SOW Attachment 3. ELECTRIC_BOILER_REVISED_05282020.pdf
PDF 53 KB Posted
- Solicitation number
- SM-382236
About this file
This is a boiler maintenance punch list for electric water boilers that must be ready for operation by October 1. A qualified boiler contractor is required to perform an annual inspection following the manufacturer's recommendations.
The maintenance checklist for water boilers includes: performing lockout-tagout (LOTO) of electrical power with NFPA 70E training documentation; inspecting covers, removable panels, process piping, fittings, and flanges; checking power entrance lugs and contactors for tightness and condition; inspecting all wiring, insulation, fuses, and overloads; examining heating elements for corrosion and water leakage; checking heat element fasteners and lugs; using an ohmmeter to verify balanced resistance between phases on the load side of heat element contactors; using a megger (500VDC minimum) to check contactor load side terminals to ground, noting any readings below 1 megohm; inspecting all gasketing for leaks; examining pressure vessel interior for scaling and corrosion; checking operating and limit controls; testing boiler pressure and temperature gauges; testing pressure relief valve operation for proper flow and leak tightness using lift test method; and providing documentation of findings for A.S.M.E. CSD-1 compliance with demonstrated familiarity with this standard. The contractor must have a volt-ohm meter (VOM) and megohmeter available. Water pump tasks include checking boiler recirculating and bypass pump operation and reporting unusual findings. In-house crafts are to check HWS pump rotation, motor mounts, amperes, and bearings, and tighten all pump electrical connections.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRIC BOILERS
HAVE A QUALIFIED BOILER CONTRACTOR PERFORM AN ANNUAL INSPECTION OF BOILER FOLLOWING
MANUFACTURER'S RECOMMENDATION. BOILER TO BE READY FOR OPERATION BY OCTOBER 1.
BOILER MAINTENANCE PUNCH LIST:
WATER BOILERS
• PERFORM LOCK OUT- TAG OUT (LOTO) ELECTRICAL POWER TO BOILER // LOTO 2 AND
DOCUMENTATION OF NFPA 70E TRAINING
• CHECK CONDITION OF ALL COVERS AND REMOVABLE PANELS
• INSPECT PROCESS PIPING, FITTINGS AND FLANGES
• CHECK TIGHTNESS AND CONDITION OF POWER ENTRANCE LUGS AND CONTACTORS ON
LINE AND LOAD SIDES
• INSPECT ALL WIRING, INSULATION, FUSES AND OVERLOADS
• INSPECT HEATING ELEMENTS, CHECK FOR COROSION AND WATER LEAKAGE
• CHECK HEAT ELEMENT FASTENERS AND LUGS FOR TIGHTNESS
• USING AN OHMMETER CHECK FOR BALANCED RESISTANCE BETWEEN PHASES ON LOAD SIDE OF
THE HEAT ELEMENT CONTACTORS // VENDOR TO HAVE VOM AND SKILL TO USE
• USING A MEGGER (500VDC MIN) CHECK CONTACTOR LOAD SIDE TERMINALS TO GROUND
NOTE ANY READINGS < 1 MEGOHM // VENDOR TO HAVE MEGOHMETER FOR SPECIFIED
MINIMUM
• CHECK ALL GASKETING FOR LEAKS
• INSPECT PRESSURE VESSLE INTERIOR CHECK FOR SCALING AND COROSION
• CHECK ALL OPERATING AND LIMIT CONTROLS
• CHECK BOILER PRESSURE AND TEMPERATURE GAGES FOR PROPER OPERATION
• CHECK PRESSURE RELIEF VALVE OPERATION TEST FOR PROPER FLOW AND LEAK TIGHTNESS //
LIFT TEST METHOD TO BE UTILIZED
• CHECK ALL OPERATING AND LIMIT CONTROLS // PER MANUFACTURER RECOMMENDATIONS
• RESTORE OPERATION PENDING SATISFACTORY CHECK OUT
• PROVIDE DOCUMENTATION OF FINDINGS FOR A.S.M.E. CSD-1 COMPLIANCE // DOCUMENTED
OR DEMONSTRATED FAMILIARITY WITH THIS STANDARD
WATER PUMPS
• CHECK BOILER RECIRCULATING PUMPS AND BYPASS PUMP OPERATION
• REPORT ANY UNUSUAL FINDINGS
IN HOUSE CRAFTS TO:
• CHECK HWS PUMP ROTATION
• CHECK PUMP MOTOR MOUNTS
• CHECK PUMP AMPERES
• CHECK BEARINGS
• TIGHTEN ALL PUMP ELECTRICAL CONNECTION