WWCX151009-RepairArcticFoundationB4002-SubmittalSchedule.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Repair Arctic Foundation Bldg 4002 (WWCX 15-1009) Pituffik Space Base, Greenland - Amendment 0001
- Solicitation number
- FA252325R0002
- Issued by
-
Department of the Air Force
About this file
The file is a Submittal Schedule for a Department of the Air Force contract (Solicitation Number: FA252325R0002) for repairing the arctic foundation of Building 4002 at Pituffik Space Base, Greenland. The project (WWCX 15-1009) requires comprehensive system repairs, including clearing arctic ducts and headers, installing new dampers, actuators, motors, controllers, and associated equipment to create a fully functional system.
The detailed submittal schedule outlines specific documentation and product data requirements with precise submission timelines. Key submissions include an AF Form 103 Work Clearance Request (14 days prior to site work), Final Progress Schedule (5 days after Notice to Proceed), environmental and safety plans, product data for various components (dampers, actuators, temperature sensors, electrical accessories), and supporting documentation like start-up reports, duct photos, and O&M manuals. The contractor is also required to provide 10% additional bench stock materials (bolts, nuts, washers, dampers, and actuators) for base maintenance, with all materials to be properly labeled with project details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| PROJECT NUMBER: WWCX 15-1009 | Award Date: | ||
| PROJECT TITLE: REPAIR ARCTIC FOUNDATION, B4002 | Notice to Proceed Date: | ||
| CONTRACT NUMBER: | Contract Completion Date: | Date Contractor Notified | |
| Description of Item | Required Submission Date (Calendar Days) | Contractor Submittal Number |
MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter submittal number.
(001, 002, etc.) Date Received in Contracting MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter date received from contractor.
(DD MMM YY) Date to Civil Engineering MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter date sent to CE for review.
(DD MMM YY) Return Suspense Date MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter date submittal is due back from CE.
(DD MMM YY) Approved MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter date contractor is notified of approval.
(DD MMM YY) Disapproved MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter date contractor is notified of disapproval.
(DD MM YY) Contractor Resubmittal Number MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter resubmittal number.
(001a, 001b, etc.) Final Approval MAKOWSKY, STEPHEN C NH-03 USAF SPOC 21 CONS/PKA: Enter final approval date if previously disapproved.
| (DD MMM YY) | Remarks | |
| AF Form 103, Work Clearance Request | 14 days prior to work on site | |
| Final Progress Schedule and Gantt chart | 5 days after NTP | |
| Green Procurement Determination Form | Prior to 100% Progress Report | |
| Warranty Documentation | Prior to 100% Progress Report | |
| Recovered Materials Estimate and Certification Form | Prior to 100% Progress Report | |
| Travel Documentation and Information | 28 days prior to work on site | |
| Fire Hydrant Connection Request | 14 days prior | |
| Vehiclal Registration and Passes | 14 days prior | |
| Accident Prevention Plan | As Required | |
| Activity Hazard Analysis | As Required | |
| Crane Critical Lift Plan | As Required | |
| Confined Space Entry Permit and Plan | As Required | |
| Hot Work Permit | As Required | |
| Hazardous Waste Disposition information | As Required | |
| Environmental Protection Plan | 14 days prior to work on site | |
| As-built drawings | Prior to 100% Progress Report | |
| Real Property Record, DD1354 | Prior to 100% Progress Report | |
| DAMPER, Product Data | 14 days prior to work on site | |
| ACTUATOR, Product Data | 14 days prior to work on site | |
| DUCT BAFFLE, Product Data | 14 days prior to work on site | |
| SEALANTS, Product Data | 14 days prior to work on site | |
| TEMPERATURE SENSOR, Product Data | 14 days prior to work on site | |
| CONTROLS, Shop Drawings | 14 days prior to work on site | |
| CONTROLS, Product Data | 14 days prior to work on site | |
| DISCONNECT, Product Data | 14 days prior to work on site | |
| ELECTRICAL ACCESSORIES, Product Data | 14 days prior to work on site | |
| FAN, Product Data | 14 days prior to work on site | |
| START-UP, Reports | Prior to 100% Progress Report | |
| DUCT PHOTOS, Report | Prior to 100% Progress Report | |
| O&M MANUALS, Manuals | Prior to 100% Progress Report |
&"Times New Roman,Bold"&24&USUBMITTAL SCHEDULE
Version date: 20 Oct 2021 &P of &N