QA. AZ NFSR 289 Bridge Replacement. 10.27.25.pdf

PDF 81 KB Posted

Attached to
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Solicitation number
6982AF25B000019
Issued by

About this file

This document is a Questions and Answers (Q&A) file for the AZ FS 289(1) AZ NFSR 289 Bridge Replacement project dated October 27, 2025. The Q&A addresses a specific technical detail about drilled shafts in Section 565, specifically clarifying the requirement for permanent steel casings. The response instructs contractors to embed permanent steel casings a minimum of two feet into the "soil-like bedrock" as specified on Sheet S3 and detailed in the Geotechnical Report, directing bidders to refer to the Geotechnical Report for additional information about the casing requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for AZ FS 289(1) AZ NFSR 289 Bridge Replacement

October 27, 2025

Questions Answers 1 Section 565 – Drilled Shafts includes an additional note which refers to permanent casings being embedded a minimum of 2’ into the “soil like sandstone layer”. Please clarify details on the apparent permanent casing requirement.”

Embed permanent steel casings a minimum of two feet into “soil-like bedrock” as shown on Sheet S3 and per the Geotechnical Report. Refer to the Geotechnical Report for additional information.