WORK_DIRECTIVE_CHANGE.pdf

PDF 48 KB Posted

Attached to
6" Water Main Gray Rd to Hazel Dell
Solicitation number
IFB-2026-015
Issued by
Hamilton County, Indiana

About this file

This is a Work Directive Change form issued by the City of Carmel's Board of Public Works and Safety for the 6" Water Main Gray Road to Hazel Dell project located in Hamilton County, Indiana. The form serves as authorization for modifications to the existing contract work and enables the contractor to proceed with revised scope elements. The directive change includes provisions for adjustments to the project completion date, with options to add days, deduct days, or leave the timeline unchanged. The form requires detailed documentation of the work covered by the directive, specification and drawing references, and the rationale for the order. Formal authorization requires approval from the Owner's Representative and signatures from the Board of Public Works and Safety members, including Laura Campbell as Presiding Officer, James Barlow and Alan Potasnik as Members, and Brad Pease as City Engineer.

A formal Contract Change Order will be issued to the contractor in the near future to address the financial impact of the Work Directive Change, with the specific amount to be determined and documented. The authorization process requires attestation by Jacob Quinn, City Clerk, and approval from all designated board members with dated signatures. This directive change form is part of the procurement process for the water main installation project involving approximately 2,600 feet of directional drilling along 96th Street from Gray Road to the Wastewater Treatment Plant at Hazel Dell, with original sealed bids accepted through the City's e-Procurement Portal with a deadline of 10:00 am on October 7, 2026.

View the file

Other files

File Type Posted
6"_Water_Main_Gray_Rd_to_Hazel_Dell_(Addendum_#1_Revision).pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
PAYMENT_BOND.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
Sealed_Bid_Sample_Agreement_-_FEMA.docx DOCX document
CONTRACT_CHANGE_ORDER.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
FIELD_ORDER.pdf PDF
MAINTENANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
2026-09-01_Carmel_Emergency_WM_to_WWTP.pdf PDF
MANUFACTURERS_LIST.pdf PDF
SAMPLE_BID_BOND.docx DOCX document
SUBCONTRACTORS_LIST.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: WORK DIRECTIVE CHANGE NO.______________

DATE: ______________________________________

PROJECT NAME:_____________________________

PROJECT NO.: _______________________________

Specification Reference

Drawing Reference:

DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:

REASON FOR THIS ORDER:

AUTHORIZATION:

THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS

OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.

PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.

By:_______________________________ Approved By:

Owner’s Representative

CITY OF CARMEL

BOARD OF PUBLIC

WORKS AND SAFETY

By:__________________________

Laura Campbell, Presiding Officer

By:__________________________ James Barlow, Member

By:__________________________ Alan Potasnik, Member

By:__________________________ Brad Pease, PE, City Engineer

DATE:_______________________

ATTEST:

DATE:_______________________

Jacob Quinn, Clerk

Version 2024-09-23