The Federal Highway Administration's Central Federal Lands Highway Division solicited bids for the AZ NFSR 289 Bridge Replacement project, a comprehensive infrastructure project involving the removal of an existing single-lane concrete slab bridge built in 1956 and construction of a new single-span bridge over Tonto Creek in the Tonto National Forest near Payson, Arizona. The project scope includes roadway reconstruction, sidewalk installation, and Horton Springs Parking Lot improvements to enhance pedestrian and vehicular safety and access to recreational sites. Key contract requirements mandated that all bidders register in the System for Award Management (SAM), comply with small business subcontracting goals, adhere to environmental restrictions on water sourcing from local creeks and facilities, and follow specific construction protocols including form liner designs matching existing stone masonry and concrete coating specifications. The solicitation utilized full and open competition with a HUBZone price evaluation preference, and bidders were required to submit sealed bids by November 19, 2025, with questions accepted through November 18, 2025, supported by multiple amendments issued on November 4 and November 14 to clarify technical requirements and provide updated plan sheets. The contract applied to firms under NAICS code 237310 (Highway, Street & Bridge Construction) with a small business size standard of $45 million.

This solicitation included no set-aside designations and represented an open market opportunity with no incumbent contractor identified. The project carried an Engineer's Estimate of $3,560,500, with responsive bids ultimately ranging from $4,188,530.51 to $6,055,585.50 across six qualified contractors, indicating actual construction costs exceeded initial projections. Principal work items included removal of the existing two-span bridge, excavation of 3,600 cubic yards of roadway material, placement of 535 tons of asphalt concrete pavement, installation of 252 cubic yards of structural concrete, and deployment of 448 linear feet of precast prestressed concrete box beams with reinforcing steel totaling 32,700 pounds. The contract performance location was Payson, Arizona 85541, with construction planned to minimize public traffic impacts by positioning the new roadway and bridge upstream (east) of the existing alignment. The project anticipated award in December 2025 following the November 19, 2025 bid opening.

Notice text

PROJECT NUMBER:AZ FS 289(1)

PROJECT NAME:AZ NFSR 289 BRIDGE REPLACEMENT

PROJECT DESCRIPTION:  The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289.

SCOPE OF THE WORK:  The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot.  This project includes removal of the existing two-span bridge, including removal of the existing pier.  The project also includes channel grading in Tonto Creek.  The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic.

PRINCIPAL WORK ITEMS:

  • 20304-2000 Removal of Bridge:  1 LPSM
  • 20401-0000 Roadway Excavation: 3,100 CUYD
  • 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD
  • 20441-0000 Waste: 2,300 SQFT
  • 30202-2000 Roadway Aggregate, Method 2: 750 TON
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON
  • 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD
  • 55201-0200 Structural Concrete, Class A (AE): 252 CUYD
  • 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT
  • 55401-1000 Reinforcing Steel: 14,200 LB
  • 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB
  • 55601-0900 Bridge Railing, Steel:  162 LNFT
  • 62801-000 Temporary Stream Diversion:  LPSM

ANTICIPATED SCHEDULE: 

Advertisement – October 2025

Award – December 2025

NTP – January 2026

Contract Completion – October 2026

Due to weather, no onsite work is anticipated between January and April 2026

ESTIMATED COST RANGE:  Total estimated cost between $2,000,000 and $5,000,000.

Files

Show all 15

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
AZ FS 289(1) AZ nfsr 289 bridge replacement Pre-Solicitation
AZ FS 289(1) AZ nfsr 289 bridge replacement Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside
AZ BL COLO 7528(1) Burro Creek Road Kingman, Arizona 86401, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity