AZ FS 289(1) AZ nfsr 289 bridge replacement
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 6982AF25B000019
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Payson, Arizona 85541, United States
- Points of contact
-
- Stephanie Navarro cflacquisitions@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Highway Administration is seeking contractors for the AZ NFSR 289 Bridge Replacement project, located in the Tonto National Forest approximately 18 miles east of Payson, Arizona. This pre-solicitation notice covers the replacement of the existing single-lane concrete slab Tonto Creek Bridge built in 1956, along with reconstruction of a portion of FR 289 and expansion of the Horton Springs Parking Lot to improve pedestrian and vehicular safety and access to recreational sites. The project will utilize full and open competition with HubZone price evaluation preference as the competition type. The scope includes removing the existing two-span bridge and constructing a new single-span bridge upstream of the current alignment to minimize traffic impacts, along with channel grading in Tonto Creek. Interested parties should note this is not an invitation for bid and plans and specifications are not yet available, with responses due by October 8, 2025.
This opportunity has no set-aside designation and will proceed under full and open competition. No incumbent contractors are identified in this pre-solicitation notice, and no specific contract value or budget range has been disclosed. Key quantities include 3,100 cubic yards of roadway excavation, 535 tons of asphalt concrete pavement, 252 cubic yards of structural concrete, and 448 linear feet of precast prestressed concrete box beams. The project falls under NAICS code 237310 for Highway, Street, and Bridge Construction and PSC category Y1LB for Construction of Highways, Roads, Streets, Bridges, and Railways. Additional work items encompass 14,200 pounds of reinforcing steel and 18,500 pounds of epoxy-coated reinforcing steel, indicating the substantial infrastructure nature of this bridge replacement project.
Notice text
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
COMPETITION TYPE: FULL AND OPEN COMPETITION WITH HUBZONE PRICE EVALUATION PREFERENCE
PROJECT NUMBER:AZ FS 289(1)
PROJECT NAME:AZ NFSR 289 BRIDGE REPLACEMENT
PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289.
SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic.
PRINCIPAL WORK ITEMS:
- 20304-2000 Removal of Bridge: 1 LPSM
- 20401-0000 Roadway Excavation: 3,100 CUYD
- 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD
- 20441-0000 Waste: 2,300 SQFT
- 30202-2000 Roadway Aggregate, Method 2: 750 TON
- 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON
- 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD
- 55201-0200 Structural Concrete, Class A (AE): 252 CUYD
- 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT
- 55401-1000 Reinforcing Steel: 14,200 LB
- 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB
- 55601-0900 Bridge Railing, Steel: 162 LNFT
- 62801-000 Temporary Stream Diversion: LPSM
Due to weather, no onsite work is anticipated between January and April 2026
ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| AZ FS 289(1) AZ nfsr 289 bridge replacement | Solicitation | |
| This notice | Pre-Solicitation | |
| AZ FS 289(1) AZ nfsr 289 bridge replacement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity