, 2026, through September 30, 2031. The NAICS code is 811310, Commercial and Industrial Machinery and Equipment Repair and Maintenance; PSC is J041.
Preventative maintenance services include scheduled inspections, cleaning, testing, calibration, adjustment, and system documentation. Corrective maintenance requires boilermaker services to disassemble, clean, and reassemble designated boilers at NML and CUB, followed by startup, tuning, and return to service. The subcontractor furnishes all qualified personnel, supervision, tools, equipment, transportation, and materials. Inspectors performing boiler inspection services must hold A-Stamp, PP-Stamp, or H-Stamp certifications per National Board rules. All personnel must comply with federal, state, local, and Fermilab safety requirements, including 10 CFR 851, 10 CFR 835, OSHA standards, and NFPA codes. A competent person must be on-site at all times. Subcontractors must maintain experience modification ratings below 1.0 and safety records within 85% of Bureau of Labor Statistics benchmarks.
Preventative maintenance shall be proposed on a Firm Fixed Price basis per inspection visit; corrective maintenance on a Time & Material basis with pre-established labor rates and materials billed at cost or markup. All corrective work requires prior written approval. Evaluation assesses technical acceptability across three subfactors: relevant experience (minimum three years performing similar boiler maintenance with trained, certified technicians), technical approach and methodology (detailed work plan complying with industry standards and FFDG safety requirements), and quality control procedures with comprehensive reporting. Offerors must submit an Environmental, Safety & Health corporate program, a Corporate Quality Control Plan, and a Project Quality Control Plan due within ten working days of award. Wage determination applies under the Service Contract Act for Illinois counties Cook, DuPage, McHenry, De Kalb, and Kane. Insurance requirements include $1 million Commercial General Liability per occurrence, $1 million Automobile Liability combined single limit, $1 million Excess/Umbrella Liability, and statutory Illinois Workers' Compensation with $1 million Employer's Liability. Amendment 02 (posted August 26) changed the procurement specialist to Caroline Jones at cjones@fnal.gov.
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT 02
This Amendment serves as formal notice that Request for Proposal (RFP) No. 382236-SM changes:
FROM:
PROCUREMENT SPECIALIST
Name: Seth Mercil
Email Address: smercil@fnal.gov
TO:
PROCUREMENT SPECIALIST
Name: Caroline Jones
Email Address: cjones@fnal.gov
All other information remains unchanged.
**************************************************************************
The subcontractor shall provide preventative and corrective maintenance services for all heating boilers identified in the contract attachments. Services include scheduled inspections, cleaning, testing, calibration, adjustment, and repair of boiler systems and associated components to ensure safe, reliable, and efficient operation. The subcontractor shall furnish all qualified personnel, supervision, tools, equipment, transportation, and materials necessary to perform the work, including boilermaker services required to disassemble, clean, and reassemble designated boilers at the New Muon Lab (NML) and Central Utility Building (CUB), followed by startup, tuning, and return to service. The subcontractor shall comply with all applicable federal, state, local, and Fermilab safety requirements, provide all required inspection and corrective maintenance reports, maintain service documentation, and perform all work in accordance with the preventative maintenance schedules and requirements contained in the contract attachments.
Update #1 ·
The subcontractor shall provide preventative and corrective maintenance services for all heating boilers identified in the contract attachments. Services include scheduled inspections, cleaning, testing, calibration, adjustment, and repair of boiler systems and associated components to ensure safe, reliable, and efficient operation. The subcontractor shall furnish all qualified personnel, supervision, tools, equipment, transportation, and materials necessary to perform the work, including boilermaker services required to disassemble, clean, and reassemble designated boilers at the New Muon Lab (NML) and Central Utility Building (CUB), followed by startup, tuning, and return to service. The subcontractor shall comply with all applicable federal, state, local, and Fermilab safety requirements, provide all required inspection and corrective maintenance reports, maintain service documentation, and perform all work in accordance with the preventative maintenance schedules and requirements contained in the contract attachments.
Files
Show all 17
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PIP-II f-37 building LWC pump room piping system installation | Fermi National Accelerator Laboratory | No set-aside | |
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside | |
| 16292 Steam Boiler Replacement | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity