This document is a progress report template for a contractor working on a cemetery renovation project at Willamette National Cemetery. The template requires the contractor to provide details on work completed such as the number of compaction tests performed, flat granite markers set and aligned, soil tested, and turf area renovated by cemetery section. Space is also provided to note any circumstances affecting work progress such as weather delays. Both the contractor and cemetery director must sign upon completion to acknowledge receipt of the report.

The related federal contract opportunity is a multiple award solicitation from the Department of Veterans Affairs National Cemetery Administration seeking proposals for shrine renovations at multiple national cemeteries including Willamette National Cemetery. Offerors are to provide pricing for products and services to repair and improve shrines and memorials. The solicitation number is 36C78623B50261 and awards will be made to multiple vendors.

View the file

Other files

File Type Posted
(WNC) Attachment 8 - Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Attachment 2 - Contract Performance _ Quality Assurance Report.pdf PDF
(NMCP) ATT 3-CONTRACT DISCREPANCY REPORT (CDR).pdf PDF
(NMCP) ATT 8-Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Exhibit A - Work Areas_L-1.pdf PDF
(NMCP) ATT 5-DAILY MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf PDF
(WNC) Attachment 7 - Contractors Daily Log of Construction.pdf PDF
(NMCP) EXHIBIT C-FLAT MARKER REALIGNMENT DIAGRAMS.pdf PDF
(NMCP) ATT 7-CONTRACTOR_S DAILY LOG OF CONSTRUCTION.pdf PDF
36C78623B50261_1.docx DOCX document
899-NMCP-Mill-FY23-002_SOW_6.2.2023.docx DOCX document
(NMCP) ATT 4-INITIAL MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf PDF
(NMCP) EXHIBIT B-WORK AREA ENLARGEMENTS _ DETAILS-18x24.pdf PDF
WD - Honolulu.txt TXT text file
WD - Multnomah County.txt TXT text file
(NMCP) ATT 6-HERBICIDE APPLICATION DATA SHEET.pdf PDF
(WNC) Exhibit D - Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
907-Willamette NC-MILL-23-001_SOW_6.2.2023.docx DOCX document
Copy of IFB Lump Sum Division Spreadsheet - Shrine.xlsx XLSX spreadsheet
(NMCP) ATT 2-CONTRACT PERFORMANCE _ QUALITY ASSURANCE REPORT.pdf PDF
(WNC) Exhibit B - Flat Marker Details_L-2.pdf PDF
(WNC) Attachment 4 - Initial Headstone-Marker Raise and Realign Verification Survey.pdf PDF
(WNC) Exhibit C - Flat Marker Realignment Diagrams.pdf PDF
(WNC) Attachment 5 - Daily Headstone-Marker Raise _ Realign Verification Survey.pdf PDF
(WNC) Attachment 6 - Herbicide Application Data Sheet.pdf PDF
(NMCP) EXHIBIT A-WORK AREAS-11x17.pdf PDF
(WNC) Attachment 3 - Contract Discrepancy Report.pdf PDF
(NMCP) EXHIBIT D-Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
(NMCP) ATT 1-WORK SUMMARY _ PROGRESS REPORT.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Willamette National Cemetery National Shrine Project – FY23 Cemetery Section Renovation - Phase 4 Project No.: 907-Mill-FY23-001

ATTACHMENT 1

WORK SUMMARY & PROGRESS REPORT

BASE BID and OPTIONS 1 thru 4,: FLAT MARKER RAISE & REALIGNMENT

WORK SUMMARY & PROGRESS REPORT Period Covered:

From:

To:

Cemetery Location: Contractor:

Willamette National Cemetery 11800 SE Mt Scott Blvd Portland, OR 97086-6937

Project Title:

Cemetery Section Renovation – Phase

Flat Marker Raise and Re-alignment

Inspection / Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights—

1. Within a reasonable time after the defect was discovered or should have been discovered; and

2. Before any substantial change occurs in the condition of the item unless the change is due to the defect in the item.

Work Completed & Submitted for Acceptance (This form is not to be used as an Invoice)

BASE BID and OPTIONS 1, 2, 3, and 4

1. Compaction Testing

Total number of compaction tests ► _________/ EA

Cemetery Section(s) ► __________

2.

Flat Granite Marker Setting, Alignment & Backfill onto Headstone Support System

Total # Flat Markers: ► _________/ EA

Cemetery Section(s) ► ____________

3. Soil Compaction Testing

Total number of compaction tests ► _________/ EA

Cemetery Section(s) ► __________

4. Base Compaction Testing

Total number of compaction tests ► _________/ EA

Cemetery Section(s) ► __________

5. R&R Flat Marker Headstones

Total # Flat Markers: ► _________/ EA

Cemetery Section(s) ► ____________

6. Clean Flat Markers

Markers cleaned ► ___________/ EA

Cemetery Section(s) ► ___________

7. Agricultural Soil Testing and Recommendations

Total number of soil tests ► _________/ EA

Cemetery Section(s) ► __________

8. Turf Renovation

Total Square Feet of Turf Area. ► ___________ SF

Cemetery Section(s): ► ____________

Report below any circumstances which may have adversely affected work progress such as weather, turf conditions, strikes, delays by the Government, etc.

Signature of Contractor: Date Signed

Signature of Cemetery Director /

COR

Date Signed

Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.