PRICE PROPOSAL FORM (Revised 19 JAN 2021)
ACQR 5835596
PROJECT TITLE: Lower Base Feeder R7P/R8P Repair LOCATION: Naval Submarine Base New London, Groton CT
REQUEST FOR PROPOSAL
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) price for the following items:
CLIN 0001 – BASE BID: Price for the all the work related to the removal of R7P/R8P Feeder and the reconnection to adjacent feeders in accordance with the drawings and specifications, but excluding work described in CLIN 0002, CLIN 0003, & CLIN 0004.
NOTE: The CLIN 0001 BASE PRICE is to include the cost to provide new conduit ductwork and remove asbestos-containing fire wrap, as noted in the specification and/or on the drawings. The CLIN 0002 and CLIN 0003 unit prices will be applied to the Contract Base Price accordingly where specified conditions exceed the BASE BID allocation.
DURATION: 540 DAYS
LIQUIDATED DAMAGES: $670 PER DAY
TOTAL PRICE FOR CLIN 0001 $
Note: Work must be completed no later than 23 September 2022 (based on estimated start date of 1 April 2021) or liquidated damages will be assessed. Completion date subject to change based on actual contract award and project start date.
CLIN 0002 – OPTION ITEM NUMBER 1: Price for providing all work related to replacing up to 500 LF of ductbanks where existing ducts are found to be damaged and conductors cannot be pulled-thru.
Estimated quantity is beyond what is already specified in the scope of work and/or on the drawings. Unit price will be used to execute modification for unforeseen damaged ductbank. Unit price is per 10 linear feet. Price is to be complete in accordance with the drawings and specifications, but excluding work described in CLIN 0001, CLIN 0003, and CLIN 0004.
10 LF $_________________ x 50 = $ ___________________
TOTAL PRICE FOR CLIN 0002 $ ___
CLIN 0003 – OPTION ITEM NUMBER 2: Price for providing all work related to the removal of up to 100 LF of asbestos-containing fire wraps. Estimated quantity is beyond what is already specified in the scope of work and/or on the drawings. Unit price will be used to execute modification for unforeseen additional asbestos-containing fire wraps. Unit price is per 5 linear feet. Price is to be complete in accordance with the drawings and specifications, but excluding work described in CLIN 0001, CLIN 0002, and CLIN 0004.
5LF $_________________ x 20 = $____________________
TOTAL PRICE FOR CLIN 0003 $ ____________________
PROJECT TITLE: Lower Base Feeder R7P/R8P Repair LOCATION: Naval Submarine Base New London, Groton CT
CLIN 0004 – OPTION ITEM NUMBER 3: Price for providing all work required to complete cable removal/replacement and transformer/switch changes, complete in accordance with the drawings and specifications, but excluding work described in CLIN 0001, CLIN 0002, and CLIN 0003.
TOTAL PRICE FOR CLIN 0004 $
TOTAL PRICE FOR ALL CLINs (0001-0004)
NOTES:
1. Award will be made on the total sum of all CLINs 0001 through 0004.
2. The Government reserves the unilateral right to award CLINs 0002, 0003, and 0004 to the contractor at the proposed price within 365 calendar days after contract award. A firm fixed proposed price is required for CLINs 0001 through 0004. No provision is made for economic price adjustment. If all options are exercised at time of award, the contract completion date remains 540 calendar days after award of the contract.
3. If CLINs 0002, 0003, and 0004 are exercised, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all CLINs.
4. Failure to enter a price for any of the CLINs will result in the proposal being rejected as unacceptable. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
5. Evaluation of Options (JUL 1990): Except when it is determined in accordance with FAR 17.206
(b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).
PROJECT TITLE: Lower Base Feeder R7P/R8P Repair LOCATION: Naval Submarine Base New London, Groton CT
AMENDMENTS ACKNOWLEDGED:
Amendment No. Date
0001 1 DEC 2020
0002 3 DEC 2020
0003 11 DEC 2020
0004 16 DEC 2020
0005 4 JAN 2021
0006 13 JAN 2021
0007 14 JAN 2021
0008 19 JAN 2021
Offeror:
Name:
Signed:
Date:
| Note: Work must be completed no later than 23 September 2022 (based on estimated start date of 1 April 2021) or liquidated damages will be assessed. Completion date subject to change based on actual contract award and project start date. |
| TOTAL PRICE FOR CLIN 0002 $ ___ |
| AMENDMENTS ACKNOWLEDGED: |