This document is the Traffic Operations Department Standard Specifications manual for the City of Plant City, Florida, establishing requirements for traffic control signals, devices, signing, pavement marking, and lighting construction. The specifications apply to all traffic signal installations, updates, and maintenance within Plant City's jurisdiction and reference the FY 2024-25 Florida Department of Transportation Standard Specifications for Road and Bridge Construction with City-specific modifications and clarifications. The document covers Division II Construction Details for traffic control signals and devices (Sections 600-685), signing, pavement marking, and lighting (Sections 700-705), and Division III Materials for traffic control signal and device materials (Sections 995-996). Key requirements include compatibility with the City's ATMS.now central traffic management system, TS2 Type 1 ATC controller specifications, specific grounding and surge protection protocols using #4 AWG insulated green copper wire with exothermic welding connections, and detailed conduit, cable, and detection system installation standards. New signal installations must be placed in flash mode for 48 to 336 hours with portable changeable message signs provided ten working days prior to activation, followed by a 48-hour burn-in test conducted on Tuesday or Wednesday. The contractor bears responsibility for all traffic signal maintenance from project commencement through final acceptance, with a 90-day warranty period beginning after the 48-hour burn-in and mandatory two-hour response time to reported failures.

The specifications mandate that all materials comply with FDOT Approved Products List requirements or receive prior written City approval, with comprehensive technical details provided for signal heads, pedestrian assemblies, detection systems, controller cabinets, grounding systems, and internally illuminated street name signs. Street name signs must be fabricated from aluminum alloy 5052-H38 with specific sheeting types (ASTM D4956 Type II minimum for ground-mounted signs, Type III prismatic for overhead signs), mounted on square 2-1/4 inch galvanized steel posts with 7/16 inch diameter knockouts spaced at one-inch centers, and installed with minimum three feet of embedment. City streets require green background signs with white text and the City logo, while private streets use blue background without logos or block numbers. The document includes detailed specifications for Uninterruptible Power Supply systems, managed field Ethernet switches supporting 10-Gigabit connectivity with optical bypass functionality, pedestrian detection systems utilizing non-mechanical piezo switches meeting ADA requirements, and specialized equipment such as pedestrian hybrid beacon assemblies and rectangular rapid flashing beacons. All installations require coordination with the City of Plant City Traffic Operations Department, with signal timing provided by the Engineer of Record for updated installations and coordinated timing plans developed by City Traffic Operations for new signals in coordinated corridors.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Traffic Operations Department

Standard Specifications for Traffic Control Signals & Devices, Signing, Pavement

Marking, and Lighting Construction

OCTOBER 2025

PlantCityGov.com

October 2025 i

Accommodation Statement In accordance with the requirements of title II of the Americans with Disabilities Act of 1990 ("ADA”), The City of Plant City will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. People with disabilities who need accommodation for this document should contact the Plant City Risk Management Coordinator at (813) 659-4200 iiOctober 2025

THE CITY OF PLANT CITY

TRAFFIC OPERATIONS STANDARD

SPECIFICATIONS FOR TRAFFIC

CONTROL SIGNALS AND DEVICES,

SIGNING, PAVMENT MARKING AND

LIGHTING CONSTRUCTION

APPROVED

Traffic Operations Manager_______________ Effective Date:

October 2025 iii

The City of Plant City (CITY) utilizes the latest FDOT Standard Specifications for Road and Bridge Construction for Division I for General Requirements and Covenants.

For Division II, Construction Details, additional modifications to the FDOT Standard Specifications for Road and Bridge Construction in Series 600 and 700 are described at the beginning of each individual specification.

For Division III, Materials, additional modifications to the FDOT Standard Specifications for Road and Bridge Construction in Series 900 are also described at the beginning of each individual specification.

This Manual only covers Sections 600 – 685 for Traffic Control Signals and Devices, and Sections 700 – 705 for Signing, Pavement Marking and Lighting. Additionally, this manual covers Sections 995 – 996 for Traffic Control Materials.

TABLE OF CONTENTS

DIVISION I

GENERAL REQUIREMENTS AND COVENANTS

Refer to the latest FDOT Standard Specifications for Road and Bridge Construction.

DIVISION II

CONSTRUCTION DETAILS

TRAFFIC CONTROL SIGNALS AND DEVICES

600 Traffic Signal Overview

603 General Requirements for Traffic Control Signals and Devices

611 Acceptance Procedures for Traffic Control Signals and Devices

620 Grounding and Lighting Protection

630 Conduit

632 Signal Cable

633 Communication Cable

634 Span Wire Assembly

635 Pull, Splice, And Junction Boxes

639 Electrical Power Service Assemblies

641 Prestressed Concrete Poles

649 Galvanized Steel Poles, Mast Arms, And Monotube Assemblies

650 Vehicular Traffic Signal Assemblies

October 2025 iv

653 Pedestrian Signal Assemblies

654 Midblock Crosswalk Enhancement Assemblies

660 Vehicle Detection System

663 Signal Priority and Preemption Systems

665 Pedestrian Detection System

671 Traffic Controllers

676 Controller Cabinet Assemblies

684 Network Devices

685 Traffic Control System Auxiliaries

SIGNING, PAVEMENT MARKING AND LIGHTING

700 Highway Signing

705 Object Markers and Delineators

DIVISION III MATERIALSTRAFFIC CONTROL MATERIALS

995 Traffic Control Signal and Device Materials

996 Intelligent Transportation System Device Materials

APPENDICES

Appendix A: City of Plant City Minimum Requirements for Traffic Signs……………………….61

1October 2025

DIVISION II CONSTRUCTION

DETAILS

TRAFFIC CONTROL SIGNALS AND DEVICES

SECTION 600

TRAFFIC SIGNAL OVERVIEW

600-1 Traffic Signal Guidance: This document is the standard specification for traffic control signal and device installation in The City of Plant City, Florida. The sections reflect the FY 2024-25 edition of the Florida Department of Transportation Standard Specification for Road and Bridge Construction. Only deviations and/or clarifications will be noted. If no specific detail or clarification is provided, then the Florida Department of Transportation Standard Specification for Road and Bridge Construction is the standard to be followed.

- End of Section -

2October 2025

SECTION 603

GENERAL REQUIREMENTS FOR TRAFFIC CONTROL SIGNALS AND DEVICES

The following are changes, additions, or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

603-2.2 Exceptions:

Replace the first paragraph with the following paragraph

The City may grant an exception to the traffic control signals and devices requirements when in the interest of the public or the City, and to provide for advantages of new technology.

603-3 Definitions.

Add the following subsections

603-3.1 High Voltage: High voltage is defined in this document as any voltage higher than 48VAC.

603-3.2 Low Voltage: Low voltage is defined in this document as any voltage 48VAC or lower.

603-3.3 Substantial Completion: Installation is substantially complete when there are only minor discrepancies, and the stage of completion allows the installation to operate in a manner which is in accordance with the Contract Documents. All signals, pedestrian signals and signs, markings, wiring, loops, and video detection will be installed. Minor discrepancies, including duct seal on conduits, advance signal ahead signs, and overhead illuminated signs, may still be outstanding if the reason for lack of completion is significantly justified.

603-4 Systems Approval Requirement:

Replace the first paragraph with the following paragraph

The City of Plant City Traffic Operations Office will review and approve any system design plan of traffic control signals and devices, that is controlled or operated from a remote location by computers or similar devices, and which affects the movement of traffic on any portion of the City of Plant City Roadway System, prior to installation. The City of Plant City's current central Traffic Management system is the ATMS.now system. All controllers and controller cabinets along with associated equipment must be compatible and operate with the ATMS.now system.

3October 2025

603-5 Submittal Data Requirements.

Add the following subsections

603-5.1 Device Approval Process: The traffic control signal devices shall also be approved by The City of Plant City Traffic Operations Office.

Proprietary Products Letter

4October 2025

SECTION 611

ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

The following are changes, additions, or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

611-2.4 Installation Inspection Requirements:

Add the following subsections

611-2.4.1 The City of Plant City Inspection Procedure: Upon submittal of written notification that all Contract Work, or all Contract Work on the portion of the Contract scheduled for acceptance, has been completed, the City of Plant City representative will make an inspection for acceptance. The inspection will be made within five working days of such notification. If the City of Plant City representative finds that all work has been satisfactorily completed, the Department will consider such an inspection as the final inspection. If any or all of the Work is found to be unsatisfactory, the City of Plant City representative will detail the remedial work required to achieve acceptance. Immediately perform such remedial work. Upon submittal of written notification that the remedial work has been completed, the City of Plant City representative will make an inspection for acceptance within five working days of such notification. Subsequent inspections will be made on the remedial work until the City of Plant City representative accepts all Work.

611-2.4.1.1 New Signal Installations: New signals, where no signal previously existed, will be inspected when the signal is at a substantial level of completion. The electrical service release will be sent to the power company when the signal is determined to be at substantial completion by the City of Plant City representative or a deviation is granted by the Manager of Traffic Operations.

611-2.4.1.2 Updated Signal Installation: New signals, where a traffic signal previously existed and is still operational, will be inspected when the signal is at a substantial level of completion. The electrical service release will be sent to the power company when the signal is determined to be at substantial completion by the City of Plant City representative or a deviation is granted by the Manager of Traffic Operations. Release of power for the new signal may be completed if, in the opinion of the City of Plant City representative and their supervisor, it is necessary to maintain an operational traffic signal. The City of Plant City representative will perform a safety inspection to determine if the new signal is installed sufficiently to allow it to operate safely.

611-3 Signal Timing:

Add the following paragraph

Signal timings will be provided by the jurisdictional agency. The Engineer of Record will provide signal timings for updated signal installations when new timings are required. If no changes in phasing have occurred, the existing signal

5October 2025 timing sheet may be implemented at the time the signal is swapped over. Where a new traffic signal is being installed in a coordinated corridor, the Engineer of Record will provide basic timings, and The City of Plant City Traffic Operations (Traffic Operations Section) will provide the coordinated timing plan. The contractor, in all cases, will provide a minimum of ten working days’ notice prior to the activation of new or modified signals to allow sufficient time to review and/or create new timings for the traffic signal. The timings will be reviewed and/or created by The City of Plant City Traffic Operations or their applicable consultant.

611-4.1 Traffic Control Signal and Device Installation:

Replace the first item of the sixth paragraph with the following

1. Before beginning the 48-hour test, place all new signal installations (no existing signals) in flash for 48 to 336 hours. The length of the flash period will be determined by the Engineer of Record. Provide Portable Changeable Message Signs (PCMS) ten (10) working days prior to placing the signal in flash.

Coordinate with The City of Plant City's Traffic Operations Section for the required message to be displayed on the PCMSs.

Replace the fifth item of the sixth paragraph with the following

5. Start the 48-hour test on a Tuesday or Wednesday. Ensure the 48-hour test does not include weekends, Holidays, or Special Events

611-6.1 General Requirements:

Add the following paragraph

611-6.1 General Requirements: The contractor is responsible for all maintenance of traffic signals within the limits of the construction project from the date construction begins until all installation discrepancies (punch) list items have been corrected. The 90-day warranty period will begin at the end of the 48-hour burn-in period unless an equipment failure occurs during that 48-hour burn-in period. The 48-hour burn-in period is considered the first 48-hours after this traffic signal is first placed into full operation.

611-6.2 Contractor's Responsibilities Replace the second item with the following

2. Upon notification by the City of a malfunction, restore the equipment to proper operating conditions within two (2) hours after notification by the City. If the Contractor fails to restore the equipment to proper operating conditions within two (2) hours after notification, the City has the authority to have the remedial work performed by other forces. The Contractor is responsible for all incurred costs

6October 2025 of the work performed by other forces. Remedial work performed by other forces does not alter any of the requirements, responsibilities, or obligations of this warranty.

Add the following subsections

611-6.2.1 Responsibility for maintenance of existing traffic signals during construction:

The contractor is responsible for all maintenance of the traffic signal at commencement of the project. The maintenance of the traffic signal is defined as repair and/or replacement of any equipment or hardware failures which cause the traffic signal to operate abnormally. This will include any damage caused by accident or criminal behavior to any underground or aboveground traffic signal related facility. Once the replacement signal is operational, the responsibility for maintenance of the new traffic signal will continue to be the responsibility of the contractor until all of the discrepancies or punch list items have been corrected and the traffic signal has obtained final acceptance. The contractor will be required to respond to any traffic signal complaints from citizens, law enforcement and/or The City of Plant City's call center.

611-6.2.2 Responsibility for maintenance of a new traffic signal: The contractor is responsible for all maintenance of the new traffic signal from the moment the construction starts until all discrepancies or punch list items have been corrected and the traffic signal has obtained final acceptance. The contractor will be required to respond to any traffic signal complaints from citizens, law enforcement and/or The City of Plant City's call center.

611-6.2.3 Contractor's responsibility during the warranty period: The warranty period of 90 days commences after the 48-hour burn-in of the traffic signal. This is defined as 48 hours after the new traffic signal is fully activated. If a new signal is turned on prior to all functions of the traffic signal being fully serviceable, the warranty period will begin when the traffic signal has completed final acceptance. As an example: a new traffic signal that is replacing an existing traffic signal may have to be activated due to MOT reasons prior to the pedestrian signals being functional. In this case, the 90-day warranty period will commence when the pedestrian signals, all noted discrepancies and any other item not functional have been fully activated, have been corrected, and/or are fully functional. If the maintenance responsibility of the traffic signal has been turned over to The City of Plant City during the warranty period, the contractor will be responsible for the provisions identified in Section 611-6.2 of the Florida Standard for Road and Bridge Construction and as amended herein.

During any period when the contractor is responsible for maintenance of the signal, the contractor will respond to a reported traffic signal failure or operational problem within two hours. If the contractor fails to respond within the allotted period and the City responds to the failure or operational problem, the contractor is subject to back charges for the City's expenses.

7October 2025

SECTION 620

GROUNDING AND LIGHTING PROTECTION

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

620-3.1 General:

Add the following paragraphs

Meet all local electrical codes. Install insulated green No. 4 AWG copper wire for electrical or lightning protection ground from the system ground (electrical service ground rod) to all elements of the traffic signal (pedestrian poles, mast arms, steel pull box lids, etc.). No. 4 AWG insulated green copper wire will be used from the electrical service disconnect to the traffic signal controller ground.

The main ground wire from the meter panel to the ground rod will be #4 AWG solid copper wire.

All connections to ground rods and connections where multiple ground wires intersect will be exothermically welded. Connections in the meter can, electrical service disconnect, pedestrian poles, mast arms, traffic signal controller cabinet, etc. will be made with a crimped lug that is bolted to a grounding point or direct connection to a ground buss (typically found in the electrical service disconnect and controller cabinet).

All separately grounded elements at an intersection will be exothermically bonded together to form an intersection grounding network tied back to the primary ground on the electrical service meter panel. Install the primary ground rod assembly in an electrical pull box adjacent to the electric service meter panel.

Refer to the City of Plant City Power Service Detail in the construction plans for further guidance on grounding and surge protection devices.

8October 2025

SECTION 630

CONDUIT

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

630-3.1 General:

Add the following paragraph

The use of corrugated flexible conduits will not be allowed.

Add the following paragraph

All PVC conduits will have end bells installed prior to pulling any cable to protect the cable insulation from damage. If the installed end bells appear to be cut and installed after the cable is installed, the contractor will be required to pull the cable out of the conduit to allow the City to inspect the cable for damage.

Undamaged or new cable will be reinstalled at no expense to the City.

Add the following sentences to the thirteenth paragraph

When transitioning from underground PVC conduit to aboveground metal conduit, the transition will be with a threaded female adapter. A slip type fitting will not be acceptable on the metal conduit.

Replace the fourteenth paragraph with the following paragraph

Install 1250 lb. mule tape or equivalent the full length of all empty conduits that are designated for future use. There must be at least 36 inches of mule tape at each conduit termination point. The mule tape must be tied to a permanent object to avoid the mule tape from being inadvertently pulled out of the conduit. When all conduits are to remain empty, install a locate wire in accordance with 630-2.2 inside one of the conduits. Make locate wire splices in a flush grade-level box. Ensure that locate wire splices are waterproof and suitable for direct burial.

630-3.2 Conduit Sizes:

Add the following paragraphs

For pedestrian signal bases, provide two 2-inch PVC conduits (one (1) high voltage and one (1) low voltage) and one (1) 1-inch PVC conduit (ground). Route the conduits to the nearest associated pull box or as shown in the plans. For mast arm and steel strain pole foundations, provide a minimum of four (4) 2-inch and one (1) l-inch PVC conduits installed in the foundation. For all traffic signal

9October 2025 cabinets, provide fifteen (15) 2-inch and one (1) 1-inch conduits installed in the controller foundations.

The maximum allowable conduit fi11 ratio for each conduit is forty (40) percent.

630-3.5 Conduit Terminations:

Add the following paragraph

All conduits will have end bells installed at the terminating ends prior to any cables being pulled into the conduits. Rigid conduit will have a grounding bushing (if appropriate) or a PVC bushing on the rigid conduit end.

630-3.10 Route Markers:

Replace the fifth item with the following item

5. Markers are spaced a maximum of 600 feet apart.

10October 2025

SECTION 632

SIGNAL CABLE

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

632-3.1 Number of Conductors:

Replace the first paragraph with the following paragraph

The contractor will determine the number of conductors required for each signal and interconnect cable by utilizing the Contract Documents or contacting the City of Plant City representative.

Replace the second paragraph with the following subsections

632-3.1.1 Span Wire Installations: Provide a minimum of three spare conductors for each signal trunk cable used at all signal installations. Install the three spare conductors from the controller cabinet through each disconnect hanger (or traffic signal head) to the furthermost disconnect hanger (or traffic signal head). Provide a neutral for each direction or approach. Double (2-way) signal heads will not be allowed as this would cause two separate directions to share one neutral. The white conductor in the signal cable will be used for the neutral.

632-3.1.2 Mast Arm Installations: Provide two spare conductors for each signal head. Each signal head will have an individual cable from the mast arm hand hole to the signal head without any splices or breaks. All mast arms will have a hand hole terminal compartment with a stainless-steel equipped terminal strip provided by the manufacturer unless otherwise shown in the plans. Install a trunk cable continuously from the hand hole to the controller cabinet with at least three spare conductors.

If no hand hole exists in the mast arm, each signal head will have a continuous signal cable from the signal head to the controller cabinet with two spare conductors. Splices will not be allowed.

632-3.1.3 Pedestrian Signals: Provide two spare conductors for all pedestrian signals.

Pedestrian poles with a single pedestrian signal require a minimum of a 5-conductor signal cable. Pedestrian poles with a double (2-way) pedestrian signal require a minimum of a 9-conductor cable. Double (2-way) pedestrian signals will only be installed with the approval of Plant City Traffic Operations to ensure compliance with ADA requirements. All pedestrian buttons will have a separate 2-conductor cable (belden) run from the button to the controller cabinet with no splices. The bare wire for the belden will be tied to ground in the controller cabinet.

11October 2025

Replace the third paragraph with the following paragraphs

All spare signal cable conductors will be labeled as spare and terminated on the ground bus in the controller cabinet. Provide sufficient length for each spare cable to be utilized for future use anywhere in the controller cabinet.

The spares in a signal disconnect will be terminated on the stainless-steel terminal strip inside the disconnect. All spares shall be routed from the overhead mast arm signals to the hand hole (terminal compartment). All other spares (mast arm, signal heads, pedestrian heads) will be individually capped and taped.

632-3.2 Protection of Cable:

Replace the first paragraph with the following paragraph

End bells must be installed on all conduit ends prior to pulling cable in PVC conduit. Rigid conduit will have a grounding bushing (if appropriate) or a PVC bushing on the rigid conduit end. Grommets must be installed on all metal poles where cable passes through a drilled or manufactured hole unless the opening has been manufactured in such a manner that cable will not be damaged by pulling it through the opening or by the cable laying on the pole opening.

632-3.3 Cabling for a Mast Arm Assembly Replace the subsection with the following language

632-3.3 Cabling: Obtain the color code from The City of Plant City Traffic Operations prior to ordering and to wiring the signals and controller cabinet.

632-3.3.1 Cabling for a Mast Arm Assembly: If the mast arm has a terminal compartment, sufficient trunk cable conductors will be pulled from the controller cabinet to the mast arm terminal compartment to provide for cabling of the signals. The trunk cables will be terminated on a stainless-steel terminal strip mounted in the terminal compartment. The terminal strip will be manufactured with stainless-steel screws. The terminal compartment size will be as specified on the signalization General Note sheet.

The stainless-steel terminal strip will be sized to ensure that no more than three fork terminals will be installed on any one terminal position of the stainless-steel terminal strip. Provide cabling and spare conductors as defined in 632-3.1.2 and 632-3.1.3

The signal cable for each signal attached to the mast arm will protrude from the bottom of the mast arm through a grommeted hole. The cable will be formed into a drip loop and then enter the signal through the lower arm of the mast arm astro-

12October 2025 bracket assembly. The drip loop will be held in place by the use of UV rated cable ties having a minimum width of 3/8”.

632-3.3.2 Cabling for Installations Using a Junction Boxes: The cables running across a span wire installation will be lashed to the messenger wire using appropriately sized lashing rods. Cable ties will be used only in the area of the drip loops.

NEMA approved water-tight enclosures (junction boxes) will be mounted on each strain pole at each corner of the intersection near the weatherhead or span wire attachment point. An appropriately sized trunk cable will be run from the NEMA enclosure to the controller cabinet. Individual cables, with required spares, will be installed between the NEMA enclosure and individual signal heads. All terminations in the NEMA enclosure will be terminated on a stainless-steel terminal strip in the NEMA enclosure. The stainless-steel terminal strip will be sized to ensure that no more than three fork terminals will be installed on any one terminal position of the stainless-steel terminal strip. Spare conductors from each signal head will be tied to ground in the NEMA enclosure. All entries into the NEMA enclosure will be with water-tight connectors. Provide cabling and spare conductors as defined in 632-3.1.

Add the following subsection

632-3.5 Labeling: All cables and wires will be adequately labeled to ensure identification of their purpose. Labels will be permanent in nature. Coordinate with The City of Plant City's Traffic Operations Section for the current color code labeling detail.

Typical color code labeling is as follows:

13October 2025

Terminal #

Wire Color Solid Red Solid Orange Solid Green Solid Blue

Red w/black stripe Orange w/black stripe Green w/black stripe Blue w/black stripe

Black

Signal Indication Main Street Red Main Street Yellow Main Street Green Main St Yellow Arrow (5-Section) Minor Street Red Minor Street Yellow Minor Street Green Main St Green Arrow (5-Section) Red Arrow (Protected)

Street Main Main Main Main

Side Side Side Main

Main/Side

10 Black w/white stripe

11 White w/black stripe

12 White 13 Red w/white stripe 14 Black w/red stripe 15 Green w/white stripe 16 Blue w/white stripe

Yellow Arrow (Protected/Permissive) Green Arrow (Protected/Permissive) Common/Neutral Red arrow (Protected) Yellow arrow (Protected) Green arrow (Protected) Spare

Main/Side

Main/Side

Neutral Spare (Typical) Spare (Typical) Spare (Typical) Spare

14October 2025

SECTION 633

COMMUNICATION CABLE

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

633-2.1.4 Patch Panels:

Add the following paragraph

Coordinate with The City of Plant City Traffic Operations or refer to the intersection plan sheets prior to ordering to ensure the correct equipment is ordered for the correct application.

633-2.2 Twisted Pair Cable:

Replace this section with the following paragraph

The City of Plant City does not allow twisted pair communications cable to be used for any of its traffic signals or related devices. Coordinate with The City of Plant City Traffic Operations Department prior to ordering communications cable to ensure the correct equipment is ordered for the correct application.

15October 2025

SECTION 634

SPAN WIRE ASSEMBLY

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

634-1 Description.

Replace the first sentence with the following sentence

The City of Plant City does not allow span wire type traffic signals for any new traffic signal installations. The details contained in this section are strictly for repair of existing span wire traffic signals.

Replace the second sentence with the following sentence

Install fiberglass insulators on the upper span (catenary) at all locations where the span will be underneath an energized power line, regardless of the vertical clearance to the power line.

634-3.4 Span Wire Guidance Add the following paragraph

When the signal cable continues past a disconnect, saddle, gooseneck or similar device, the signal cable will be looped behind the signal device with sufficient slack to ensure the cable does not rub against the device assembly. A minimum of two inches of clearance will be obtained between the messenger block area or similar device and the cable running across the span. A lashing rod will be used to attach signal cable to the messenger or catenary. Cable ties will be used to dress up the drip loops at the disconnects or other terminating locations. The lashing wire will continue for one turn into the drip loop. Should work include running cable on an existing span with lashing wire, the contractor will un-lash the existing lashing rod, run the cable, and then re-lash. Multiple layers of lashing rod will not be allowed.

Insulators will be installed on the catenary where the catenary falls underneath a distribution or transmission electrical line. If insulators are installed and a disconnect and signal hanger fall under the insulator, a drop span will be installed underneath the insulator to allow for the installation of the signal hanger saddle clamp.

All disconnect doors will face traffic. Contact the Traffic Signal Operation's shop prior to installation if any questions may arise as to the orientation of the disconnect door.

16October 2025

SECTION 635

PULL, SPLICE, AND JUNCTION BOXES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

635-3.1 General:

Add the following paragraphs

Low voltage loops, pedestrian button, low voltage video detection, radar detection, and preemption system cables will be routed through the same low voltage pull box. No signal cable, interconnect cable, or high voltage cable will be routed through a low voltage pull box. Confirm with the manufacturer the voltage present prior to installing cable to ensure cable is placed in the appropriate pull box.

Signal cables, illuminated sign cables, pedestrian cables, high voltage video detection cables, and any other high voltage cabling will be routed through the same high voltage pull box. No low voltage or interconnect cables will be routed through the high voltage pull box.

Interconnect cables (copper and fiber) will be routed through the same pull box. No low voltage or high voltage cables will be routed through the interconnect pull box.

