(NMCP) ATT 5-DAILY MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf

PDF 133 KB Posted

Attached to
Y1PZ--PSD SHRINES - NMCP and Willamette National Multiple Award
Solicitation number
36C78623B50261
Issued by

About this file

This document contains an attachment for a daily verification survey template to be used on a cemetery section renovation and headstone raising project at the National Memorial Cemetery of the Pacific. The template requires listing the cemetery sections and headstones worked on for the day, any discrepancies or issues noted, and confirmation that all issues were resolved or reported to the district office if unresolved. The foreman, work leader, or other designated person must fill out and sign the template prior to the completion of each workday to verify the headstones were correctly raised and realigned.

The related federal contract opportunity is a multiple award task order contract for cemetery shrine maintenance and repair services at the National Memorial Cemetery of the Pacific and Willamette National Cemetery. The solicitation was issued by the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

File Type Posted
(WNC) Attachment 8 - Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Attachment 2 - Contract Performance _ Quality Assurance Report.pdf PDF
(NMCP) ATT 3-CONTRACT DISCREPANCY REPORT (CDR).pdf PDF
(NMCP) ATT 8-Flat Marker-R_R (only) Photo Log.pdf PDF
(WNC) Exhibit A - Work Areas_L-1.pdf PDF
(WNC) Attachment 7 - Contractors Daily Log of Construction.pdf PDF
(NMCP) EXHIBIT C-FLAT MARKER REALIGNMENT DIAGRAMS.pdf PDF
(NMCP) ATT 7-CONTRACTOR_S DAILY LOG OF CONSTRUCTION.pdf PDF
(WNC) Attachment 1 - Work Summary _ Progress Report (Flats).pdf PDF
36C78623B50261_1.docx DOCX document
899-NMCP-Mill-FY23-002_SOW_6.2.2023.docx DOCX document
(NMCP) ATT 4-INITIAL MARKER RAISE _ REALIGN VERIFICATION SURVEY.pdf PDF
(NMCP) EXHIBIT B-WORK AREA ENLARGEMENTS _ DETAILS-18x24.pdf PDF
WD - Honolulu.txt TXT text file
WD - Multnomah County.txt TXT text file
(NMCP) ATT 6-HERBICIDE APPLICATION DATA SHEET.pdf PDF
(WNC) Exhibit D - Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
907-Willamette NC-MILL-23-001_SOW_6.2.2023.docx DOCX document
Copy of IFB Lump Sum Division Spreadsheet - Shrine.xlsx XLSX spreadsheet
(NMCP) ATT 2-CONTRACT PERFORMANCE _ QUALITY ASSURANCE REPORT.pdf PDF
(WNC) Exhibit B - Flat Marker Details_L-2.pdf PDF
(WNC) Attachment 4 - Initial Headstone-Marker Raise and Realign Verification Survey.pdf PDF
(WNC) Exhibit C - Flat Marker Realignment Diagrams.pdf PDF
(WNC) Attachment 5 - Daily Headstone-Marker Raise _ Realign Verification Survey.pdf PDF
(WNC) Attachment 6 - Herbicide Application Data Sheet.pdf PDF
(NMCP) EXHIBIT A-WORK AREAS-11x17.pdf PDF
(WNC) Attachment 3 - Contract Discrepancy Report.pdf PDF
(NMCP) EXHIBIT D-Example Site Survey Headstone Realignment and Grading Plans.pdf PDF
(NMCP) ATT 1-WORK SUMMARY _ PROGRESS REPORT.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Memorial Cemetery of the Pacific National Shrine Project – FY23 Cemetery Section Renovation - Phase V Project No.: 899-Mill-FY23-002

ATTACHMENT 5

DAILY HEADSTONE/MARKER RAISE & REALIGN VERIFICATION SURVEY

Station Number:__________ Date:_____________________

Cemetery: _______________ Cemetery Director: _______________

COR: ___________________

Instructions: Prior to the completion of the workday, the Cemetery Director/COR/Foreman/Work Leader/designee MUST perform a re-verification survey for ALL completed work of headstones/markers included in the scope of work. The Cemetery Director/COR/Foreman/Work Leader/designee will use the original Burial Register Report and Gravesite Layout Map used for the Initial Verification Survey.

List Sections and Headstones/Markers R&R: __________________________________

List discrepancy/issue: ___________________________________________________

All discrepancies/issues resolved: Y/N ______

Cemetery Director/COR/Foreman/ Work Leader/designee informed District Office Director and Contracting Officer of all unresolved discrepancies/issues: Y/N _______

By signing below, I certify the Headstone/Marker re-verification survey was completed.

Daily Headstone Verification:

Date: __________ Time Completed: ______________

COR/Director/Foreman/Work Leader/designee Signature: ________________________

File details come from the government source that posted it. Updated .