SOW Attachment 2. CONDENSING_BOILERS_REVISED_05272020.pdf
PDF 59 KB Posted
- Solicitation number
- SM-382236
About this file
This document is a boiler maintenance task list specifying annual inspection and maintenance requirements for condensing water boilers to be completed by a qualified boiler contractor, with the boiler ready for operation by October 1.
The maintenance scope for water boilers includes comprehensive inspections and tests across multiple systems: LOTO procedures with NFPA 70E training; inspection of covers, panels, interior, and combustion chamber; cleaning of condensate trap and heat exchanger with static pressure and flue gas CO testing; verification of condensate neutralizer pH compliance with Warrenville and Batavia limits using pH meters and test strips; gas and water piping leak detection using electronic gas leak detection tools; flue gas vent piping inspection for proper 0.25-inch-per-foot pitch; ignition and flame sense electrode cleaning; boiler wiring and control system inspection; makeup water system verification including 30% propylene glycol/water mix testing with glycol tester tools; expansion tank and fluid level checks; pressure and temperature gauge verification; pressure relief valve lift testing; gas supply line pressure documentation with manometers; high and low gas pressure safety control verification; burner control and flame condition checks; flame signal strength testing with VOM; flue piping leakage and restriction evaluation; carbon monoxide room testing to ensure 0 PPM using carbon monoxide testers; combustion analysis with analyzer tools; and A.S.M.E. CSD-1 compliance documentation with demonstrated familiarity with this standard. Water pump maintenance tasks include checking boiler recirculating and bypass pump operation, with in-house craft responsibilities for HWS circulating pump rotation, motor mount, amperage, bearing, and electrical connection checks.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONDENSING BOILERS
HAVE A QUALIFIED BOILER CONTRACTOR PERFORM AN ANNUAL INSPECTION OF BOILER FOLLOWING
MANUFACTURER'S RECOMMENDATION. BOILER TO BE READY FOR OPERATION BY OCTOBER 1.
BOILER MAINTENANCE TASK LIST:
WATER BOILERS
• PERFORM LOCK OUT- TAG OUT (LOTO) ON GAS AND ELECTRICAL POWER TO BOILER // LOTO 2
AND NFPA 70E TRAINING AND DOCUMENTATION
• INSPECT ALL COVERS AND REMOVABLE PANELS
• INSPECT BOILER INTERIOR
• CLEAN CONDENSATE TRAP
• CHECK CONDENSATE NEUTRALIZER IF INSTALLED //pH METER AND TEST STRIPS REQUIRED, pH
MUST COMPLY WITH WARRENVILLE AND BATAVIA LIMITS
• CHECK ALL GAS AND WATER PIPING FOR LEAKS // ELECTRONIC GAS LEAK DETECTION TOOL
REQUIRED
• VISUALLY INSPECT FLUE GAS VENT PIPING FOR RESTRICTIONS AND PROPER PITCH // 0.25 INCH
PER FOOT & A VISUAL INSPECTION
• INSPECT AND CLEAN IGNITION AND FLAME SENCE ELECTRODES
• INSPECT ALL BOILER WIRING AND INTERNAL CONTROLS
• INSPECT AND CLEAN HEAT EXCHANGER: STATIC PRESSURE TEST, VISUAL INSPECTION, FLUE GAS
CO CHECK
• INSPECT COMBUSTION CHAMBER AND GASKETING
• CHECK MAKEUP WATER SYSTEM NOTE: (SOME REQUIRE 30% PROPYLENE GLYCOL/WATER MIX)
// GLYCOL TESTER TOOL NEEDED
• CHECK EXPANSION TANK AND FLUID LEVEL
• CHECK BOILER PRESSURE AND TEMPERATURE GAGES FOR PROPER OPERATION
• CHECK PRESSURE RELIEF VALVE OPERATION VIA LIFT TEST / TEST FOR PROPER FLOW AND LEAK
TIGHTNESS
• CHECK GAS SUPPLY LINE PRESSURE // DOCUMENT MANIFOLD AND GAS LINE PRESSURE WITH
MANOMETER
• CHECK ALL OPERATING AND LIMIT CONTROLS
• CHECK OPERATION OF HIGH & LOW GAS PRESSURE SAFETY CONTROLS
• TEST FIRE BOILER // FOLLOW MANUFACTURER RECOMMENDATIONS FOR TEMPERATURE RATE
OF RISE TO PREVENT METAL STRESS / TUBE SHEET LEAKS
• TEST OPERATION OF LOW WATER CUT OUT MANUAL RESET
• CHECK OPERATION OF BURNER CONTROL
• CHECK VISUALLY FOR FLAME CONDITION
• CHECK FLAME SIGNAL STRENGTH WITH VOM
• CHECK FLUE PIPING FOR LEAKAGE AND RESTRICTIONS: VISUAL AND CO DETECTOR
• PERFORM CARBON MONOXIDE TEST IN BOILER ROOM TO ENSURE 0 PPM // VENDOR TO HAVE
CARBON MONOXIDE TESTER AND CAPABILITY TO USE
• PERFORM COMBUSTION ANALYSIS // COMBUSTION ANALYZER TOOL REQUIRED
• PROVIDE DOCUMENTATION OF FINDINGS FOR A.S.M.E. CSD-1 COMPLIANCE //DOCUMENTED
AND DEMONSTRATED FAMILIARITY WITH THIS STANDARD
WATER PUMPS
• CHECK BOILER RECIRCULATING PUMP AND THE BYPASS PUMP OPERATION
• REPORT ANY UNUSUAL FINDINGS
IN HOUSE CRAFTS TO:
• CHECK HWS CIRCULATING PUMP ROTATION
• CHECK PUMP MOTOR MOUNTS
• CHECK PUMP AMPERES
• CHECK BEARINGS
• TIGHTEN ALL PUMP ELECTRICAL CONNECTION