When existing pull boxes and conduits are being re-used (signal update), exception requests may be made to the requirement to separate low voltage, high voltage, and interconnect cables. Exceptions must be requested prior to starting the installation. Exceptions will not be accepted for new traffic signal installations.

635-3.2.1 Placement and Spacing:

Replace items 2 and 3 with the following

2. Approximately every 500 feet for fiber optic cable applications in rural areas with any continuous section of straight conduit if no fiber optic cable splice is required.

3. At a maximum of 300 feet for fiber optic cable applications in metropolitan areas.

Add the following item

9. Pull boxes will be installed with the greatest length of the pull box perpendicular to the roadway.

17October 2025

ELECTRICAL POWER SERVICE ASSEMBLIES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

639-4 Installation Requirements

639-4.1 General:

Add the following paragraphs

639-4.5

The City of Plant City Traffic Operations Department will obtain the electrical service address from Hillsborough County's 911 Streets and Address’ office. If the electrical service provider is Tampa Electric Company's (TECO), the traffic signals’ address will end with “1/8” per TECO's direction. All other electrical services (cameras, MVDS, DMS, ITS hub, etc.) will not have a fraction after the address. If the electrical service provider is not TECO, the traffic signals’ address will be per the electrical service provider's requirements.

Obtain a layout number from the electrical service provider by submitting a Commercial Service Application prior to installation of the electrical power service. Once the layout number is obtained, arrange to meet the assigned electrical service provider's field engineer on sight to confirm the exact location and type of feed (overhead or underground). If the location of the electrical service is required to be changed by the electrical service provider, immediately advise The City of Plant City Traffic Operations Department so a new, corrected address can be obtained from the City's 911 Streets and Address’ office.

The contractor will be responsible for any additional costs associated with the installation of the electrical power service.

Meter Base:

Replace the first paragraph with the following

Provide a bypass type meter, rated at a minimum of 200 amps, and approved by the electrical service provider. Securely fasten the meter to a separate electric service concrete pole. The service meter/disconnect will not be mounted on the traffic controller cabinet, traffic signal concrete pole, steel strain pole, or mast arm pole.

Install the meter/disconnect at a height that meets the requirements of the power service provider.

Install the pole, meter, and disconnect within 15 feet of the point of service. If the point of service is in excess of 50 feet from the controller cabinet or if there is an obstruction that impedes reaching the disconnect, install a separate pole, electrical

18October 2025 disconnect, and surge protection in close proximity of the controller cabinet, not to exceed 15 feet.

Attach the address of the electrical service to the meter as directed by the electrical service provider.

19October 2025

SECTION 641

PRESTRESSED CONCRETE POLES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

641-5 Pole Removal.

Replace the section with the following paragraphs

Completely remove each pole including the foundation and all accessories and attachments, such as pole keys, dead men, guying apparatus, conduit, anchor bolts, and reinforcing steel.

If a complete foundation removal cannot be performed, request for a removal of the pole and partial foundation may be submitted to the City for approval. The remaining pole, foundation, and any protrusions, such as pole keys, dead men, guying apparatus, conduit, anchor bolts, or reinforcing steel, must be removed to a minimum depth of eight feet below existing grade.

Disconnect span wires carefully at the pole and salvage all usable hardware and attachment devices as determined by the City. Remove all devices supported by the span wire (including wiring) prior to the removal of the span wire.

October 2025 20

SECTION 649

GALVANIZED STEEL POLES, MAST ARMS, AND MONOTUBE ASSEMBLIES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

649-10 Method of Measurement.

Replace the third and fourth paragraphs with the following paragraphs

Completely remove the pole including the foundation and all accessories or attachments as listed in Section 641-5.

If a complete foundation removal cannot be performed, request for a removal of the pole and partial foundation may be submitted to the City for approval. Remove the pole, foundation, and all accessories or attachments (including pole keys, dead men, guying apparatus, conduit, anchor bolts and reinforcing steel) to a minimum depth of eight feet below existing grade.

October 2025 21

SECTION 650

VEHICULAR TRAFFIC SIGNAL ASSEMBLIES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

650-3 Installation

650-3.4 Aiming of Signal Indication:

Add the following paragraph

Aim the signal to obtain the best possible view by the driver in the lane or lanes associated with the particular signal. If, in the opinion of the City of Plant City representative, the signal is not aimed correctly, the signal contractor will re-aim the signal at no additional cost to the City.

650-3.5 Wiring Connections:

Add the following sentences

Provide a separate neutral circuit for each approach. Provide cabling as described in section 632.

October 2025 22

SECTION 653

PEDESTRIAN SIGNAL ASSEMBLIES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

653-2 Materials:

Add the following paragraph

Pedestal mounted pedestrian signals will be mounted on a 4-1/2” (OD) spun aluminum pole mounted with a threaded transformer base.

23October 2025

SECTION 654

MIDBLOCK CROSSWALK ENHANCEMENT ASSEMBLIES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

654-2 Materials.

Add the following paragraph

All midblock crosswalk enhancement assemblies must be compatible with the existing midblock crosswalk enhancement assemblies. Provide a UPS for pedestrian hybrid beacon assemblies that meet the requirements of Section 685.

654-3 Installation Requirements.

Add the following sentence

Tactile arrows of accessible pedestrian pushbuttons must align parallel with the direction of the associated crossing.

