REQUEST_FOR_PROPOSAL_CHANGE.pdf
PDF 38 KB Posted
- Attached to
- 6" Water Main Gray Rd to Hazel Dell
- Solicitation number
- IFB-2026-015
- Issued by
- Hamilton County, Indiana
About this file
This is a Request for Proposal Change document issued by the City of Carmel, Indiana's Board of Public Works and Safety for the 6" Water Main Gray Road to Hazel Dell project. The document provides a template for contractors to submit proposals regarding potential modifications to an existing contract, with proposals required within fifteen (15) calendar days of the request date. The change request pertains to directional drilling of approximately 2,600 feet of 6-inch water main from Gray Road to the Wastewater Treatment Plant at Hazel Dell along 96th Street. Contractors must indicate whether the proposed change will result in an increase, decrease, or no change to the contract price and/or contract time, and must identify the effect of the change on the project's Substantial Completion and Final Completion dates if accepted within a specified timeframe.
Proposal submissions must include four (4) copies of a detailed breakdown showing quantities, cost of materials, equipment, labor, overhead, and profit, along with the basis for any additional time requested. The request explicitly states that acceptance of the proposal does not authorize the contractor to proceed with or stop previously scheduled work; a Contract Change Order and Notice To Proceed will be issued upon approval. The contractor must submit the proposal by the date specified by the Engineer and approved by the Owner's Representative. This document serves as a change management mechanism for the ongoing water main installation project and requires careful cost and schedule analysis from interested contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6"_Water_Main_Gray_Rd_to_Hazel_Dell_(Addendum_#1_Revision).pdf | ||
| NON_COLLUSION_AFFIDAVIT.pdf | ||
| PAYMENT_BOND.pdf | ||
| SAMPLE_OF_MOU_FOR_E-VERIFY.pdf | ||
| WORK_DIRECTIVE_CHANGE.pdf | ||
| RIGHT_OF_ENTRY.pdf | ||
| CONTRACT_CHANGE_ORDER.pdf | ||
| CONTRACT_CHANGE_REQUEST.pdf | ||
| Exhibit_D_E-Verify-1.PDF | ||
| FIELD_ORDER.pdf | ||
| MAINTENANCE_BOND.pdf | ||
| PERFORMANCE_BOND.pdf | ||
| SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf | ||
| Sealed_Bid_Sample_Agreement_-_FEMA.docx | DOCX document | |
| 2026-09-01_Carmel_Emergency_WM_to_WWTP.pdf | ||
| MANUFACTURERS_LIST.pdf | ||
| SAMPLE_BID_BOND.docx | DOCX document | |
| SUBCONTRACTORS_LIST.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: REQUEST FOR PROPOSAL NO
DATE:
PROJECT NAME:
PROJECT NO.:
Specification Reference:
Drawing Reference: _____________ Drawing Date:____________
Identification of Attachments:
Please submit within fifteen (15) calendar days of this request date a proposal showing increase, decrease or no change in Contract Price and/or Contract Time. Proposal shall be accompanied by four (4) copies of breakdown showing quantities, cost of material, equipment, labor, overhead, profit and basis for the additional time if any.
DESCRIPTION OF PROPOSED CHANGE COVERED BY THIS REQUEST:
REASON FOR CHANGE:
SPECIAL INSTRUCTIONS:
THIS REQUEST DOES NOT AUTHORIZE YOU TO PROCEED WITH THE ABOVE WORK
NOR STOP PREVIOUSLY SCHEDULED WORK. Upon approval a Contract Change Order and a Notice To Proceed will be issued.
Please state in your proposal the effect the acceptance of this Request will have on the Project’s Substantial Completion and Final Completion, if accepted within ___ days of proposal due date.
YOUR PROPOSAL DUE DATE: _____________________________________
By: _____________________________________ _________________ Engineer Date
Approved By: _________________________________ Owners Representative
File details come from the government source that posted it. Updated .