AZ FS 289(1) AZ nfsr 289 bridge replacement
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 6982AF-25-SS-000009
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Payson, Arizona 85541, United States
- Points of contact
-
- Stephanie Navarro cflacquisitions@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is seeking qualified prime contractors for the AZ FS 289(1) AZ NFSR 289 Bridge Replacement project, which involves reconstructing a portion of FR 289, removing an existing bridge, and constructing a new single-span bridge over Tonto Creek. The project requires experience in prefabricated steel bridge construction and will take place in a national forest environment. Interested contractors must submit specific documentation by June 17, 2025, including a statement of intent to bid, socioeconomic category certifications, a bonding agent letter demonstrating capacity for a $5 million project, and a list of comparable road construction projects in sensitive natural areas. Evaluation criteria will focus on firms' qualifications, bonding capabilities, and prior relevant experience in similar construction environments. The submission must be emailed to CFLAcquisitions@dot.gov with attention to Stephanie Navarro by 2 p.m. local Denver time on the specified due date.
The contract is not currently set aside for any specific small business category, but the agency is soliciting interest from small businesses, HUBZone small businesses, woman-owned small businesses, 8(a) small businesses, and service-disabled veteran-owned small businesses. The estimated project cost ranges between $2,000,000 and $5,000,000, with an anticipated advertisement in October 2025, contract award in December 2025, and completion by October 2026. The project scope includes significant construction elements such as 3,100 cubic yards of roadway excavation, 535 tons of asphalt concrete pavement, and 448 linear feet of precast, prestressed concrete box beams. No onsite work is expected between January and April 2026 due to weather conditions. All participating firms must be certified in the System for Award Management (SAM) and comply with Small Business Administration regulations regarding business size and affiliation.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Stephanie Navarro) for receipt by close of business (2 p.m. local Denver time) on June 17, 2025:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENTproject in which you performed work in a national forest, national park, national monument and/or natural resource sensitive area. Experience in prefabricated steel bridge construction is required. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
Project Details: AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge, and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic.
PRINCIPAL WORK ITEMS:
- 20304-2000 Removal of Bridge: 1 LPSM
- 20401-0000 Roadway Excavation: 3,100 CUYD
- 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD
- 20441-0000 Waste: 2,300 SQFT
- 30202-2000 Roadway Aggregate, Method 2: 750 TON
- 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON
- 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD
- 55201-0200 Structural Concrete, Class A (AE): 252 CUYD
- 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT
- 55401-1000 Reinforcing Steel: 14,200 LB
- 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB
- 55601-0900 Bridge Railing, Steel: 162 LNFT
- 62801-000 Temporary Stream Diversion: LPSM
ANTICIPATED SCHEDULE:
Advertisement – October 2025
Award – December 2025
Contract Completion – October 2026
Due to weather, no onsite work is anticipated between January and April 2026
ESTIMATED COST RANGE:
Total estimated cost between $2,000,000 and $5,000,000
Notice history
| Notice | Type | Posted |
|---|---|---|
| AZ FS 289(1) AZ nfsr 289 bridge replacement | Solicitation | |
| AZ FS 289(1) AZ nfsr 289 bridge replacement | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| Cisco Branch Ontonagon River Bridge Replacement | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity