Copy of IFB Lump Sum Division Spreadsheet - Shrine.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C78623B50261
About this file
This spreadsheet template is to be used to break out lump sum pricing for various construction divisions for a shrine project with the Department of Veterans Affairs National Cemetery Administration. Bidders are to provide lump sum pricing for each of the 16 construction divisions that will be utilized on the project, including divisions for general requirements, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, plumbing, HVAC, electrical, and communications. Pricing should be broken out into separate CLINs for the base project and any option periods. The related federal contract opportunity is a multiple award solicitation for national shrine projects, with a solicitation number of 36C78623B50261 and is being conducted by the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number |
| Project Name |
| Division | CLIN 1 | CLIN 2 | CLIN 3 | CLIN 4 | CLIN 5 | CLIN 6 | CLIN 7 | CLIN 8 | CLIN 9 | Total |
| Division 0 | ||||||||||
| Special Sections | ||||||||||
| Division 1 | ||||||||||
| General Requirements | ||||||||||
| Division 2 | ||||||||||
| Existing Conditions | ||||||||||
| Division 3 | ||||||||||
| Concrete | ||||||||||
| Division 4 | ||||||||||
| Masonry | ||||||||||
| Division 5 | ||||||||||
| Metals | ||||||||||
| Division 6 | ||||||||||
| Wood and Plastic | ||||||||||
| Division 7 | ||||||||||
| Thermal and Moisture | ||||||||||
| Division 8 | ||||||||||
| Doors and Windows | ||||||||||
| Division 9 | ||||||||||
| Finishes | ||||||||||
| Division 10 | ||||||||||
| Specialties | ||||||||||
| Division 11 | ||||||||||
| Equipment | ||||||||||
| Division 12 | ||||||||||
| Furnishings | ||||||||||
| Division 13 | ||||||||||
| Special Construction | ||||||||||
| Division 22 | ||||||||||
| Plumbing | ||||||||||
| Division 23 | ||||||||||
| Heat, Ventilating, and Air Conditioning | ||||||||||
| Division 25 | ||||||||||
| Integrated Automation | ||||||||||
| Division 26 | ||||||||||
| Electrical | ||||||||||
| Division 27 | ||||||||||
| Communications | ||||||||||
| Division 28 | ||||||||||
| Electronic Safety and Security | ||||||||||
| Division 31 | ||||||||||
| Earthwork | ||||||||||
| Division 32 | ||||||||||
| Exterior Improvements | ||||||||||
| Division 33 | ||||||||||
| Utilities | ||||||||||
| Bonds |
*Each Project requires it's own Spreadsheet. Bidder shall breakout Base CLIN (0001) and any Options CLINs associated.
File details come from the government source that posted it. Updated .