Worksheet_for_Construction_Agreement_NWoodrowWilsonStSW.docx

DOCX document 38 KB Posted

Attached to
North Woodrow Wilson Street Sidewalk Improvements CDBG
Solicitation number
26-024EN-IFB
Issued by
Hillsborough County, Florida

About this file

This is a construction agreement worksheet for a project administered by the City of Tampa, Florida. The North Woodrow Wilson Street Sidewalk Improvements project, identified by solicitation number 26-024EN-IFB, proposes the addition of sidewalk on the east side of N. Woodrow Wilson Street from W. Lowry Avenue to the CSX railroad. Work scope includes flexible paving, grading, drainage, concrete sidewalks and driveways, stripping, signage, tree removal, sodding, and the replacement of an existing potable watermain and appurtenances, with coordination for relocation of underground private utilities. The project was designed by Madrid (CPWG) located at 5001 N. Nebraska Avenue, Tampa, FL 33603, with plans dated January 19, 2026. Construction shall commence within 14 calendar days of written notice to proceed, with substantial completion required on or before 90 calendar days after notice to proceed. A pre-construction meeting will be held at City Hall with a room to be determined. The contractor must prepare as-built drawings, and the City's Project Manager Herby Jean and Engineering & Utilities Department Inspectors will supervise construction activities.

The contract requires a performance bond due to the project cost exceeding $200,000 and involves federal funding through Community Development Block Grants (CDBG). Liquidated damages are assessed at $1,170 per day for failure to achieve substantial completion within the specified timeframe. The payment schedule will be processed monthly, with materials paid upon installation and inspection by the contractor. The contract price includes adjustable factors based on varying quantities or linear feet installed. No extended warranty beyond one year is required, and no third-party professional will review construction and payment requests. The project site is within fifty feet of operated CSX railroad tracks, which necessitates special coordination and compliance considerations during construction.

View the file

Other files

File Type Posted
26-024EN-IFB_Pre-Proposal_Meeting_Sign-in_Sheet.pdf PDF
Tampa_Times_Ad_legal_with_meeting.docx DOCX document
TAMPA_BAY_TIMES_AD_PLACEMENT_REQUEST_FORM_02.16.26.pdf PDF
North_Woodrow_Wilson_Street_Sidewalk_Improvements_CDBG.pdf PDF
FL20260252_WageDetermination.pdf PDF
HUD_24_CFR,_Part_75_Section_3.pdf PDF
BABA_FORM.pdf PDF
2026-03-20_N._Woodrow_Wilson_Sidewalk_Improvement_Construction_Contract.pdf PDF
[H]_CSX_Railroad_TROE_Location.pdf PDF
HUD_Form_4010_updated_10.2023.pdf PDF
[I]_ROW_Use_Permit_Application.pdf PDF
GC_and_Subcontractor_E-Verify_Affidavit_(07-12-23)CAO.pdf PDF
Federal_Debarment_Certification_Form_Final_(9-12-23).pdf PDF
Davis_Bacon_and_Section_3_Acknowledgment_Form.docx.pdf PDF
[B]_Construction_Plans-DS.pdf PDF
[A]_Project_Exhibits.pdf PDF
[G]_Material_&_Equipment_Storage_Site.pdf PDF
[D]_Technical_Manual_for_Water,_Wastewater_and_Reclaimed_Water_Utilities.pdf PDF
[F]_ERP_Project_Exemption_Approval_N_Woodrow_Wilson_Street_Sidewalk.pdf PDF
[C]_Technical_Specifications-DS.pdf PDF
[E]_Standards_Specs_for_Traffic_Control_Signals_&_Devices,_Signing,_Pavement_Marking,_and_Lighting_Construction.pdf PDF
Addition_to_Special_Provisions.docx DOCX document
Bid_Form.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Worksheet for Construction Agreement

1. Project name: North Woodrow Wilson Street Sidewalk Improvements

2. Documents to be incorporated into the contract: IFB, Project Exhibits

3. Solicitation number: 26-024EN-IFB

4. Are there construction plans? Yes

5. Was the project designed by an Architect or Engineer? Yes If yes, name and address of firm and date of plans:

Madrid (CPWG), 5001 N. Nebraska Avenue, Tampa, FL 33603. Date of Plans: 1/19/2026

6. Will the contractor prepare “as-built” drawings? _Yes ____ (Note: If “as-built” drawings are not required, standard paragraph 5(d) will be deleted and 7(K)4 will be modified in the contract

7. Will there be an outside A/E providing services during construction? No

8. If No. 7 is yes, name of A/E: N/A

9. Will the A/E be supervising the project? _N/A

10. Name of person from the City who will supervise construction? Herby Jean, Project Manager + Engineering & Utilities Department Inspectors

11. Construction shall commence within 14 calendar days of written notice to proceed.

12. Substantial completion shall be achieved on or before 90 calendar days after notice to proceed.

13. Amount of liquidated damages for non-compliance of substantial completion $1,170 per day.

14. If there is not a third-party professional reviewing construction and payment requests (not a design professional), who from the City will be reviewing payment requests? No

15. The payment schedule for this project will be: Monthly? X At final completion?

16. Does the contract price have adjustable factors, which may affect the price such as varying quantities installed or a price based on linear feet installed? Yes

17. Are materials on the project being paid for at the time of receipt and inspection, or installation and inspection? _Installation and Inspection – Paid by contractor

18. Is there is a warranty longer than one year? No

19. If yes, how long is the extended period? N/A

20. If a Surety Bond is required, will the bond will cover any extended warranty required? No

21. Insurance requirements are included in the solicitation document.

22. Is construction within fifty feet (50’) of any operated railroad track(s) or affecting any railroad bridge, trestle, tunnel, track(s), roadbed, overpass or underpass? Yes

23. Is a bond required? Yes

24. Is the cost expected to be over $200,000? Yes

25. Will Federal funds be used in this project? Yes

26. Will there be a pre-construction meeting? Yes

27. If yes, where will it be held? City Hall (Room TBD)

Form Revised 1/28/2021 ws

TO BE COMPLETED AFTER FIRM IS SELECTED:

1. Effective date of contract:

2. Name and address of the contractor:

3. What is the contract price?

4. Are there any addenda that will amend the original scope of services in the solicitation document?

5. Name and function of key supervisory personnel:

Name Function

6. Name, title and address of contractor’s representative signing contract: (Must be President or officer of the company)

7. Name, title and address of contractor’s representative to receive notices:

File details come from the government source that posted it. Updated .