Add the following subsection

654-3.1 Advance Notification: Provide Portable Changeable Message Signs (PCMS), a minimum of one per direction or as shown on the plans, ten (10) working days in advance prior to activating crosswalk enhancement assembly. Coordinate with The City of Plant City's Traffic Operations Department for the required message to be displayed on the PCMS.

24October 2025

SECTION 660

VEHICLE DETECTION SYSTEM

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

660-1 Description.

Add the following subsections

660-1.1 Video Description: Furnish and install a video vehicle detection system compatible with The City of Plant City's existing system including cameras, cabling, and peripheral equipment in the controller cabinet. Video detection systems used by The City of Plant City include conventional video, forward looking infrared video, and single ultra wide-angle video. Contact the City of Plant City Traffic Operations Department to determine the type of video to utilize or as identified in the Contract Documents.

660-1.2 Microwave (Radar) Description: The City of Plant City does not currently utilize any Microwave Detection technology. Contact the City of Plant City Traffic Operations Department to determine the type of microwave (radar) to utilize if microwave detection technology is identified in the Contract Documents.

660-1.3 Vehicle Detection Loops: Furnish and install vehicle detection that complies with the FDOT Design Specifications. Place Type A loops (6’ X 30’) two feet in front of the stop bar. Place Type B loops (6’ X 6’) 50’ behind the stop bar. Place Type F loops (6’ X 30’) two feet in front of the stop bar. Type A and Type F loops may have to be positioned further than two feet in front of the stop bar to preclude operational issues. Provide 6’ X 30’ Type F loops for left turn and side street approaches unless otherwise noted in contract documents. Contact The City of Plant City Traffic Operations Department to confirm position prior to cutting loops.

660-2

660-2.1

Materials

General:

Add the following sentence

All video, microwave (radar), and Bluetooth vehicle detection equipment will be compatible with the existing video, microwave (radar), and Bluetooth detection equipment used by The City of Plant City or as specified in the Contract Documents.

25October 2025

660-3 Installation Requirements

660-3.2 Vehicle Detection Loops:

Add the following sentence

A minimum of 48 hours’ notice must be provided to the City of Plant City Traffic Operations department in advance of cutting any detection loops into the roadway. City of Plant City personnel must be on site during loop cutting.

660-3.2.2 Saw Cuts:

Add the following paragraphs

The loop and lead-in will be cut so that the wire will not take more than a 55° angle at any corner. Where new loops are being installed over the top of existing loops, an additional saw cut will be made in the existing loop at the top and bottom of the loop to ensure that the existing loop does not interfere with the operation of the new loop.

660-3.2.7 Splicing:

Add the following sentence

All loop splices will be per the latest version of the FDOT Standard Plans for Road and Bridge Construction, index 660-001, except all connection at splice points will be soldered prior to installation in an appropriate enclosure.

660-3.2.9 Loop Assembly Identification:

Add the following paragraphs

Use a permanent marker to write on the tag or marker in the controller or detector cabinet.

Example:

EB O/S — Phase 6 EB Center — Phase 6 EB I/S- Phase 6

Where: EB is Eastbound;

O/S is Outside/Shared; and I/S is Inside/Shared.

In the case of new signal installations, loops will be numbered sequential in a L-# format (e.g. L-1, L-2), starting with the first loop clockwise from the controller cabinet and continuing in a clockwise direction around the intersection. If the configuration is non-standard, coordinate with the City of Plant City Traffic Operations office.

26October 2025

Add the following subsection

660-3.2-11 Loop Position: All loops will be positioned in the center of the lane. Check with the City of Plant City representative prior to cutting the loop to ensure proper placement.

If the final placement of the stop bar results in the loop position being incorrect, the signal contractor will have to re-cut the effected loop at no cost to the City.

660-3.3 Video Detector Installation:

Add the following paragraphs

All cameras will be located on the lane line between the left-turn lane and thru lane except in cases where there is more than one camera per approach. If a single ultra-wide angle video system is being installed, install the camera based on the manufacturer's recommendations. If there is no left-turn lane, center the camera with the approaching lanes.

Coordinate the optimal mounting location with the manufacturer. Furnish and install the manufacturer's recommended cable between the camera and the interface panel or terminating point in the controller cabinet. The cable will be continuous from the camera to the interface panel in the controller cabinet with no splices. Connections to the camera will be per the manufacturer's recommendations.

An approved surge protection device shall be installed between the camera and the processor located within the controller cabinet. Coordinate with City of Plant City Traffic Operations Department for approved surge protection devices.

The contractor will be responsible for the initial setup of the video detection system.

This can be achieved using the contractor's own trained employees or with a manufacturer's field representative. If the video detection is initially set up for temporary traffic control, a final video detection setup will be performed by the contactor prior to final acceptance.

660-3.4 Microwave Detector Installation:

Add the following paragraphs

Coordinate the optimal mounting location(s) with the manufacturer. Furnish and install the manufacturer's recommended cable between the microwave detector and the interface panel or terminating point in the controller cabinet. The cable will be continuous from the microwave detector to the interface panel in the controller cabinet with no splices. Connections to the microwave detector will be per the manufacturers' recommendations.

The contractor will be responsible for the initial setup of the microwave detection system. This can be achieved using the contractor's own trained employees or with a manufacturer's field representative. If the microwave detection system is initially set up for temporary traffic control, a final microwave detection setup will be performed by the contactor prior to final acceptance.

27October 2025

SECTION 663

SIGNAL PRIORITY AND PREEMPTION SYSTEMS

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

663-1 Description:

Add the following paragraphs

Furnish and install an emergency and low priority control infrared, GPS/radio, or cloud-based preemption system including detectors, cabling, discriminator (as required), discriminator rack (as required), green sensing harness (as required), GPS/radio related equipment, field monitoring unit, and other peripheral equipment necessary to provide a complete operational emergency and low priority control infrared, GPS/radio, or cloud-based preemption system that is compatible with the existing system installed in The City of Plant City. Contact The City of Plant City Traffic Operations Department to determine if infrared, GPS/radio, or a cloud-based preemption system is required.

663-2 Materials:

Add the following paragraphs

All emergency and low priority control infrared, GPS/radio and cloud-based preemption detection equipment installed in The City of Plant City will be compatible with the existing preemption detection equipment. It will include two-cone single channel detectors for multi-lane approaches, and single-cone single channel detectors on single lane approaches, cabling, applicable GPS/radio equipment, the applicable discriminator, a discriminator rack (as required), a green sensing harness (as required), and a field monitoring unit (as required).

663-3 Installation:

Add the following paragraphs

All emergency and low priority control preemption infrared detectors will be installed in a location on each approach to provide optimal reception of the optical signal transmitted by the emergency vehicle. Two-cone single-channel infrared detectors will be installed on multi-lane approaches to provide optimal operation.

Only factory cables are to be installed to connect the detectors to the controller cabinet. There will be no splices in any pre-emption cable.

The signal contractor will be responsible for the initial set up of the emergency/low priority pre-emption detection system. This can be achieved using the contractor's own trained employees or with a factory field technician. The

28October 2025 pre-emption detection system set up will be such that the pre-emption emitter can be received from approximately ¼-mile. Specific emitter programming will be setup by The City of Plant City.

663-6 Method of Measurement Add the following paragraphs

The contract unit price for Emergency and Low Priority control preemption detection equipment, furnished and installed, will include all necessary multi-lane and single lane detectors, factory cables, discriminator, discriminator rack (as required), GPS/radio equipment (as required), green sensing harness (as required), and a field monitoring unit (as required) along with any other necessary equipment or hardware to complete the installation.

29October 2025

SECTION 665

PEDESTRIAN DETECTION SYSTEM

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

665-4 Installation:

Add the following paragraphs

The pedestrian detector wires will be individual single pair IMSA 50-2 wires connected continuously from the detector to the controller cabinet in low voltage conduits and pull boxes. Splicing is not allowed for the pedestrian detector wires.

The pedestrian detector wires will not share a cable with any other device, including the pedestrian signal head assembly.

Install the pedestrian detector assembly at a location and mounted in a manner to meet ADA requirements and to facilitate the use of the FDOT FTP-68B-06 pedestrian sign. The FTP-68B-06 sign will be mounted above the pedestrian detector. The detector and sign will be orientated correctly to allow the sign to be used with a left or right arrow. The ADA pedestrian detector will be a non-mechanical button (piezo) solid state switch with raised arrow and audible ‘beep’ and LED light activation upon pressing the button. The detector will have to be ADA accessible compliant with a sufficient level surface where the sign and detector are located. All detectors used must be of the same manufacturer and model.

Only ADA compliant detectors are allowed. When an Accessible Pedestrian System (APS) is required, the APS will be compatible with existing systems being utilized in The City of Plant City. The APS pushbutton assembly will have a sign equivalent to FDOT FTP-68B-06. The APS pushbuttons will have the following features as a minimum:

- Confirmation of button push via latching LED, sound and vibrotactile bounce.

- Direction of travel voice with extended button push.

- Locating tone during Don't Walk.

- Cuckoo, chirp, and voice message during walk.

- Verbal countdown during pedestrian clearance.

- All sounds automatically adjust to ambient noise over 60db range.

- Customized walk mode sound (voice) for specific street crossing.

Place the detector housing or saddle in complete contact with the pole. Do not mount the pedestrian detector on the controller cabinet. The pedestrian detector assembly and sign will be mounted to allow for the use of the arrow shown on the pedestrian sign.

30October 2025

When an APS is required, an APS Central Control Unit (CCU) is required inside the traffic controller cabinet. The contractor will wire power for the APS CCU in the controller cabinet as specified by The City of Plant City Traffic. Do not use a 3-prong electric plug to obtain power for the APS CCU. The contractor will install and wire the APS CCU and APS push buttons per the manufacturer's written installation specifications. The initial settings will be per factory specifications.

Contact The City of Plant City Traffic Division Operations (Traffic Signal) office for compatible systems and for specific settings for the APS push buttons.

31October 2025

SECTION 671

TRAFFIC CONTROLLERS

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

671-1 Licenses:

Add the following paragraph

Contractor shall include all available licenses for operating all capabilities within the controller and central traffic management system pertaining to the traffic controller installation.

671-2 Materials : Add the following paragraphs

Furnish and install a TS2 Type 1 ATC controller in a NEMA Type 6 ATC controller cabinet. TS2 Type 1 controllers will be ATC controllers fully capable of operating with The City of Plant City's current central traffic management system (ATMS.now).

32October 2025

SECTION 676

CONTROLLER CABINET ASSEMBLIES

The following are changes, additions or deletions to FY 2024-25 FDOT Standard Specifications for Road and Bridge Construction:

676-1 Description:

Replace the first paragraph with the following paragraph

Furnish and install…