Add Cathodic Protection to Nautilus Pier
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- ACQR_5862208
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 238190 Other Foundation, Structure, and Building Exterior Contractors
- Place of performance
- Groton, Connecticut 06340, United States
Notice details come from SAM.gov. Updated .
Notice text
** This is a proposed task order under MACC Contracts Holders ML-C00048. Only those Contractors listed in the MACC Solicitation below will be allowed to bid on this requirement.
1. Asturian Group, Inc (N40085-16-D-3041)
2. Kondra & Jaquan Enterprises Inc/SAI - Joint Venture (N40085-16-3043)
3. SMART ATI/KBE Joint Venture (N40085-16-3044)
4. Tantara Corporation (N40085-16-D-3045)
The scope of this project is a Design Build Contract providing the following:
1. Site Visit: will include a meeting with the Contracting Officer and the Customer.
a. Conduct structure-to-electrolyte profiles as necessary (locations to be determined on site, it appears this will require a small boat to access piles)
b. Gather water depth information as necessary
c. Verify bulkhead continuity (end to end)
d. Take water samples for resistivity testing (required for design calculations)
2. Provide Basis of Design and Design Calculations for proposed Cathodic Protection system
3. Technical specifications for materials and installation
4. AutoCAD layout drawings of anodes with sizing, type, quantity and locations
5. General Installation Details
Boat schedule for construction window: Date may vary dependent on emergent repairs or delays of ongoing work at the dry-dock: Contractor shall base their work on this schedule: Pier is tentatively to be turned over to the contractor by November, 1 2021.
- Berth shift to pier 15S: Week of 18 October 2021
- Docking: 30 November 2021
- Undocking: 26 April 2022
- Berth shift back to Museum Site: Late May/Early June 2022
All work shall be completed by 1 May 2022, estimated at 270 calendar days after contract award.
Files
Show all 20
Notice history
| Notice | Type | Posted |
|---|---|---|
| Add Cathodic Protection to Nautilus Pier | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity