About this file

This file is an engineering drawing prepared by the City of Plant City Engineering Department in Plant City, Florida, depicting the temporary right-of-entry (TROE) agreement required with CSX Railroad for the North Woodrow Wilson Street Sidewalk Improvements project. The drawing, dated January 28, 2026, shows the project location and limits, which encompass the area along North Woodrow Wilson Street from West Lowry Avenue extending to the CSX railroad corridor. The project proposes the addition of sidewalk on the east side of North Woodrow Wilson Street, incorporating flexible paving, grading, drainage, concrete sidewalks and driveways, stripping, signage, tree removal, sodding, and replacement of an existing potable watermain and appurtenances. The scope also includes coordination for relocation of underground private utilities within the project schedule. The drawing illustrates the project boundaries in relation to surrounding streets including West Reynolds Street, West Granfield Avenue, North Mobley Street, Lemons Street, and Figs Street.

The project is funded through Community Development Block Grant (CDBG) program resources. The TROE agreement with CSX Railroad is a critical component of project execution, as the railroad's right-of-way intersects the project limits at the northern terminus of the sidewalk improvements. No specific pricing information, bidding timelines, response dates, or contract award details are contained within this engineering drawing.

View the file

Other files

File Type Posted
26-024EN-IFB_Pre-Proposal_Meeting_Sign-in_Sheet.pdf PDF
Tampa_Times_Ad_legal_with_meeting.docx DOCX document
TAMPA_BAY_TIMES_AD_PLACEMENT_REQUEST_FORM_02.16.26.pdf PDF
North_Woodrow_Wilson_Street_Sidewalk_Improvements_CDBG.pdf PDF
FL20260252_WageDetermination.pdf PDF
HUD_24_CFR,_Part_75_Section_3.pdf PDF
BABA_FORM.pdf PDF
2026-03-20_N._Woodrow_Wilson_Sidewalk_Improvement_Construction_Contract.pdf PDF
HUD_Form_4010_updated_10.2023.pdf PDF
[I]_ROW_Use_Permit_Application.pdf PDF
GC_and_Subcontractor_E-Verify_Affidavit_(07-12-23)CAO.pdf PDF
Federal_Debarment_Certification_Form_Final_(9-12-23).pdf PDF
Davis_Bacon_and_Section_3_Acknowledgment_Form.docx.pdf PDF
[B]_Construction_Plans-DS.pdf PDF
[A]_Project_Exhibits.pdf PDF
[G]_Material_&_Equipment_Storage_Site.pdf PDF
[D]_Technical_Manual_for_Water,_Wastewater_and_Reclaimed_Water_Utilities.pdf PDF
[F]_ERP_Project_Exemption_Approval_N_Woodrow_Wilson_Street_Sidewalk.pdf PDF
[C]_Technical_Specifications-DS.pdf PDF
[E]_Standards_Specs_for_Traffic_Control_Signals_&_Devices,_Signing,_Pavement_Marking,_and_Lighting_Construction.pdf PDF
Addition_to_Special_Provisions.docx DOCX document
Worksheet_for_Construction_Agreement_NWoodrowWilsonStSW.docx DOCX document
Bid_Form.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF PLANT CITY

ENGINEERING

302 W. REYNOLDS ST.

PLANT CITY, FL 33563

NORTH WOODROW WILSON STREET

SIDEWALK IMPROVEMENTS

CSX TEMPORARY RIGHT-OF-ENTRY

DATE: 1/28/2026

SCALE: NTS

SHEET NO

PROJECT LIMITS (APPROX.)

W. LOWRY AVE

N . P

LU

M

S T

LE

M

O N

S T

FI

G

S T

N . W

O O

D R

O W

W

IL

SO

N

S T

W. REYNOLDS ST

N . M

O

BL

EY

S

T

W. GRANFIELD AVE

LE

M

O N

S T N

. M O

BL

EY

S T

S.

W

O O

D R

O W

W

IL

SO

N

S T

TROE AGREEMENT REQUIRED

CSX RAILROAD

Sheets and Views
CSX TROE

File details come from the government source that posted it. Updated .